SEAL,LABYRINTH,DWG.782-4118,FOR KC-853D

Material 4300074789 · SEAL · Plant 1000

BLong-leadMonitorStockout
Material
4300074789
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
ATLAS TURBO SERVICES INC
Lead time
139 d · P80 213 d
Unit price
Rp 37.4M

Recommendation

  • 1.Forecast 0.6 SET/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~139 days; expected demand during lead time 0.2.
  • 3.A 97.7% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Long lead time: 80% of deliveries took up to 213 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 10 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
97.7%
stockout risk now 0%
Unit price
Rp 37.4M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 489 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 231.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~71 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-853D
SLOP OIL COMPRESSOR
B141.85

Lead time and procurement

Lead time 139 ± 65 days (PO history + category, 1 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
25 Aug 2026PR06
Regular replenishment
2Rp 37.4M10 Dec 2026
open
107 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Apr 2026MediumPX_KC-853DLeak from packing
13 Apr 2026LowPX_KC-853DLeak from packing
02 Dec 2025MediumPX_KC-853DReplace lamp as per PM finding
27 May 2025LowPX_KC-853DRepair insulation KC-853D

Recent goods issues

Posting dateQtyOrderOrder type
30 May 20251201000016351Corrective