Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 38 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300012069 VALVE,GOVERNOR,DWG.146-9640,FOR KT-383A | S | Reduce | Potentially obsolete | 4 ASS | – | 2 / 4 | don't stock | – | 0% | −Rp 953.1M |
| 4300012252 VALVE,GOVERNOR,DWG.772-6654,FOR KT-383A | S | Reduce | Potentially obsolete | 4 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 953.1M |
| 4300029926 VALVE,GOVERNOR,DWG.225-5038,FOR KT-447 | S | Reduce | Potentially obsolete | 4 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 953.1M |
| 4300030018 VALVE,GOVERNOR,DWG.204-6070,FOR KT-447 | S | Reduce | Potentially obsolete | 4 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 953.1M |
| 4300005145 VALVE,GOVERNOR,DWG.656-2703,FOR KT-460B | A | Reduce | Non-moving | 5 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 953.1M |
| 4300033032 VALVE,GOVERNOR,DWG.395-9908,FOR KT-624A | S | Reduce | Potentially obsolete | 4 ASS | – | 2 / 6 | don't stock | – | 0% | −Rp 953.1M |
| 4300033091 VALVE,GOVERNOR,DWG.395-2695,FOR KT-624A | S | Reduce | Potentially obsolete | 4 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 953.1M |
| 4300033329 VALVE,GOVERNOR,DWG.734-8826,FOR KT-624A | S | Reduce | Potentially obsolete | 4 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 953.1M |
| 4300043978 VALVE,GOVERNOR,DWG.550-2790,FOR KT-778A | S | Reduce | Potentially obsolete | 4 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 953.1M |
| 4300007876 BEARING,THRUST PAD,DWG.885-5161,FOR KC-5 | A | Reduce | Non-moving | 10 SET | 1 | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 953.1M |
| 4300058891 SEAL,LABYRINTH,DWG.698-7509,FOR KC-145 | S | Reduce | Potentially obsolete | 10 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 945.9M |
| 4300003002 SEAL,LABYRINTH,DWG.605-1791,FOR KC-930C | A | Reduce | Non-moving | 11 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 945.9M |
| 4100085901 SEAL,LABYRINTH,MODEL LG463,GRAPHITE | A | Reduce | Non-moving | 11 SET | – | 10 / 15 | 0 / 0 / 1 | – | 0% | −Rp 945.9M |
| 4300039882 SEAL,LABYRINTH,DWG.609-1661,FOR KT-419A | A | Reduce | Non-moving | 11 SET | – | 10 / 21 | 0 / 0 / 1 | – | 0% | −Rp 945.9M |
| 4300032473 SEAL,LABYRINTH,DWG.961-8940,FOR KT-624A | S | Reduce | Potentially obsolete | 10 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 945.9M |
| 4100006599 SEAL,MECHANICAL,SIZE WL661,CS | B | Reduce | Non-moving | 10 SET | – | 10 / 15 | don't stock | – | 0% | −Rp 945.9M |
| 4300045871 TRIM SET,CONTROL VALVE,DWG.769-2823,FOR | A | Reduce | Non-moving | 12 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 941.9M |
| 4100043939 TRIM SET,CONTROL VALVE,MODEL NU204,CS | C | Reduce | Potentially obsolete | 12 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 941.9M |
| 4300027027 TRIM SET,CONTROL VALVE,DWG.345-8880,FOR | A | Reduce | Non-moving | 12 SET | – | 10 / 14 | don't stock | – | 0% | −Rp 941.9M |
| 4100064505 GAUGE,PRESSURE,0-40KG/CM2,6IN DIAL | C | Reduce | Potentially obsolete | 347 EA | – | 5 / 9 | don't stock | – | 0% | −Rp 921.5M |
| 4300028900 IMPELLER,DWG.700-9780,FOR PP-1651 | A | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 918.9M |
| 4300043176 BLADE,ROTOR,DWG.739-7248,FOR KT-778A | S | Reduce | Potentially obsolete | 2 SET | 2 | 2 / 5 | don't stock | – | 0% | −Rp 915.5M |
| 4100054374Safety-criticalSign-off SWITCH,LIMIT,SIZE NB499,PTFE | S | Reduce | Non-moving | 155 EA | – | 4 / 9 | 0 / 0 / 2 | – | 0% | −Rp 912.1M |
