Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,848 spare parts
Order value Rp 0 · excess value Rp 3.41T · page 22 of 37
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300049995Safety-criticalSign-off DISC,SAFETY VALVE,DWG.813-6281,FOR PRV-8 | S | Reduce | Non-moving | 7 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 75.2M |
| 4200010500 FAN,COOLING MOTOR,DWG.844-3292,FOR PP-83 | A | Reduce | Non-moving | 62 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 75.2M |
| 4200006566 FAN,COOLING MOTOR,TYPE KR888,MONEL | A | Reduce | Non-moving | 61 EA | – | 10 / 25 | 0 / 0 / 2 | – | 0% | −Rp 74.0M |
| 4300071720 RING,WEAR,DWG.784-2722,FOR PP-1460A | A | Reduce | Non-moving | 11 EA | – | 10 / 18 | 1 / 1 / 2 | – | 0% | −Rp 73.7M |
| 4300031290 RING,WEAR,DWG.896-3883,FOR PP-1597B | B | Reduce | Non-moving | 10 EA | – | 4 / 11 | 0 / 0 / 1 | – | 0% | −Rp 73.7M |
| 4300045916 RING,WEAR,DWG.346-5524,FOR PP-821 | B | Reduce | Non-moving | 10 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 73.7M |
| 4300058284 RING,WEAR,DWG.756-9831,FOR PP-900A | A | Reduce | Non-moving | 10 EA | – | 3 / 5 | 0 / 0 / 1 | – | 0% | −Rp 73.7M |
| 4100009614 SLEEVE,SHAFT,MODEL IL881,A105 | B | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 72.8M |
| 4100015641 GASKET,RING,3IN,600#,GRAPHITE | A | Reduce | Non-moving | 347 EA | – | 5 / 15 | 4 / 4 / 8 | – | 0% | −Rp 72.7M |
| 4100053922Safety-criticalSign-off SWITCH,LIMIT,SIZE WJ682,A182F11 | S | Reduce | Non-moving | 14 EA | – | 10 / 16 | 0 / 0 / 2 | – | 0% | −Rp 71.5M |
| 4100035415 VALVE,GATE,10IN,800#,CF8,SW | A | Reduce | Non-moving | 32 EA | – | 5 / 15 | 3 / 3 / 5 | – | 0% | −Rp 71.0M |
| 4300039543Long-lead SEAL,LABYRINTH,DWG.890-9137,FOR KT-419A | A | Reduce | Non-moving | 4 SET | 1 | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 70.7M |
| 4300066012Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.494-5868,FOR PRV | S | Reduce | Non-moving | 9 EA | – | 4 / 12 | 0 / 0 / 1 | – | 0% | −Rp 70.5M |
| 4300072867Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.101-3591,FOR PRV | S | Reduce | Non-moving | 9 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 70.5M |
| 4300041874Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.567-2892,FOR PRV | S | Reduce | Non-moving | 9 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 70.5M |
| 4100031899 TEE,10IN,SCH40,A105,SW | B | Reduce | Non-moving | 132 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 69.8M |
| 4300057584 COUPLING,DWG.634-4022,FOR KC-235D | A | Reduce | Non-moving | 9 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 68.4M |
| 4300049419 COUPLING,DWG.129-3447,FOR KC-867D | A | Reduce | Non-moving | 10 SET | – | 2 / 5 | 1 / 1 / 2 | – | 0% | −Rp 68.4M |
| 4300048500 COUPLING,DWG.659-7769,FOR PP-319B | B | Reduce | Non-moving | 9 SET | – | 4 / 11 | 0 / 0 / 1 | – | 0% | −Rp 68.4M |
| 4300044885 COUPLING,DWG.896-7776,FOR PP-583B | A | Reduce | Non-moving | 9 SET | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 68.4M |
| 4100057307 TRANSMITTER,DIFF.PRESS,0~10000MMH2O,HART | A | Reduce | Non-moving | 3 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100056292 TRANSMITTER,PRESS,SIZE KQ19,NBR | A | Reduce | Non-moving | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 68.3M |
| 4100058485 TRANSMITTER,DIFF.PRESS,0~500MMH2O,FF | B | Reduce | Non-moving | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 68.3M |
| 4200006398 FAN,COOLING MOTOR,SIZE YS876,MONEL | A | Reduce | Non-moving | 56 EA | – | 10 / 23 | 0 / 0 / 2 | – | 0% | −Rp 67.7M |
