Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,848 spare parts
Order value Rp 0 · excess value Rp 3.41T · page 32 of 37
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300068516 COUPLING,DWG.470-8531,FOR PP-588 | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 8.6M |
| 4300055538 COUPLING,DWG.936-9155,FOR PP-614 | A | Reduce | Non-moving | 2 SET | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 8.6M |
| 4100001325 BEARING,BALL,1ROW,DEEP GROOVE,6311BDB | A | Reduce | Non-moving | 8 EA | – | 3 / 9 | 0 / 0 / 2 | – | 0% | −Rp 8.5M |
| 4100003236 BEARING,ROLLER,CYL,1ROW,NU314 | A | Reduce | Non-moving | 8 EA | – | 4 / 10 | 0 / 0 / 2 | – | 0% | −Rp 8.5M |
| 4100027518 STUDBOLT,7/8INX85MM,B8M/8M | B | Reduce | Non-moving | 253 EA | – | 2 / 6 | 0 / 0 / 27 | – | 0% | −Rp 8.5M |
| 4200004768 LAMP,LED,36W,220VAC,E27 | A | Reduce | Non-moving | 23 EA | – | 5 / 11 | 0 / 0 / 2 | – | 0% | −Rp 8.5M |
| 4100086490 FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-7 | S | Reduce | Non-moving | 3 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 8.3M |
| 4300028192 RING,WEAR,DWG.389-5111,FOR PP-1426A | B | Reduce | Non-moving | 2 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4300041600 RING,WEAR,DWG.621-2931,FOR PP-1751A | B | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4300067245 RING,WEAR,DWG.701-7374,FOR PP-592 | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4300053603 RING,WEAR,DWG.430-2269,FOR PP-795D | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4300053635 RING,WEAR,DWG.278-2482,FOR PP-795D | A | Reduce | Non-moving | 2 EA | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4100012446 RING,WEAR,TYPE LV543,PTFE | B | Reduce | Non-moving | 2 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4300036367 RING,WEAR,DWG.927-9909,FOR PP-812A | B | Reduce | Non-moving | 2 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4300018436 RING,WEAR,DWG.116-9950,FOR PP-902B | A | Reduce | Non-moving | 3 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 8.2M |
| 4300060077 SLEEVE,SHAFT,DWG.334-7162,FOR PP-1033 | A | Reduce | Non-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 8.1M |
| 4100009328 SLEEVE,SHAFT,MODEL MH452,PTFE | A | Reduce | Non-moving | 2 EA | – | 4 / 9 | 0 / 0 / 1 | – | 0% | −Rp 8.1M |
| 4300018548 SLEEVE,SHAFT,DWG.190-1071,FOR PP-1471A | A | Reduce | Non-moving | 3 EA | – | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 8.1M |
| 4100008881 SLEEVE,SHAFT,MODEL JL899,GRAPHITE | A | Reduce | Non-moving | 3 EA | – | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 8.1M |
| 4300024004 SLEEVE,SHAFT,DWG.947-6920,FOR PP-1540 | B | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 8.1M |
| 4300058565 SLEEVE,SHAFT,DWG.835-3798,FOR PP-281 | A | Reduce | Non-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 8.1M |
| 4300030612 SLEEVE,SHAFT,DWG.942-6534,FOR PP-291D | B | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 8.1M |
| 4100022098 O-RING,VITON,153MM ID,3.5MM CS | B | Reduce | Non-moving | 207 EA | – | 3 / 6 | 3 / 3 / 6 | – | 0% | −Rp 8.0M |
| 4100036593 VALVE,GLOBE,3/4IN,800#,A105,SW | B | Reduce | Non-moving | 3 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 7.9M |
