COUPLING,DWG.912-9851,FOR PP-467A
Material 4300073818 · COUPLING · Plant 1000
BLong-leadReorderNormalBelow reorder point
- Material
- 4300073818
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- TIRTA SUPLINDO LESTARI PT
- Lead time
- 130 d · P80 192 d
- Unit price
- Rp 8.6M
Recommendation
- 1.Forecast 1.1 SET/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~130 days; expected demand during lead time 0.4.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
- 5.Long lead time: 80% of deliveries took up to 192 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 17.1M · order by 01 Oct 2026
Expected arrival ≈ 130 days
Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.3%
stockout risk now 1%
Unit price
Rp 8.6M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 121 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 252.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~44 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-467A BFW PUMP | B | 1 | 7 | 1.90 |
Lead time and procurement
Lead time 130 ± 42 days (PO history, 3 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Jan 2026 | PR03 Regular replenishment | 1 | Rp 8.6M | 27 Jul 2026 | 179 d |
| 11 Aug 2025 | PR03 Regular replenishment | 2 | Rp 8.6M | 29 Dec 2025 | 140 d |
| 28 May 2025 | PR04 Regular (other) | 1 | Rp 8.2M | 14 Dec 2025 | 200 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Aug 2026 | Medium | PX_PP-467A | Install scaffolding at PP-467A |
| 23 May 2026 | Medium | PX_PP-467A | Leak from packing |
| 21 Feb 2026 | Low | PX_PP-467A | Leak from packing |
| 06 Nov 2025 | Low | PX_PP-467A | Leak from packing |
| 28 Sept 2025 | Medium | PX_PP-467A | Install scaffolding at PP-467A |
| 14 Sept 2025 | Medium | PX_PP-467A | PP-467A high vibration |
| 17 May 2025 | Low | PX_PP-467A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Jun 2026 | 1 | 201000011358 | Corrective |
| 03 Aug 2025 | 1 | 201000006671 | Corrective |