Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 68 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100064430 GAUGE,PRESSURE,0-40KG/CM2,6IN DIAL | A | TransferNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | transfer 1 from 4100065283 | 0% | – |
| 4300000963 BLADE,ROTOR,DWG.981-8205,FOR KT-202 | S | Monitor | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 39% | – |
| 4100096628 DEMISTER PAD,TYPE PS660,VITON | B | Reduce | Non-moving | 6 EA | – | 5 / 7 | 0 / 0 / 1 | – | 0% | −Rp 77.1M |
| 4300053963 COUPLING,DWG.301-3972,FOR KC-371B | B | Reduce | Non-moving | 10 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 77.0M |
| 4300053508 COUPLING,DWG.247-6964,FOR KC-773A | S | Reduce | Slow-moving | 13 SET | – | 0 / 0 | 1 / 1 / 4 | – | 0% | −Rp 77.0M |
| 4300020645 COUPLING,DWG.866-1915,FOR KC-886D | B | Reduce | Excess | 13 SET | – | 0 / 0 | 2 / 2 / 4 | – | 0% | −Rp 77.0M |
| 4300059905 COUPLING,DWG.744-2324,FOR PP-138 | A | Reduce | Non-moving | 10 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 77.0M |
| 4300001811 IMPELLER,DWG.502-3164,FOR PP-570 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 10% | – |
| 4100100714 BOLT,ANCHOR,TYPE NX600,VITON | A | Monitor | Critical insurance spare | 1 EA | – | 1 / 3 | 3 / 3 / 5 | – | 8% | – |
| 4100024181Safety-criticalSign-off STUDBOLT,5/8INX85MM,B7/2H | A | Reduce | Excess | 2,983 EA | 9,247 | 1,065 / 3,335 | 501 / 699 / 1,398 | – | 0% | −Rp 76.2M |
| 4100061684Long-lead THERMOCOUPLE,N-1ELMNT,6.4X700LG | A | Reduce | Non-moving | 16 EA | – | 4 / 7 | 1 / 1 / 2 | – | 0% | −Rp 75.8M |
| 4300072860Safety-criticalSign-off DISC,SAFETY VALVE,DWG.130-7569,FOR PRV-1 | S | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 75.2M |
| 4300064641Safety-criticalSign-off DISC,SAFETY VALVE,DWG.936-9563,FOR PRV-3 | S | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 75.2M |
| 4100069395Safety-criticalSign-off DISC,SAFETY VALVE,MODEL VM630,NBR | S | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 75.2M |
| 4300049995Safety-criticalSign-off DISC,SAFETY VALVE,DWG.813-6281,FOR PRV-8 | S | Reduce | Non-moving | 7 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 75.2M |
| 4300018499Safety-criticalSign-off DISC,SAFETY VALVE,DWG.921-3594,FOR PRV-1 | A | Reduce | Slow-moving | 11 EA | – | 1 / 2 | 3 / 3 / 5 | – | 0% | −Rp 75.2M |
| 4200010500 FAN,COOLING MOTOR,DWG.844-3292,FOR PP-83 | A | Reduce | Non-moving | 62 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 75.2M |
| 4100056789 TRANSMITTER,PRESS,MODEL ZO828,NBR | C | Reduce | Excess | 4 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 74.9M |
| 4100047659 DIAPHRAGM,ACTUATOR,SIZE WW898,VITON | C | Reduce | Potentially obsolete | 18 EA | – | 10 / 28 | 0 / 0 / 1 | – | 0% | −Rp 74.5M |
| 4100029901 ELBOW,45DEG,1/4IN,3000#,A105,BW | A | Monitor | Insurance gap | 0 EA | – | 1 / 3 | 9 / 9 / 14 | – | 7% | – |
| 4100031452 TEE,3IN,3000#,A234WPB,BW | C | Reduce | Potentially obsolete | 140 EA | – | 5 / 8 | don't stock | – | 0% | −Rp 74.0M |
| 4100034837 VALVE,GATE,3/4IN,150#,A216WCB,RF | A | Monitor | Insurance gap | 0 EA | – | 1 / 3 | 2 / 2 / 4 | – | 7% | – |
| 4200006566 FAN,COOLING MOTOR,TYPE KR888,MONEL | A | Reduce | Non-moving | 61 EA | – | 10 / 25 | 0 / 0 / 2 | – | 0% | −Rp 74.0M |
| 4300071720 RING,WEAR,DWG.784-2722,FOR PP-1460A | A | Reduce | Non-moving | 11 EA | – | 10 / 18 | 1 / 1 / 2 | – | 0% | −Rp 73.7M |
| 4300031290 RING,WEAR,DWG.896-3883,FOR PP-1597B | B | Reduce | Non-moving | 10 EA | – | 4 / 11 | 0 / 0 / 1 | – | 0% | −Rp 73.7M |
