Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,848 spare parts
Order value Rp 0 · excess value Rp 3.41T · page 20 of 37
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100011513 COUPLING,MODEL US954,GRAPHITE | B | Reduce | Non-moving | 13 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 102.7M |
| 4100002635 BEARING,ROLLER,CYL,1ROW,NU314-2Z | A | Reduce | Non-moving | 76 EA | – | 1 / 3 | 2 / 2 / 4 | – | 0% | −Rp 102.6M |
| 4100058265 TRANSMITTER,DIFF.PRESS,0~10000MMH2O,FF | B | Reduce | Non-moving | 3 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 102.4M |
| 4100059254 TRANSMITTER,TEMP,TYPE TN117,A182F11 | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 102.4M |
| 4100057472 TRANSMITTER,DIFF.PRESS,0~10000MMH2O,HART | B | Reduce | Non-moving | 3 EA | – | 2 / 5 | don't stock | – | 0% | – |
| 4100057853 TRANSMITTER,DIFF.PRESS,0~500MMH2O,FF | A | Reduce | Non-moving | 4 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 102.4M |
| 4100060302 TRANSMITTER,TEMP,TYPE ZS21,SS316 | B | Reduce | Non-moving | 3 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 102.4M |
| 4100058642 TRANSMITTER,DIFF.PRESS,0~5000MMH2O,FF | A | Reduce | Non-moving | 4 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 102.4M |
| 4300056458 IMPELLER,DWG.373-6552,FOR PP-139 | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 102.1M |
| 4300025160 IMPELLER,DWG.845-8690,FOR PP-1478B | A | Reduce | Non-moving | 2 EA | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 102.1M |
| 4300038618 IMPELLER,DWG.542-1543,FOR PP-233A | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 102.1M |
| 4300059298 IMPELLER,DWG.145-1518,FOR PP-413 | B | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 102.1M |
| 4300055471 IMPELLER,DWG.388-9494,FOR PP-614 | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 102.1M |
| 4300009972 IMPELLER,DWG.686-2019,FOR PP-681B | B | Reduce | Non-moving | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 102.1M |
| 4300053699 IMPELLER,DWG.721-5784,FOR PP-795D | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 102.1M |
| 4100052830Safety-criticalSign-off SOLENOID VALVE,TYPE PW365,SS304 | A | Reduce | Non-moving | 10 EA | – | 5 / 16 | 0 / 0 / 1 | – | 0% | −Rp 101.6M |
| 4100050525 SEAT RING,VALVE,MODEL SR337,PTFE | A | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 101.5M |
| 4300007135 SEAT RING,VALVE,DWG.915-3252,FOR TCV-687 | A | Reduce | Non-moving | 10 EA | – | 5 / 15 | 0 / 0 / 1 | – | 0% | −Rp 101.5M |
| 4300054775Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.262-2460,FOR PRV | A | Reduce | Non-moving | 6 EA | – | 5 / 8 | 0 / 0 / 1 | – | 0% | −Rp 101.4M |
| 4100068057Safety-criticalSign-off DISC,SAFETY VALVE,MODEL SM332,NBR | S | Reduce | Non-moving | 9 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 100.3M |
| 4100002729 BEARING,BALL,ANGULAR,7216-2Z | B | Reduce | Non-moving | 72 EA | – | 2 / 3 | 0 / 0 / 2 | – | 0% | −Rp 99.7M |
| 4300009933 RING,WEAR,DWG.885-6573,FOR PP-1383 | A | Reduce | Non-moving | 13 EA | – | 10 / 15 | 0 / 0 / 1 | – | 0% | −Rp 98.2M |
| 4300027180 RING,WEAR,DWG.207-2554,FOR PP-1764 | B | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 98.2M |
| 4300009152 SLEEVE,SHAFT,DWG.262-7592,FOR PP-638A | A | Reduce | Non-moving | 13 EA | – | 5 / 8 | 0 / 0 / 1 | – | 0% | −Rp 97.1M |
