Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,161 spare parts
Order value Rp 0 · excess value Rp 1.79T · page 14 of 24
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100049908 POSITIONER,VALVE,MODEL TK366,GRAPHITE | C | Reduce | Potentially obsolete | 2 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 79.8M |
| 4300001722 POSITIONER,VALVE,DWG.856-9972,FOR FCV-25 | C | Reduce | Potentially obsolete | 2 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 79.8M |
| 4300027277 POSITIONER,VALVE,DWG.412-5959,FOR FCV-36 | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 79.8M |
| 4300012616 POSITIONER,VALVE,DWG.112-5291,FOR FCV-55 | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 79.8M |
| 4300034805 POSITIONER,VALVE,DWG.392-4574,FOR FCV-61 | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 79.8M |
| 4300059050 POSITIONER,VALVE,DWG.581-6577,FOR PCV-11 | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 79.8M |
| 4300038261 POSITIONER,VALVE,DWG.113-2115,FOR PCV-16 | C | Reduce | Potentially obsolete | 2 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 79.8M |
| 4300018324 SPRING,SAFETY VALVE,DWG.351-2352,FOR KT- | S | Reduce | Potentially obsolete | 9 EA | – | 4 / 10 | don't stock | – | 0% | −Rp 79.4M |
| 4300046876 SEAT RING,VALVE,DWG.313-7188,FOR PCV-106 | C | Reduce | Potentially obsolete | 7 EA | – | 4 / 8 | don't stock | – | 0% | −Rp 79.0M |
| 4300021818 SEAT RING,VALVE,DWG.342-9987,FOR TCV-191 | C | Reduce | Potentially obsolete | 7 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 79.0M |
| 4100051738 SEAT RING,VALVE,TYPE FG738,SS304 | S | Reduce | Potentially obsolete | 7 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 79.0M |
| 4300057891 THERMOWELL,DWG.327-9955,FOR TEL-1683 | C | Reduce | Potentially obsolete | 13 EA | – | 3 / 6 | don't stock | – | 0% | −Rp 78.7M |
| 4300061308 TRIM SET,CONTROL VALVE,DWG.633-8855,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300020431 TRIM SET,CONTROL VALVE,DWG.401-7189,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300036851 TRIM SET,CONTROL VALVE,DWG.247-1691,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300020813 TRIM SET,CONTROL VALVE,DWG.749-4805,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300008308 TRIM SET,CONTROL VALVE,DWG.299-9152,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 78.5M |
| 4300021100 TRIM SET,CONTROL VALVE,DWG.270-6751,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4100045002 TRIM SET,CONTROL VALVE,TYPE PM255,SS316 | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300050878 TRIM SET,CONTROL VALVE,DWG.898-8607,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300050955 TRIM SET,CONTROL VALVE,DWG.358-3105,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300019323 TRIM SET,CONTROL VALVE,DWG.376-9216,FOR | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4100044890 TRIM SET,CONTROL VALVE,MODEL EF699,INCOL | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300007593 TRIM SET,CONTROL VALVE,DWG.464-5810,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300054135 TRIM SET,CONTROL VALVE,DWG.893-8775,FOR | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300016129 TRIM SET,CONTROL VALVE,DWG.976-7877,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4100040285 CONNECTOR,MALE,1/4IN ODT,1/2IN NPT,SS316 | C | Reduce | Potentially obsolete | 633 EA | – | 10 / 17 | don't stock | – | 0% | −Rp 77.8M |
| 4100047659 DIAPHRAGM,ACTUATOR,SIZE WW898,VITON | C | Reduce | Potentially obsolete | 18 EA | – | 10 / 28 | 0 / 0 / 1 | – | 0% | −Rp 74.5M |
| 4100031452 TEE,3IN,3000#,A234WPB,BW | C | Reduce | Potentially obsolete | 140 EA | – | 5 / 8 | don't stock | – | 0% | −Rp 74.0M |
| 4100036568 VALVE,GLOBE,1/4IN,800#,A105,RF | C | Reduce | Potentially obsolete | 28 EA | – | 10 / 30 | don't stock | – | 0% | −Rp 73.6M |
| 4200010196 FAN,COOLING MOTOR,DWG.702-9936,FOR PP-17 | C | Reduce | Potentially obsolete | 58 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 72.7M |
| 4300073972 THERMOWELL,DWG.208-6367,FOR TEL-205-26B | C | Reduce | Potentially obsolete | 12 EA | – | 10 / 28 | don't stock | – | 0% | −Rp 72.6M |
| 4100055180 SWITCH,LIMIT,SIZE FY666,CS | C | Reduce | Potentially obsolete | 12 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 71.5M |
| 4300030369 SPRING,SAFETY VALVE,DWG.513-7435,FOR KT- | S | Reduce | Potentially obsolete | 8 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 70.5M |
| 4300043578 SPRING,SAFETY VALVE,DWG.981-2843,FOR KT- | S | Reduce | Potentially obsolete | 8 EA | – | 5 / 9 | don't stock | – | 0% | −Rp 70.5M |
| 4100042163 TUBING,TYPE QM619,INCOLOY | C | Reduce | Potentially obsolete | 201 M | – | 2 / 5 | don't stock | – | 0% | −Rp 69.0M |
| 4100056077 TRANSMITTER,PRESS,MODEL ED975,CS | S | Reduce | Potentially obsolete | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 68.3M |
| 4100057542 TRANSMITTER,DIFF.PRESS,0~2500MMH2O,FF | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 68.3M |
| 4300008551 SEAT RING,VALVE,DWG.976-9852,FOR LCV-165 | C | Reduce | Potentially obsolete | 7 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 67.7M |
| 4300019396 SEAT RING,VALVE,DWG.642-6270,FOR LCV-622 | C | Reduce | Potentially obsolete | 6 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 67.7M |
| 4300065403 SEAT RING,VALVE,DWG.879-7140,FOR LCV-798 | C | Reduce | Potentially obsolete | 6 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 67.7M |
| 4100042331 TUBING,TYPE RS713,MONEL | C | Reduce | Potentially obsolete | 194 M | – | 3 / 10 | don't stock | – | 0% | −Rp 66.6M |
| 4300057017 THERMOWELL,DWG.957-6080,FOR TEL-497 | S | Reduce | Potentially obsolete | 11 EA | – | 10 / 22 | don't stock | – | 0% | −Rp 66.6M |
| 4300074453 THERMOWELL,DWG.508-4647,FOR TEL-1021B | C | Reduce | Potentially obsolete | 11 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 66.6M |
| 4100039292 VALVE,NEEDLE,1/4IN NPT,3000PSI,SS316 | C | Reduce | Potentially obsolete | 25 EA | – | 10 / 31 | don't stock | – | 0% | −Rp 65.7M |
| 4100009075 SLEEVE,SHAFT,TYPE ZQ464,A182F11 | S | Reduce | Potentially obsolete | 8 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 64.7M |
| 4100078385 BURNER TIP,TYPE HR63,INCOLOY | C | Reduce | Potentially obsolete | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 62.0M |
| 4300001190 SPRING,SAFETY VALVE,DWG.358-7675,FOR KT- | S | Reduce | Potentially obsolete | 7 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 61.7M |
| 4300043156 SPRING,SAFETY VALVE,DWG.374-2513,FOR KT- | S | Reduce | Potentially obsolete | 7 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 61.7M |
| 4300037444 DEMISTER PAD,DWG.544-4072,FOR VD-1889 | S | Reduce | Potentially obsolete | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 61.7M |