Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,848 spare parts
Order value Rp 0 · excess value Rp 3.41T · page 11 of 37
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100053261Safety-criticalSign-off SOLENOID VALVE,SIZE IJ684,A105 | A | Reduce | Non-moving | 48 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 519.3M |
| 4300038364 POSITIONER,VALVE,DWG.526-4119,FOR LCV-19 | B | Reduce | Non-moving | 13 EA | – | 10 / 27 | don't stock | – | 0% | −Rp 518.9M |
| 4300045515 SLEEVE,SHAFT,DWG.483-6612,FOR PP-1029C | B | Reduce | Non-moving | 65 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 517.6M |
| 4300005767Long-lead BEARING,JOURNAL,DWG.465-9776,FOR KT-460B | A | Reduce | Non-moving | 3 SET | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 515.0M |
| 4100058314 TRANSMITTER,DIFF.PRESS,0~500MMH2O,FF | A | Reduce | Non-moving | 15 EA | – | 10 / 27 | don't stock | – | 0% | −Rp 512.1M |
| 4300071282 IMPELLER,DWG.938-4803,FOR PP-1470B | A | Reduce | Non-moving | 6 EA | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 510.5M |
| 4300031376 IMPELLER,DWG.968-1131,FOR PP-1886B | B | Reduce | Non-moving | 5 EA | – | 4 / 8 | don't stock | – | 0% | −Rp 510.5M |
| 4300059287 IMPELLER,DWG.547-1712,FOR PP-413 | B | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 510.5M |
| 4300058729 IMPELLER,DWG.258-3242,FOR PP-785A | B | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 510.5M |
| 4300008876 SEAT RING,VALVE,DWG.381-6230,FOR FCV-176 | B | Reduce | Non-moving | 45 EA | – | 10 / 25 | 0 / 0 / 1 | – | 0% | −Rp 496.3M |
| 4100074324 CASTABLE,REFRACTORY,LW,1700DEG C | A | Reduce | Non-moving | 11,571 KG | – | 0 / 0 | 173 / 181 / 272 | – | 0% | −Rp 495.3M |
| 4100068527Safety-criticalSign-off DISC,SAFETY VALVE,TYPE PC859,CS | C | Reduce | Non-moving | 40 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 489.1M |
| 4300052969 POSITIONER,VALVE,DWG.476-5617,FOR FCV-14 | A | Reduce | Non-moving | 12 EA | – | 5 / 15 | don't stock | – | 0% | −Rp 479.0M |
| 4100056018 TRANSMITTER,PRESS,SIZE KL809,VITON | B | Reduce | Non-moving | 15 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 478.0M |
| 4300014054 VALVE,GOVERNOR,DWG.965-2083,FOR KT-308B | A | Reduce | Non-moving | 2 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 476.6M |
| 4300040850 VALVE,GOVERNOR,DWG.113-7171,FOR KT-419A | A | Reduce | Non-moving | 3 ASS | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 476.6M |
| 4300005582 VALVE,GOVERNOR,DWG.219-1825,FOR KT-460B | A | Reduce | Non-moving | 3 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 476.6M |
| 4300069318 VALVE,GOVERNOR,DWG.264-3070,FOR KT-513 | A | Reduce | Non-moving | 3 ASS | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 476.6M |
| 4300022421 VALVE,GOVERNOR,DWG.595-7807,FOR KT-856A | A | Reduce | Non-moving | 3 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 476.6M |
| 4100090730 VALVE,GOVERNOR,MODEL LJ891,GRAPHITE | A | Reduce | Non-moving | 3 ASS | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 476.6M |
| 4100089986 VALVE,GOVERNOR,SIZE LO675,INCOLOY | A | Reduce | Non-moving | 3 ASS | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 476.6M |
| 4300074706 SEAL,LABYRINTH,DWG.587-3462,FOR KC-226 | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |
| 4300002324 SEAL,LABYRINTH,DWG.939-1341,FOR KC-316D | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |
| 4300020051 SEAL,LABYRINTH,DWG.771-5254,FOR KC-435A | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |
