Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,161 spare parts
Order value Rp 0 · excess value Rp 1.79T · page 9 of 24
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300043854 BEARING,JOURNAL,DWG.772-5054,FOR KT-778A | S | Reduce | Potentially obsolete | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 438.5M |
| 4300062171 BEARING,THRUST PAD,DWG.354-7551,FOR KT-8 | S | Reduce | Potentially obsolete | 2 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 438.5M |
| 4300062773 BEARING,THRUST PAD,DWG.127-6500,FOR KT-8 | S | Reduce | Potentially obsolete | 2 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 438.5M |
| 4300062923 BEARING,JOURNAL,DWG.619-2366,FOR KT-875 | S | Reduce | Potentially obsolete | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 438.5M |
| 4100039710 VALVE,NEEDLE,1/2IN ODT,3000PSI,SS316 | C | Reduce | Potentially obsolete | 165 EA | – | 3 / 7 | don't stock | – | 0% | −Rp 433.7M |
| 4300021368 IMPELLER,DWG.837-5723,FOR PP-148A | S | Reduce | Potentially obsolete | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 408.4M |
| 4300037477 SEAT RING,VALVE,DWG.609-5349,FOR PCV-922 | C | Reduce | Potentially obsolete | 36 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 406.1M |
| 4300037656 POSITIONER,VALVE,DWG.566-8750,FOR FCV-13 | C | Reduce | Potentially obsolete | 10 EA | – | 2 / 6 | don't stock | – | 0% | −Rp 399.2M |
| 4300009530 POSITIONER,VALVE,DWG.267-9369,FOR FCV-27 | C | Reduce | Potentially obsolete | 10 EA | – | 5 / 14 | don't stock | – | 0% | −Rp 399.2M |
| 4100010199 SLEEVE,SHAFT,MODEL UW475,SS304 | C | Reduce | Potentially obsolete | 50 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 396.3M |
| 4300075066 TRIM SET,CONTROL VALVE,DWG.515-9968,FOR | S | Reduce | Potentially obsolete | 5 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 392.5M |
| 4300020914 TRIM SET,CONTROL VALVE,DWG.366-5459,FOR | S | Reduce | Potentially obsolete | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 392.5M |
| 4300045230 TRIM SET,CONTROL VALVE,DWG.690-2114,FOR | C | Reduce | Potentially obsolete | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 392.5M |
| 4300074090 TRIM SET,CONTROL VALVE,DWG.282-4389,FOR | C | Reduce | Potentially obsolete | 5 SET | – | 4 / 10 | don't stock | – | 0% | −Rp 392.5M |
| 4300021072 TRIM SET,CONTROL VALVE,DWG.631-1638,FOR | C | Reduce | Potentially obsolete | 5 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 392.5M |
| 4300014131 TRIM SET,CONTROL VALVE,DWG.368-4203,FOR | C | Reduce | Potentially obsolete | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 392.5M |
| 4300045133 TRIM SET,CONTROL VALVE,DWG.381-7616,FOR | C | Reduce | Potentially obsolete | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 392.5M |
| 4300031512 TRIM SET,CONTROL VALVE,DWG.242-1067,FOR | C | Reduce | Potentially obsolete | 3 SET | 1 | 0 / 0 | don't stock | – | 0% | −Rp 391.4M |
| 4100088555 BLADE,ROTOR,SIZE LW323,CS | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4300011077 BLADE,ROTOR,DWG.930-3607,FOR KT-383A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4300011200 BLADE,ROTOR,DWG.196-1352,FOR KT-383A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4300033469 BLADE,ROTOR,DWG.349-8111,FOR KT-624A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4300033633 BLADE,ROTOR,DWG.965-2242,FOR KT-624A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4100089360 BLADE,ROTOR,TYPE JD317,PTFE | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4300043087 BLADE,ROTOR,DWG.585-7720,FOR KT-778A | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4100088326 BLADE,ROTOR,TYPE BC340,A182F11 | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4300062455 BLADE,ROTOR,DWG.577-8326,FOR KT-875 | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 381.5M |
