BEARING,JOURNAL,DWG.457-6962,FOR KC-853D
Material 4300074930 · BEARING · Plant 1000
BLong-leadReduceExcess
- Material
- 4300074930
- Category
- BEARING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- RAJAWALI REFRAKTORI PRATAMA PT
- Lead time
- 131 d · P80 127 d
- Unit price
- Rp 241.7M
Recommendation
- 1.Forecast 0.8 SET/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~131 days; expected demand during lead time 0.3.
- 3.A 74.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 2 exceeds the level to keep (1) by 1.
- 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
2 / 1
next delivery 22 Apr 2027
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
74.6%
stockout risk now 0%
Unit price
Rp 241.7M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 168 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 101.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~23 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-853D SLOP OIL COMPRESSOR | B | 1 | 4 | 1.85 |
Lead time and procurement
Lead time 131 ± 40 days (PO history + category, 1 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 28 Apr 2026 | PR05 Project / turnaround | 1 | Rp 239.4M | 22 Apr 2027 open | 359 d |
| 21 Jul 2025 | PR03 Regular replenishment | 1 | Rp 243.9M | 27 Aug 2026 | 402 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Apr 2026 | Medium | PX_KC-853D | Leak from packing |
| 13 Apr 2026 | Low | PX_KC-853D | Leak from packing |
| 02 Dec 2025 | Medium | PX_KC-853D | Replace lamp as per PM finding |
| 27 May 2025 | Low | PX_KC-853D | Repair insulation KC-853D |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Apr 2026 | 1 | 201000025702 | Corrective |