Sparely
DU

BEARING,JOURNAL,DWG.243-3352,FOR KC-226

Material 4300074624 · BEARING · Plant 1000

ALong-leadReduceNon-moving
Material
4300074624
Category
BEARING
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
PERMATA SUPLINDO JAYA PT
Lead time
146 d · P80 290 d
Unit price
Rp 117.8M

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~146 days; expected demand during lead time 0.0.
  • 3.A 96.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 4 exceeds the level to keep (1) by 3.
  • 5.Long lead time: 80% of deliveries took up to 290 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
4 / 4
next delivery 05 Jan 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
96.3%
stockout risk now 0%
Unit price
Rp 117.8M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 45.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-226
HYDROGEN AIR COMPRESSOR
A162.28

Lead time and procurement

Lead time 146 ± 63 days (PO history, 3 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
19 Sept 2026PR05
Project / turnaround
2Rp 115.0M24 Jul 2028
open
674 d
03 Dec 2025PR10
Other
2Rp 117.8M22 Aug 2026262 d
04 Nov 2025PR05
Project / turnaround
2Rp 112.5M05 Jan 2027
open
427 d
10 Jun 2025PR06
Regular replenishment
2Rp 120.8M14 Apr 2026308 d
06 Jun 2025PR06
Regular replenishment
2Rp 120.1M27 Oct 2025143 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Sept 2026LowPX_KC-226KC-226 bearing temp high
21 Aug 2026LowPX_KC-226KC-226 high vibration
16 Jan 2026LowPX_KC-226KC-226 bearing temp high
10 Nov 2025LowPX_KC-226Overhaul
21 Oct 2025MediumPX_KC-226Install scaffolding at KC-226
23 May 2025LowPX_KC-226[MSI-B-25-BPY-311/M] Replace line

Recent goods issues

Never issued in the 17-month history.