| 4100035022 VALVE,GATE,3IN,800#,A105,RF | A | Reduce | Non-moving | 5 EA | – | 3 / 8 | 0 / 0 / 2 | – | 0% | −Rp 7.9M |
| 4200005622 LAMP,LED,12W,220VAC,E27 | B | Reduce | Non-moving | 21 EA | – | 4 / 9 | 0 / 0 / 2 | – | 0% | −Rp 7.7M |
| 4100093880 TUBE PLUG,EXCHANGER,MODEL HO358,GRAPHITE | A | Reduce | Non-moving | 16 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 7.6M |
| 4200002656 GLAND,CABLE,MODEL TG716,SS304 | A | Reduce | Non-moving | 43 EA | – | 10 / 21 | 0 / 0 / 2 | – | 0% | −Rp 7.5M |
| 4200011436 FAN,COOLING MOTOR,DWG.294-5800,FOR PP-52 | A | Reduce | Non-moving | 8 EA | – | 4 / 10 | 0 / 0 / 2 | – | 0% | −Rp 7.5M |
| 4100033445 FLANGE,SO,1IN,150#,SS316,RF | A | Reduce | Non-moving | 8 EA | – | 5 / 8 | don't stock | – | 0% | −Rp 7.4M |
| 4100100363 BOLT,ANCHOR,SIZE NM464,CS | A | Reduce | Non-moving | 365 EA | – | 5 / 9 | 3 / 3 / 5 | – | 0% | −Rp 7.2M |
| 4100003244 BEARING,BALL,ANGULAR,NU316BDB | A | Reduce | Non-moving | 7 EA | – | 3 / 9 | 0 / 0 / 2 | – | 0% | −Rp 7.1M |
| 4100004646 BEARING,BALL,ANGULAR,NU318 C3 | S | Reduce | Non-moving | 5 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 7.1M |
| 4100004757 BEARING,BALL,ANGULAR,7209 C3 | A | Reduce | Non-moving | 7 EA | – | 2 / 4 | 0 / 0 / 2 | – | 0% | −Rp 7.1M |
| 4100002657 BEARING,BALL,ANGULAR,6313 C3 | A | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 7.1M |
| 4100002177 BEARING,BALL,ANGULAR,6309 | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 2 / 2 / 4 | – | 0% | −Rp 7.1M |
| 4100001882 BEARING,BALL,1ROW,DEEP GROOVE,NU310 C3 | B | Reduce | Non-moving | 7 EA | – | 5 / 9 | 0 / 0 / 2 | – | 0% | −Rp 7.1M |
| 4100021343 O-RING,NBR,121MM ID,3.5MM CS | A | Reduce | Non-moving | 184 EA | – | 4 / 7 | 3 / 3 / 6 | – | 0% | −Rp 7.1M |
| 4100029599 PIPE,3/4IN,STD,SS316,SMLS,6M LG | B | Reduce | Non-moving | 4 LG | – | 1 / 2 | don't stock | – | 0% | −Rp 6.8M |
| 4100029268 PIPE,1/4IN,STD,SS316,SMLS,6M LG | A | Reduce | Non-moving | 7 LG | – | 4 / 12 | 0 / 0 / 3 | – | 0% | −Rp 6.8M |
| 4100094102 TUBE PLUG,EXCHANGER,MODEL HA476,CS | B | Reduce | Non-moving | 15 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 6.6M |
| 4100062097 THERMOCOUPLE,J-2ELMNT,3.2X3000LG | A | Reduce | Non-moving | 3 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 6.4M |
| 4100061248 THERMOCOUPLE,K-2ELMNT,6.4X1200LG | A | Reduce | Non-moving | 3 EA | – | 2 / 3 | 1 / 1 / 2 | – | 0% | −Rp 6.4M |
| 4200010114 FAN,COOLING MOTOR,DWG.863-1180,FOR PP-12 | A | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 6.3M |
| 4200010838 FAN,COOLING MOTOR,DWG.859-4444,FOR PP-28 | A | Reduce | Non-moving | 7 EA | – | 3 / 8 | 0 / 0 / 2 | – | 0% | −Rp 6.3M |
| 4100015852 GASKET,RING,3IN,300#,PTFE | A | Reduce | Non-moving | 24 EA | – | 0 / 0 | 7 / 7 / 13 | – | 0% | −Rp 6.2M |
| 4100026927 STUDBOLT,1/2INX80MM,B8M/8M | A | Reduce | Non-moving | 188 EA | – | 3 / 7 | 0 / 0 / 27 | – | 0% | −Rp 6.1M |
| 4100035751Long-lead VALVE,GATE,2IN,800#,A105,SW | A | Reduce | Non-moving | 18 EA | – | 10 / 28 | 3 / 3 / 5 | – | 0% | −Rp 6.1M |
| 4300050107 THERMOWELL,DWG.165-2139,FOR TEL-1349A | A | Reduce | Non-moving | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 6.1M |
| 4300052633 THERMOWELL,DWG.782-7168,FOR TEL-1793 | A | Reduce | Non-moving | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 6.1M |