| 4300058408Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.557-5730,FOR PRV | S | Reduce | Non-moving | 12 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 97.0M |
| 4100093468 TUBE PLUG,EXCHANGER,TYPE MC864,NBR | A | Reduce | Non-moving | 192 EA | – | 2 / 5 | 1 / 1 / 2 | – | 0% | −Rp 96.0M |
| 4300021284 SEAL,LABYRINTH,DWG.208-6692,FOR KC-155D | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4100084857 SEAL,LABYRINTH,MODEL NH642,CS | S | Reduce | Non-moving | 1 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 94.6M |
| 4300015867 SEAL,LABYRINTH,DWG.580-4632,FOR KC-854C | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4100085612 SEAL,LABYRINTH,TYPE TW791,MONEL | A | Reduce | Non-moving | 2 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4300017397 SEAL,LABYRINTH,DWG.108-6739,FOR KT-264A | S | Reduce | Non-moving | 1 SET | – | 0 / 0 | don't stock | – | 4% | −Rp 94.6M |
| 4300069834 SEAL,LABYRINTH,DWG.772-2728,FOR KT-513 | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4300070153 SEAL,LABYRINTH,DWG.434-3305,FOR KT-513 | A | Reduce | Non-moving | 2 SET | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4300022130 SEAL,LABYRINTH,DWG.308-3493,FOR KT-856A | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4100005970 SEAL,MECHANICAL,MODEL WS708,GRAPHITE | A | Reduce | Non-moving | 2 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4100006643 SEAL,MECHANICAL,MODEL ZV418,A105 | A | Reduce | Non-moving | 2 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4100006221 SEAL,MECHANICAL,MODEL LK224,NBR | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 94.6M |
| 4300068800 COUPLING,DWG.651-4324,FOR PP-1890 | A | Reduce | Non-moving | 12 SET | – | 4 / 11 | 0 / 0 / 1 | – | 0% | −Rp 94.1M |
| 4100078674 BURNER TIP,SIZE FR884,MONEL | B | Reduce | Non-moving | 7 EA | – | 5 / 9 | 0 / 0 / 1 | – | 0% | −Rp 93.0M |
| 4100076877 CERAMIC FIBER,BLANKET,25T,128KG/M3,1430C | A | Reduce | Non-moving | 74 RL | – | 1 / 2 | 3 / 3 / 5 | – | 0% | −Rp 86.5M |
| 4300036556 SEAT RING,VALVE,DWG.363-3364,FOR FCV-190 | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 90.2M |
| 4300026169 RING,WEAR,DWG.836-4588,FOR PP-915A | A | Reduce | Non-moving | 12 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 90.0M |
| 4300027365Long-lead POSITIONER,VALVE,DWG.939-3221,FOR FCV-60 | A | Reduce | Non-moving | 2 EA | 1 | 1 / 2 | don't stock | – | 0% | −Rp 89.3M |
| 4300059272 SLEEVE,SHAFT,DWG.696-4283,FOR PP-413 | B | Reduce | Non-moving | 13 EA | – | 3 / 7 | 1 / 1 / 2 | – | 0% | −Rp 89.0M |
| 4300013008 SPRING,SAFETY VALVE,DWG.944-8529,FOR KT- | A | Reduce | Non-moving | 11 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 88.2M |
| 4300004961 SPRING,SAFETY VALVE,DWG.972-8547,FOR KT- | A | Reduce | Non-moving | 12 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 88.2M |
| 4300009017Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.489-7285,FOR PRV | S | Reduce | Non-moving | 11 EA | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 88.2M |
| 4100068603Safety-criticalSign-off DISC,SAFETY VALVE,TYPE AN114,VITON | S | Reduce | Non-moving | 8 EA | – | 5 / 9 | 0 / 0 / 1 | – | 0% | −Rp 87.8M |
| 4300027169Safety-criticalSign-off DISC,SAFETY VALVE,DWG.685-5400,FOR PRV-9 | S | Reduce | Non-moving | 8 EA | – | 5 / 16 | 0 / 0 / 1 | – | 0% | −Rp 87.8M |
| 4100065980 GAUGE,PRESSURE,0-16KG/CM2,6IN DIAL | B | Reduce | Non-moving | 33 EA | – | 5 / 14 | don't stock | – | 0% | −Rp 87.6M |