Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,848 spare parts
Order value Rp 0 · excess value Rp 3.41T · page 8 of 37
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300003405Sign-off BEARING,JOURNAL,DWG.373-1933,FOR KT-397A | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300039903Sign-off BEARING,THRUST PAD,DWG.250-3651,FOR KT-4 | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300069408Sign-off BEARING,THRUST PAD,DWG.518-2403,FOR KT-5 | A | Reduce | Non-moving | 6 SET | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300046956Sign-off COUPLING,DWG.281-5520,FOR PP-1013A | A | Reduce | Non-moving | 129 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300066663Sign-off SEAT RING,VALVE,DWG.314-6010,FOR FCV-485 | A | Reduce | Non-moving | 98 EA | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4100043901Sign-off TRIM SET,CONTROL VALVE,TYPE RX305,NBR | A | Reduce | Non-moving | 13 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.0B |
| 4300054172Sign-off TRIM SET,CONTROL VALVE,DWG.115-5498,FOR | A | Reduce | Non-moving | 13 SET | – | 3 / 7 | don't stock | – | 0% | −Rp 1.0B |
| 4300072222Sign-off TRIM SET,CONTROL VALVE,DWG.387-8235,FOR | A | Reduce | Non-moving | 13 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.0B |
| 4300068241Sign-off TRIM SET,CONTROL VALVE,DWG.835-3348,FOR | A | Reduce | Non-moving | 13 SET | – | 10 / 15 | don't stock | – | 0% | −Rp 1.0B |
| 4300003650Long-leadSign-off BEARING,JOURNAL,DWG.556-7368,FOR KT-397A | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.0B |
| 4100062361Long-leadSign-off THERMOCOUPLE,K-2ELMNT,6.4X2700LG | A | Reduce | Non-moving | 159 EA | 1 | 10 / 16 | 1 / 1 / 2 | – | 0% | −Rp 1.0B |
| 4300048943Long-leadSign-off TRIM SET,CONTROL VALVE,DWG.925-8708,FOR | B | Reduce | Non-moving | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.0B |
| 4300052155 SEAT RING,VALVE,DWG.451-5756,FOR PCV-273 | B | Reduce | Non-moving | 86 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 970.1M |
| 4100090476 VALVE,GOVERNOR,MODEL XL485,SS304 | A | Reduce | Non-moving | 4 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 953.1M |
| 4300012916 VALVE,GOVERNOR,DWG.740-1641,FOR KT-308B | A | Reduce | Non-moving | 4 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 953.1M |
| 4100091070 VALVE,GOVERNOR,MODEL CV21,A105 | A | Reduce | Non-moving | 4 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 953.1M |
| 4300005145 VALVE,GOVERNOR,DWG.656-2703,FOR KT-460B | A | Reduce | Non-moving | 5 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 953.1M |
| 4300007876 BEARING,THRUST PAD,DWG.885-5161,FOR KC-5 | A | Reduce | Non-moving | 10 SET | 1 | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 953.1M |
| 4300003002 SEAL,LABYRINTH,DWG.605-1791,FOR KC-930C | A | Reduce | Non-moving | 11 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 945.9M |
| 4100085901 SEAL,LABYRINTH,MODEL LG463,GRAPHITE | A | Reduce | Non-moving | 11 SET | – | 10 / 15 | 0 / 0 / 1 | – | 0% | −Rp 945.9M |
| 4300039882 SEAL,LABYRINTH,DWG.609-1661,FOR KT-419A | A | Reduce | Non-moving | 11 SET | – | 10 / 21 | 0 / 0 / 1 | – | 0% | −Rp 945.9M |
| 4100006599 SEAL,MECHANICAL,SIZE WL661,CS | B | Reduce | Non-moving | 10 SET | – | 10 / 15 | don't stock | – | 0% | −Rp 945.9M |
| 4300045871 TRIM SET,CONTROL VALVE,DWG.769-2823,FOR | A | Reduce | Non-moving | 12 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 941.9M |
