COUPLING,DWG.939-2872,FOR PP-467A

Material 4300073868 · COUPLING · Plant 1000

BLong-leadReduceNon-moving
Material
4300073868
Category
COUPLING
Base unit
SET
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
TIRTA SUPLINDO LESTARI PT
Lead time
94 d · P80 139 d
Unit price
Rp 5.9M

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~94 days; expected demand during lead time 0.0.
  • 3.A 98.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 3 exceeds the level to keep (1) by 2.
  • 5.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.0%
stockout risk now 0%
Unit price
Rp 5.9M
PO history
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 18.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~44 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-467A
BFW PUMP
B171.90

Lead time and procurement

Lead time 94 ± 54 days (PO history + category, 2 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
30 Apr 2026PR03
Regular replenishment
1Rp 5.9M30 Jul 202691 d
31 May 2025PR03
Regular replenishment
2Rp 5.8M28 Sept 2025120 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Aug 2026MediumPX_PP-467AInstall scaffolding at PP-467A
23 May 2026MediumPX_PP-467ALeak from packing
21 Feb 2026LowPX_PP-467ALeak from packing
06 Nov 2025LowPX_PP-467ALeak from packing
28 Sept 2025MediumPX_PP-467AInstall scaffolding at PP-467A
14 Sept 2025MediumPX_PP-467APP-467A high vibration
17 May 2025LowPX_PP-467ALeak from packing

Recent goods issues

Never issued in the 17-month history.