| 4300039326 SEAT RING,VALVE,DWG.633-8098,FOR PCV-204 | B | Reduce | Non-moving | 6 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 67.7M |
| 4300065842 SEAT RING,VALVE,DWG.320-7319,FOR PCV-449 | B | Reduce | Non-moving | 6 EA | – | 4 / 6 | don't stock | – | 0% | −Rp 67.7M |
| 4300019440 THERMOWELL,DWG.584-7487,FOR TEL-736-41B | A | Reduce | Non-moving | 11 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 66.6M |
| 4100047708 DIAPHRAGM,ACTUATOR,MODEL DC614,INCOLOY | B | Reduce | Non-moving | 16 EA | – | 5 / 9 | 0 / 0 / 1 | – | 0% | −Rp 65.8M |
| 4100054716Safety-criticalSign-off SWITCH,LIMIT,TYPE NJ633,VITON | A | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 65.6M |
| 4100054313Safety-criticalSign-off SWITCH,LIMIT,MODEL VR294,SS304 | S | Reduce | Non-moving | 13 EA | – | 2 / 6 | 0 / 0 / 2 | – | 0% | −Rp 65.6M |
| 4100055207Safety-criticalSign-off SWITCH,LIMIT,TYPE TC654,GRAPHITE | A | Reduce | Non-moving | 13 EA | – | 5 / 9 | 0 / 0 / 2 | – | 0% | −Rp 65.6M |
| 4300036713 RING,WEAR,DWG.800-8356,FOR PP-1407B | S | Reduce | Non-moving | 8 EA | – | 3 / 9 | don't stock | – | 0% | −Rp 65.5M |
| 4300046671 RING,WEAR,DWG.443-1629,FOR PP-292 | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 65.5M |
| 4100012533 RING,WEAR,TYPE QA574,PTFE | A | Reduce | Non-moving | 9 EA | – | 3 / 5 | 0 / 0 / 1 | – | 0% | −Rp 65.5M |
| 4100009031 SLEEVE,SHAFT,SIZE ZH349,NBR | A | Reduce | Non-moving | 9 EA | – | 5 / 12 | 0 / 0 / 1 | – | 0% | −Rp 64.7M |
| 4300049086 SLEEVE,SHAFT,DWG.287-7964,FOR PP-246C | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 64.7M |
| 4300045693 SLEEVE,SHAFT,DWG.120-6398,FOR PP-679C | A | Reduce | Non-moving | 9 EA | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 64.7M |
| 4100008961 SLEEVE,SHAFT,SIZE MS315,A182F11 | A | Reduce | Non-moving | 10 EA | – | 3 / 7 | 1 / 1 / 2 | – | 0% | −Rp 64.7M |
| 4300060888Safety-criticalSign-off DISC,SAFETY VALVE,DWG.188-7917,FOR PRV-1 | A | Reduce | Non-moving | 6 EA | – | 4 / 8 | 0 / 0 / 1 | – | 0% | −Rp 62.7M |
| 4300065162Safety-criticalSign-off DISC,SAFETY VALVE,DWG.248-7149,FOR PRV-1 | A | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 62.7M |
| 4300055093Safety-criticalSign-off DISC,SAFETY VALVE,DWG.551-5960,FOR PRV-6 | S | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 62.7M |
| 4100097492 DEMISTER PAD,TYPE SI739,CS | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 61.7M |
| 4300072290 DEMISTER PAD,DWG.305-2316,FOR VD-1291 | B | Reduce | Non-moving | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 61.7M |
| 4300074093 DEMISTER PAD,DWG.706-7405,FOR VD-782A | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 61.7M |
| 4300027053 DEMISTER PAD,DWG.474-7189,FOR VD-958 | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 61.7M |
| 4100070612Safety-criticalSign-off NOZZLE,SAFETY VALVE,SIZE NA405,PTFE | C | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300041634Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.834-7495,FOR PRV | A | Reduce | Non-moving | 4 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300061620Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.418-3366,FOR PRV | A | Reduce | Non-moving | 4 EA | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4100071235Safety-criticalSign-off NOZZLE,SAFETY VALVE,MODEL OF25,SS304 | C | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |
| 4300018631Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.582-4694,FOR PRV | S | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 60.8M |