COUPLING,DWG.912-9851,FOR PP-467A

Material 4300073818 · COUPLING · Plant 1000

BLong-leadReorderNormalBelow reorder point
Material
4300073818
Category
COUPLING
Base unit
SET
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
TIRTA SUPLINDO LESTARI PT
Lead time
130 d · P80 192 d
Unit price
Rp 8.6M

Recommendation

  • 1.Forecast 1.1 SET/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~130 days; expected demand during lead time 0.4.
  • 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 192 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 17.1M · order by 01 Oct 2026
Expected arrival ≈ 130 days
Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.3%
stockout risk now 1%
Unit price
Rp 8.6M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 121 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 252.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~44 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-467A
BFW PUMP
B171.90

Lead time and procurement

Lead time 130 ± 42 days (PO history, 3 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
29 Jan 2026PR03
Regular replenishment
1Rp 8.6M27 Jul 2026179 d
11 Aug 2025PR03
Regular replenishment
2Rp 8.6M29 Dec 2025140 d
28 May 2025PR04
Regular (other)
1Rp 8.2M14 Dec 2025200 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Aug 2026MediumPX_PP-467AInstall scaffolding at PP-467A
23 May 2026MediumPX_PP-467ALeak from packing
21 Feb 2026LowPX_PP-467ALeak from packing
06 Nov 2025LowPX_PP-467ALeak from packing
28 Sept 2025MediumPX_PP-467AInstall scaffolding at PP-467A
14 Sept 2025MediumPX_PP-467APP-467A high vibration
17 May 2025LowPX_PP-467ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
02 Jun 20261201000011358Corrective
03 Aug 20251201000006671Corrective