| 4300027027 TRIM SET,CONTROL VALVE,DWG.345-8880,FOR | A | Reduce | Non-moving | 12 SET | – | 10 / 14 | don't stock | – | 0% | −Rp 941.9M |
| 4300028900 IMPELLER,DWG.700-9780,FOR PP-1651 | A | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 918.9M |
| 4100054374Safety-criticalSign-off SWITCH,LIMIT,SIZE NB499,PTFE | S | Reduce | Non-moving | 155 EA | – | 4 / 9 | 0 / 0 / 2 | – | 0% | −Rp 912.1M |
| 4300014373 BEARING,THRUST PAD,DWG.182-5089,FOR KC-1 | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 877.0M |
| 4300014394 BEARING,JOURNAL,DWG.828-3925,FOR KC-106B | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 877.0M |
| 4300036983 BEARING,JOURNAL,DWG.778-1283,FOR KC-137A | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4100080712 BEARING,JOURNAL,TYPE SB139,SS304 | A | Reduce | Non-moving | 6 SET | – | 3 / 8 | 1 / 1 / 2 | – | 0% | −Rp 877.0M |
| 4100081790 BEARING,JOURNAL,MODEL WF245,PTFE | A | Reduce | Non-moving | 5 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300025986 BEARING,JOURNAL,DWG.109-2610,FOR KC-247A | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300014929 BEARING,JOURNAL,DWG.572-1542,FOR KC-284A | B | Reduce | Non-moving | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 877.0M |
| 4300014954 BEARING,JOURNAL,DWG.588-3644,FOR KC-284A | B | Reduce | Non-moving | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 877.0M |
| 4300015007 BEARING,THRUST PAD,DWG.994-5435,FOR KC-2 | B | Reduce | Non-moving | 4 SET | – | 3 / 6 | don't stock | – | 0% | −Rp 877.0M |
| 4300056703 BEARING,JOURNAL,DWG.549-6194,FOR KC-464A | A | Reduce | Non-moving | 5 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300007787 BEARING,JOURNAL,DWG.248-8025,FOR KC-527 | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 877.0M |
| 4300056339 BEARING,THRUST PAD,DWG.870-8489,FOR KC-5 | A | Reduce | Non-moving | 4 SET | – | 3 / 8 | don't stock | – | 0% | −Rp 877.0M |
| 4300013501 BEARING,THRUST PAD,DWG.137-7673,FOR KT-3 | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300013556 BEARING,THRUST PAD,DWG.807-8425,FOR KT-3 | A | Reduce | Non-moving | 5 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300039888 BEARING,JOURNAL,DWG.835-2064,FOR KT-419A | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300040422 BEARING,JOURNAL,DWG.375-2183,FOR KT-419A | A | Reduce | Non-moving | 5 SET | – | 4 / 8 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300005311 BEARING,JOURNAL,DWG.183-1248,FOR KT-460B | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300005522 BEARING,JOURNAL,DWG.435-1543,FOR KT-460B | A | Reduce | Non-moving | 5 SET | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300006274 BEARING,JOURNAL,DWG.926-4948,FOR KT-460B | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300022151 BEARING,JOURNAL,DWG.811-5164,FOR KT-856A | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4100036199 VALVE,GATE,1/4IN,300#,CF8,SW | A | Reduce | Non-moving | 337 EA | – | 4 / 8 | 2 / 2 / 4 | – | 0% | −Rp 875.3M |
| 4300045117 TRIM SET,CONTROL VALVE,DWG.337-2836,FOR | B | Reduce | Non-moving | 12 SET | – | 3 / 5 | 0 / 0 / 1 | – | 0% | −Rp 863.4M |
| 4300048710 SEAL,LABYRINTH,DWG.574-2875,FOR KC-178A | A | Reduce | Non-moving | 10 SET | – | 4 / 6 | 0 / 0 / 1 | – | 0% | −Rp 851.3M |
| 4100085309 SEAL,LABYRINTH,MODEL CU28,INCOLOY | A | Reduce | Non-moving | 10 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 851.3M |