TRAY VALVE,DWG.626-9931,FOR CL-1699
Material 4300074434 · TRAY VALVE · Plant 1000
BLong-leadReduceNon-moving
- Material
- 4300074434
- Category
- TRAY VALVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- CAHAYA LOGAM PRATAMA PT
- Lead time
- 61 d · P80 104 d
- Unit price
- Rp 183,381
Recommendation
- 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~61 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 3 exceeds the level to keep (2) by 1.
- 5.Long lead time: 80% of deliveries took up to 104 days and the fastest seen in its category 30 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 183,381
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 8.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~30 days.
Installed on 1 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-1699 DEMIN WATER COLUMN | B | 2 | 2 | 1.23 |
Lead time and procurement
Lead time 61 ± 25 days (PO history + category, 2 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 05 Feb 2026 | PR06 Regular replenishment | 2 | Rp 184,571 | 02 Mar 2026 | 25 d |
| 18 Nov 2025 | PR04 Regular (other) | 2 | Rp 182,191 | 27 Jan 2026 | 70 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Sept 2025 | Medium | PX_CL-1699 | Leak from packing |
| 17 Jun 2025 | Medium | PX_CL-1699 | PSM25/Leak from packing |
Recent goods issues
Never issued in the 17-month history.