TRIM SET,CONTROL VALVE,DWG.363-9048,FOR
Material 4300074417 · TRIM SET · Plant 1000
CMonitorTAM reserve
- Material
- 4300074417
- Category
- TRIM SET
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 178 d · P80 236 d
- Unit price
- Rp 56.7M
Recommendation
- 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~178 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Used only during the last turnaround (3 SET): keep it for the next one instead of treating it as slow-moving.
Last turnaround used 3Convert to Non StockSingle sourceOpen PO
On hand / on order
2 / 4
next delivery 18 Feb 2027
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 56.7M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (3 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 698,442/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1465 LEVEL CONTROL VALVE | C | 1 | 1 | 0.55 |
Lead time and procurement
Lead time 178 ± 83 days (PO history + category, 1 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Sept 2026 | PR03 Regular replenishment | 2 | Rp 56.8M | 23 Sept 2027 open | 369 d |
| 27 Jun 2026 | PR03 Regular replenishment | 2 | Rp 56.6M | 18 Feb 2027 open | 236 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Jun 2025 | High | PX_LCV-1465 | [MSI-B-25-MDR-273/M] Replace line |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Nov 2025 | 1 | 203000009623 | Turnaround |
| 26 Nov 2025 | 2 | 203000009623 | Turnaround |