| 4300045916 RING,WEAR,DWG.346-5524,FOR PP-821 | B | Reduce | Non-moving | 10 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 73.7M |
| 4300058284 RING,WEAR,DWG.756-9831,FOR PP-900A | A | Reduce | Non-moving | 10 EA | – | 3 / 5 | 0 / 0 / 1 | – | 0% | −Rp 73.7M |
| 4100036568 VALVE,GLOBE,1/4IN,800#,A105,RF | C | Reduce | Potentially obsolete | 28 EA | – | 10 / 30 | don't stock | – | 0% | −Rp 73.6M |
| 4300042013 BEARING,THRUST PAD,DWG.795-6768,FOR KC-8 | A | Monitor | Slow-moving | 2 SET | – | 0 / 0 | 0 / 0 / 6 | reorder ~29 May 2027 | 7% | – |
| 4100009614 SLEEVE,SHAFT,MODEL IL881,A105 | B | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 72.8M |
| 4100015641 GASKET,RING,3IN,600#,GRAPHITE | A | Reduce | Non-moving | 347 EA | – | 5 / 15 | 4 / 4 / 8 | – | 0% | −Rp 72.7M |
| 4200010196 FAN,COOLING MOTOR,DWG.702-9936,FOR PP-17 | C | Reduce | Potentially obsolete | 58 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 72.7M |
| 4300073972 THERMOWELL,DWG.208-6367,FOR TEL-205-26B | C | Reduce | Potentially obsolete | 12 EA | – | 10 / 28 | don't stock | – | 0% | −Rp 72.6M |
| 4100073826 CASTABLE,REFRACTORY,INSUL,1500DEG C | A | Monitor | Insurance gap | 0 KG | – | 0 / 0 | 85 / 91 / 182 | – | 7% | – |
| 4100075227 CASTABLE,REFRACTORY,INSUL,1600DEG C | A | Monitor | Critical insurance spare | 18 KG | – | 5 / 12 | 85 / 91 / 182 | – | 7% | – |
| 4100073904 CASTABLE,REFRACTORY,INSUL,1700DEG C | A | Monitor | Insurance gap | 0 KG | – | 0 / 0 | 85 / 91 / 182 | – | 7% | – |
| 4100074819 CASTABLE,REFRACTORY,LW,1700DEG C | A | Monitor | Insurance gap | 0 KG | – | 3 / 6 | 85 / 91 / 182 | – | 7% | – |
| 4100078522 BURNER TIP,TYPE ZM201,A182F11 | A | Monitor | Critical insurance spare | 1 EA | – | 0 / 0 | 3 / 3 / 5 | – | 7% | – |
| 4300036494 IMPELLER,DWG.793-6189,FOR PP-1776B | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 7% | – |
| 4300006909 SEAL,LABYRINTH,DWG.414-5376,FOR KC-536A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 1 / 1 / 2 | – | 7% | – |
| 4100026397 STUDBOLT,5/8INX70MM,B16/4 | A | Monitor | Critical insurance spare | 5 EA | – | 5 / 13 | 53 / 54 / 86 | – | 7% | – |
| 4100055180 SWITCH,LIMIT,SIZE FY666,CS | C | Reduce | Potentially obsolete | 12 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 71.5M |
| 4100053922Safety-criticalSign-off SWITCH,LIMIT,SIZE WJ682,A182F11 | S | Reduce | Non-moving | 14 EA | – | 10 / 16 | 0 / 0 / 2 | – | 0% | −Rp 71.5M |
| 4300016162 TRIM SET,CONTROL VALVE,DWG.429-5338,FOR | C | Reduce | Slow-moving | 3 SET | 1 | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 71.5M |
| 4100100954 BOLT,ANCHOR,MODEL OH343,SS304 | A | Monitor | Insurance gap | 0 EA | – | 1 / 3 | 3 / 3 / 5 | – | 7% | – |
| 4100080327 ANCHOR,REFRACTORY,SIZE SC838,VITON | A | Monitor | Critical insurance spare | 456 EA | – | 0 / 0 | 898 / 1,050 / 1,593 | – | 7% | – |
| 4100035415 VALVE,GATE,10IN,800#,CF8,SW | A | Reduce | Non-moving | 32 EA | – | 5 / 15 | 3 / 3 / 5 | – | 0% | −Rp 71.0M |
| 4300039543Long-lead SEAL,LABYRINTH,DWG.890-9137,FOR KT-419A | A | Reduce | Non-moving | 4 SET | 1 | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 70.7M |
| 4300030369 SPRING,SAFETY VALVE,DWG.513-7435,FOR KT- | S | Reduce | Potentially obsolete | 8 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 70.5M |
| 4300043578 SPRING,SAFETY VALVE,DWG.981-2843,FOR KT- | S | Reduce | Potentially obsolete | 8 EA | – | 5 / 9 | don't stock | – | 0% | −Rp 70.5M |