| 4300042020 SEAL,LABYRINTH,DWG.674-8498,FOR KC-801 | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |
| 4300017006 SEAL,LABYRINTH,DWG.908-1551,FOR KT-264A | S | Reduce | Non-moving | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 472.9M |
| 4100085061 SEAL,LABYRINTH,MODEL WX109,PTFE | A | Reduce | Non-moving | 6 SET | – | 5 / 9 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |
| 4300040730 SEAL,LABYRINTH,DWG.577-7053,FOR KT-419A | A | Reduce | Non-moving | 6 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |
| 4300005428 SEAL,LABYRINTH,DWG.578-9615,FOR KT-460B | A | Reduce | Non-moving | 6 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |
| 4100006725 SEAL,MECHANICAL,MODEL VA716,SS316 | A | Reduce | Non-moving | 6 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |
| 4100006043 SEAL,MECHANICAL,TYPE LA401,INCOLOY | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 472.9M |
| 4100006593 SEAL,MECHANICAL,MODEL NU664,SS304 | B | Reduce | Non-moving | 6 SET | – | 5 / 10 | 0 / 0 / 1 | – | 0% | −Rp 472.9M |
| 4100044502 TRIM SET,CONTROL VALVE,MODEL HG852,VITON | C | Reduce | Non-moving | 6 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 471.0M |
| 4300015261 TRIM SET,CONTROL VALVE,DWG.921-3701,FOR | A | Reduce | Non-moving | 7 SET | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 471.0M |
| 4300060120 TRIM SET,CONTROL VALVE,DWG.600-4906,FOR | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 471.0M |
| 4300040967 TRIM SET,CONTROL VALVE,DWG.127-5251,FOR | B | Reduce | Non-moving | 6 SET | – | 5 / 10 | don't stock | – | 0% | −Rp 471.0M |
| 4100002199 BEARING,BALL,1ROW,DEEP GROOVE,6207 C3 | A | Reduce | Non-moving | 323 EA | – | 5 / 8 | 2 / 2 / 4 | – | 0% | −Rp 454.5M |
| 4100078786 BURNER TIP,MODEL BI299,SS316 | A | Reduce | Non-moving | 30 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 449.3M |
| 4100097010 DEMISTER PAD,SIZE UF180,INCOLOY | A | Reduce | Non-moving | 30 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 447.3M |
| 4100038518 VALVE,NEEDLE,1/2IN ODT,3000PSI,SS316 | A | Reduce | Non-moving | 172 EA | – | 3 / 7 | 0 / 0 / 2 | – | 0% | −Rp 446.8M |
| 4300063167 POSITIONER,VALVE,DWG.925-8601,FOR TCV-19 | B | Reduce | Non-moving | 11 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 439.1M |
| 4300009998 POSITIONER,VALVE,DWG.303-4842,FOR TCV-82 | A | Reduce | Non-moving | 12 EA | – | 10 / 26 | 0 / 0 / 1 | – | 0% | −Rp 439.1M |
| 4300014419 BEARING,THRUST PAD,DWG.220-7977,FOR KC-1 | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 438.5M |
| 4300048775 BEARING,THRUST PAD,DWG.148-3254,FOR KC-1 | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 438.5M |
| 4300044807 BEARING,THRUST PAD,DWG.986-8706,FOR KC-2 | B | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 438.5M |
| 4300074733 BEARING,JOURNAL,DWG.555-7759,FOR KC-226 | A | Reduce | Non-moving | 3 SET | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 438.5M |
| 4300071147 BEARING,THRUST PAD,DWG.792-6454,FOR KC-2 | A | Reduce | Non-moving | 3 SET | – | 10 / 25 | 0 / 0 / 1 | – | 0% | −Rp 438.5M |
| 4300020093 BEARING,JOURNAL,DWG.509-1442,FOR KC-435A | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 438.5M |
| 4100081001 BEARING,JOURNAL,MODEL DS290,A105 | A | Reduce | Non-moving | 4 SET | – | 2 / 4 | 1 / 1 / 2 | – | 0% | −Rp 438.5M |
| 4300035955 BEARING,THRUST PAD,DWG.169-2757,FOR KC-6 | B | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 438.5M |