| 4300046133 COUPLING,DWG.929-8057,FOR PP-1869 | C | Reduce | Potentially obsolete | 106 SET | – | 5 / 14 | don't stock | – | 0% | −Rp 906.8M |
| 4300034084Safety-critical DISC,SAFETY VALVE,DWG.889-1837,FOR PRV-9 | S | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 12.5M |
| 4100058397 TRANSMITTER,DIFF.PRESS,0~2500MMH2O,HART | C | Reduce | Potentially obsolete | 26 EA | – | 4 / 12 | don't stock | – | 0% | −Rp 819.4M |
| 4300014373 BEARING,THRUST PAD,DWG.182-5089,FOR KC-1 | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 877.0M |
| 4300014394 BEARING,JOURNAL,DWG.828-3925,FOR KC-106B | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 877.0M |
| 4300036983 BEARING,JOURNAL,DWG.778-1283,FOR KC-137A | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4100080712 BEARING,JOURNAL,TYPE SB139,SS304 | A | Reduce | Non-moving | 6 SET | – | 3 / 8 | 1 / 1 / 2 | – | 0% | −Rp 877.0M |
| 4100081790 BEARING,JOURNAL,MODEL WF245,PTFE | A | Reduce | Non-moving | 5 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300025986 BEARING,JOURNAL,DWG.109-2610,FOR KC-247A | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300014929 BEARING,JOURNAL,DWG.572-1542,FOR KC-284A | B | Reduce | Non-moving | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 877.0M |
| 4300014954 BEARING,JOURNAL,DWG.588-3644,FOR KC-284A | B | Reduce | Non-moving | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 877.0M |
| 4300015007 BEARING,THRUST PAD,DWG.994-5435,FOR KC-2 | B | Reduce | Non-moving | 4 SET | – | 3 / 6 | don't stock | – | 0% | −Rp 877.0M |
| 4300025305 BEARING,JOURNAL,DWG.238-3679,FOR KC-373B | S | Reduce | Potentially obsolete | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 877.0M |
| 4300056703 BEARING,JOURNAL,DWG.549-6194,FOR KC-464A | A | Reduce | Non-moving | 5 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300007787 BEARING,JOURNAL,DWG.248-8025,FOR KC-527 | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 877.0M |
| 4100080957 BEARING,JOURNAL,SIZE NA215,A182F11 | S | Reduce | Potentially obsolete | 4 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 877.0M |
| 4300056339 BEARING,THRUST PAD,DWG.870-8489,FOR KC-5 | A | Reduce | Non-moving | 4 SET | – | 3 / 8 | don't stock | – | 0% | −Rp 877.0M |
| 4100082407 BEARING,JOURNAL,TYPE NE53,A182F11 | S | Reduce | Potentially obsolete | 4 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 877.0M |
| 4300059490 BEARING,THRUST PAD,DWG.943-8494,FOR KC-9 | S | Reduce | Potentially obsolete | 4 SET | – | 2 / 5 | don't stock | – | 0% | −Rp 877.0M |
| 4300000708 BEARING,THRUST PAD,DWG.860-3418,FOR KT-2 | S | Reduce | Potentially obsolete | 4 SET | – | 3 / 5 | don't stock | – | 0% | −Rp 877.0M |
| 4300013501 BEARING,THRUST PAD,DWG.137-7673,FOR KT-3 | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300013556 BEARING,THRUST PAD,DWG.807-8425,FOR KT-3 | A | Reduce | Non-moving | 5 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4100081400 BEARING,JOURNAL,MODEL LW420,CS | S | Reduce | Potentially obsolete | 4 SET | – | 2 / 5 | don't stock | – | 0% | −Rp 877.0M |
| 4300039888 BEARING,JOURNAL,DWG.835-2064,FOR KT-419A | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300040422 BEARING,JOURNAL,DWG.375-2183,FOR KT-419A | A | Reduce | Non-moving | 5 SET | – | 4 / 8 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |
| 4300029746 BEARING,THRUST PAD,DWG.446-6869,FOR KT-4 | S | Reduce | Potentially obsolete | 4 SET | – | 2 / 5 | don't stock | – | 0% | −Rp 877.0M |
| 4300005311 BEARING,JOURNAL,DWG.183-1248,FOR KT-460B | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 877.0M |