| 4100085012 SEAL,LABYRINTH,MODEL VE45,GRAPHITE | S | Reduce | Potentially obsolete | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 378.4M |
| 4100085759 SEAL,LABYRINTH,SIZE YQ733,PTFE | S | Reduce | Potentially obsolete | 4 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 378.4M |
| 4300011292 SEAL,LABYRINTH,DWG.321-6202,FOR KT-383A | S | Reduce | Potentially obsolete | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 378.4M |
| 4300011884 SEAL,LABYRINTH,DWG.920-7029,FOR KT-383A | S | Reduce | Potentially obsolete | 4 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 378.4M |
| 4300029404 SEAL,LABYRINTH,DWG.138-1519,FOR KT-447 | S | Reduce | Potentially obsolete | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 378.4M |
| 4300032459 SEAL,LABYRINTH,DWG.433-3354,FOR KT-624A | S | Reduce | Potentially obsolete | 4 SET | – | 4 / 13 | don't stock | – | 0% | −Rp 378.4M |
| 4100085264 SEAL,LABYRINTH,TYPE DK850,VITON | S | Reduce | Potentially obsolete | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 378.4M |
| 4300062428 SEAL,LABYRINTH,DWG.877-9157,FOR KT-875 | S | Reduce | Potentially obsolete | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 378.4M |
| 4300011421 SPRING,SAFETY VALVE,DWG.951-7394,FOR KT- | S | Reduce | Potentially obsolete | 42 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 370.4M |
| 4300014505 COUPLING,DWG.521-3342,FOR KC-264A | S | Reduce | Potentially obsolete | 42 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 359.3M |
| 4300034158 POSITIONER,VALVE,DWG.793-3961,FOR FCV-15 | C | Reduce | Potentially obsolete | 9 EA | – | 4 / 11 | don't stock | – | 0% | −Rp 359.3M |
| 4300034841 POSITIONER,VALVE,DWG.657-6848,FOR FCV-61 | C | Reduce | Potentially obsolete | 9 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 359.3M |
| 4100051249 SEAT RING,VALVE,TYPE ZZ312,GRAPHITE | C | Reduce | Potentially obsolete | 31 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 349.7M |
| 4100065440 GAUGE,PRESSURE,0-100KG/CM2,6IN DIAL | C | Reduce | Potentially obsolete | 129 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 342.6M |
| 4300049188 COUPLING,DWG.729-9996,FOR PP-820A | S | Reduce | Potentially obsolete | 40 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 342.2M |
| 4100046460 PACKING SET,VALVE,SIZE PX846,SS316 | C | Reduce | Potentially obsolete | 89 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 341.9M |
| 4100056201 TRANSMITTER,PRESS,SIZE FW821,NBR | C | Reduce | Potentially obsolete | 10 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 341.4M |
| 4300060037 SEAT RING,VALVE,DWG.141-2547,FOR LCV-492 | C | Reduce | Potentially obsolete | 29 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 327.1M |
| 4300007078 SEAT RING,VALVE,DWG.123-7070,FOR PCV-138 | S | Reduce | Potentially obsolete | 29 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 327.1M |
| 4300033710 SPRING,SAFETY VALVE,DWG.386-3978,FOR KT- | S | Reduce | Potentially obsolete | 37 EA | – | 5 / 15 | don't stock | – | 0% | −Rp 326.3M |
| 4300073565 SEAT RING,VALVE,DWG.910-7407,FOR FCV-283 | C | Reduce | Potentially obsolete | 7 EA | 2 | 0 / 0 | don't stock | – | 0% | −Rp 324.9M |
| 4100050102 POSITIONER,VALVE,MODEL SF164,SS304 | C | Reduce | Potentially obsolete | 8 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 319.3M |
| 4300034869 TRIM SET,CONTROL VALVE,DWG.851-4673,FOR | C | Reduce | Potentially obsolete | 4 SET | – | 3 / 5 | don't stock | – | 0% | −Rp 314.0M |