Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 67 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100004879 BEARING,BALL,ANGULAR,NU306 C3 | B | Reduce | Slow-moving | 58 EA | – | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 79.8M |
| 4100074041 CASTABLE,REFRACTORY,LW,1600DEG C | A | Reduce | Non-moving | 2,001 KG | – | 0 / 0 | 86 / 91 / 182 | – | 0% | −Rp 79.7M |
| 4300018324 SPRING,SAFETY VALVE,DWG.351-2352,FOR KT- | S | Reduce | Potentially obsolete | 9 EA | – | 4 / 10 | don't stock | – | 0% | −Rp 79.4M |
| 4100067168 SPRING,SAFETY VALVE,TYPE XJ779,GRAPHITE | A | Reduce | Non-moving | 11 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 79.4M |
| 4300069797 SPRING,SAFETY VALVE,DWG.206-8832,FOR KT- | A | Reduce | Non-moving | 11 EA | – | 10 / 20 | 1 / 1 / 2 | – | 0% | −Rp 79.4M |
| 4300016714Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.362-9797,FOR PRV | S | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 79.4M |
| 4300009885Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.855-1966,FOR PRV | S | Reduce | Non-moving | 10 EA | – | 4 / 8 | 0 / 0 / 1 | – | 0% | −Rp 79.4M |
| 4300009006Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.516-3751,FOR PRV | S | Reduce | Non-moving | 10 EA | – | 10 / 17 | 0 / 0 / 1 | – | 0% | −Rp 79.4M |
| 4300027669Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.475-4883,FOR PRV | S | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 79.4M |
| 4100053205Safety-criticalSign-off SOLENOID VALVE,TYPE SY883,SS304 | S | Reduce | Non-moving | 8 EA | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 79.0M |
| 4100051233 SEAT RING,VALVE,MODEL DI286,MONEL | A | Reduce | Slow-moving | 9 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 79.0M |
| 4300046876 SEAT RING,VALVE,DWG.313-7188,FOR PCV-106 | C | Reduce | Potentially obsolete | 7 EA | – | 4 / 8 | don't stock | – | 0% | −Rp 79.0M |
| 4300072357 SEAT RING,VALVE,DWG.246-5879,FOR PCV-162 | A | Reduce | Non-moving | 8 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 79.0M |
| 4300021818 SEAT RING,VALVE,DWG.342-9987,FOR TCV-191 | C | Reduce | Potentially obsolete | 7 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 79.0M |
| 4100051738 SEAT RING,VALVE,TYPE FG738,SS304 | S | Reduce | Potentially obsolete | 7 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 79.0M |
| 4300057891 THERMOWELL,DWG.327-9955,FOR TEL-1683 | C | Reduce | Potentially obsolete | 13 EA | – | 3 / 6 | don't stock | – | 0% | −Rp 78.7M |
| 4300008771 TRIM SET,CONTROL VALVE,DWG.921-3159,FOR | S | Reduce | Slow-moving | 1 SET | – | 1 / 2 | don't stock | – | 1% | −Rp 78.5M |
| 4300002641 TRIM SET,CONTROL VALVE,DWG.135-2146,FOR | B | Reduce | Non-moving | 1 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 78.5M |
| 4100043636 TRIM SET,CONTROL VALVE,TYPE HG845,MONEL | A | Reduce | Non-moving | 2 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 78.5M |
| 4300061308 TRIM SET,CONTROL VALVE,DWG.633-8855,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300020431 TRIM SET,CONTROL VALVE,DWG.401-7189,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300075103 TRIM SET,CONTROL VALVE,DWG.250-7414,FOR | S | Reduce | Excess | 1 SET | – | 0 / 0 | don't stock | – | 1% | −Rp 78.5M |
| 4300036851 TRIM SET,CONTROL VALVE,DWG.247-1691,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4100043717 TRIM SET,CONTROL VALVE,TYPE EJ929,VITON | C | Reduce | Slow-moving | 2 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 78.5M |
| 4300020813 TRIM SET,CONTROL VALVE,DWG.749-4805,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300055344 TRIM SET,CONTROL VALVE,DWG.299-3959,FOR | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 78.5M |
| 4300059170 TRIM SET,CONTROL VALVE,DWG.765-9298,FOR | A | Reduce | Non-moving | 1 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 78.5M |
| 4300074974 TRIM SET,CONTROL VALVE,DWG.433-1780,FOR | A | Reduce | Non-moving | 1 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 78.5M |
| 4300028459 TRIM SET,CONTROL VALVE,DWG.849-5829,FOR | A | Reduce | Slow-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300008308 TRIM SET,CONTROL VALVE,DWG.299-9152,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 78.5M |
| 4300046460 TRIM SET,CONTROL VALVE,DWG.326-1874,FOR | A | Reduce | Excess | 3 SET | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 78.5M |
| 4300068044 TRIM SET,CONTROL VALVE,DWG.612-3739,FOR | A | Reduce | Non-moving | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300015225 TRIM SET,CONTROL VALVE,DWG.762-1867,FOR | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 78.5M |
| 4300021100 TRIM SET,CONTROL VALVE,DWG.270-6751,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300019520 TRIM SET,CONTROL VALVE,DWG.674-3761,FOR | A | Reduce | Non-moving | 1 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 78.5M |
| 4100045002 TRIM SET,CONTROL VALVE,TYPE PM255,SS316 | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300068687 TRIM SET,CONTROL VALVE,DWG.172-8318,FOR | B | Reduce | Non-moving | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300066933 TRIM SET,CONTROL VALVE,DWG.692-2863,FOR | A | Reduce | Non-moving | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300050878 TRIM SET,CONTROL VALVE,DWG.898-8607,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300050955 TRIM SET,CONTROL VALVE,DWG.358-3105,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300067775 TRIM SET,CONTROL VALVE,DWG.181-9408,FOR | S | Reduce | Slow-moving | 1 SET | – | 0 / 0 | don't stock | – | 25% | −Rp 78.5M |
| 4300019323 TRIM SET,CONTROL VALVE,DWG.376-9216,FOR | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4100044890 TRIM SET,CONTROL VALVE,MODEL EF699,INCOL | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300007593 TRIM SET,CONTROL VALVE,DWG.464-5810,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300054135 TRIM SET,CONTROL VALVE,DWG.893-8775,FOR | S | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4300016129 TRIM SET,CONTROL VALVE,DWG.976-7877,FOR | C | Reduce | Potentially obsolete | 1 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 78.5M |
| 4100098724 SCREW,TAPPING,M4X16MM,SS304 | A | Monitor | Critical insurance spare | 2 EA | – | 1 / 2 | 225 / 234 / 409 | – | 8% | – |
| 4300074182 RING,WEAR,DWG.209-9978,FOR PP-1729A | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 8% | – |
| 4100040285 CONNECTOR,MALE,1/4IN ODT,1/2IN NPT,SS316 | C | Reduce | Potentially obsolete | 633 EA | – | 10 / 17 | don't stock | – | 0% | −Rp 77.8M |
| 4100081416Long-lead BEARING,JOURNAL,SIZE RV867,MONEL | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 8% | – |