Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,848 spare parts
Order value Rp 0 · excess value Rp 3.41T · page 25 of 37
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300058870 RING,WEAR,DWG.400-4004,FOR PP-1141A | B | Reduce | Non-moving | 6 EA | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 40.9M |
| 4100013139 RING,WEAR,MODEL QX377,A105 | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 1 / 1 / 4 | – | 0% | −Rp 40.9M |
| 4100012530 RING,WEAR,MODEL CN469,A105 | B | Reduce | Non-moving | 6 EA | – | 5 / 16 | 0 / 0 / 1 | – | 0% | −Rp 40.9M |
| 4100013902 RING,WEAR,SIZE BM375,SS304 | B | Reduce | Non-moving | 6 EA | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 40.9M |
| 4300012279Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.904-4189,FOR PRV | S | Reduce | Non-moving | 3 EA | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 40.6M |
| 4300063500Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.331-5933,FOR PRV | S | Reduce | Non-moving | 3 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 40.6M |
| 4300074376Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.164-9858,FOR PRV | S | Reduce | Non-moving | 3 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 40.6M |
| 4100069832Safety-criticalSign-off NOZZLE,SAFETY VALVE,MODEL FA649,INCOLOY | S | Reduce | Non-moving | 3 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 40.6M |
| 4300034104Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.547-1075,FOR PRV | S | Reduce | Non-moving | 3 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 40.6M |
| 4300015354 SLEEVE,SHAFT,DWG.397-9904,FOR PP-1022 | A | Reduce | Non-moving | 7 EA | – | 2 / 5 | 1 / 1 / 2 | – | 0% | −Rp 40.4M |
| 4300052993 SLEEVE,SHAFT,DWG.210-9623,FOR PP-169A | B | Reduce | Non-moving | 6 EA | – | 4 / 11 | 0 / 0 / 1 | – | 0% | −Rp 40.4M |
| 4300047530 SLEEVE,SHAFT,DWG.863-3870,FOR PP-205B | B | Reduce | Non-moving | 6 EA | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 40.4M |
| 4100022716 O-RING,NBR,278MM ID,5.3MM CS | A | Reduce | Non-moving | 1,023 EA | – | 10 / 28 | 3 / 3 / 6 | – | 0% | −Rp 40.4M |
| 4100048832 POSITIONER,VALVE,SIZE IH144,A182F11 | A | Reduce | Non-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 39.9M |
| 4300072546 POSITIONER,VALVE,DWG.355-5006,FOR FCV-17 | A | Reduce | Non-moving | 1 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 39.9M |
| 4300054606 POSITIONER,VALVE,DWG.471-8701,FOR FCV-27 | B | Reduce | Non-moving | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 39.9M |
| 4300055262 POSITIONER,VALVE,DWG.669-5607,FOR FCV-52 | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 39.9M |
| 4300038803 POSITIONER,VALVE,DWG.254-1518,FOR FCV-80 | B | Reduce | Non-moving | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 39.9M |
| 4300055201 POSITIONER,VALVE,DWG.747-8720,FOR LCV-55 | A | Reduce | Non-moving | 2 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 39.9M |
| 4100049320 POSITIONER,VALVE,TYPE EE991,NBR | A | Reduce | Non-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 39.9M |
| 4300072803 POSITIONER,VALVE,DWG.600-4106,FOR PCV-38 | A | Reduce | Non-moving | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 39.9M |
| 4300048466 POSITIONER,VALVE,DWG.811-8903,FOR PCV-45 | A | Reduce | Non-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 39.9M |
| 4300027514 POSITIONER,VALVE,DWG.980-1606,FOR PCV-61 | A | Reduce | Non-moving | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 39.9M |
| 4300027323 POSITIONER,VALVE,DWG.955-1972,FOR PCV-65 | A | Reduce | Non-moving | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 39.9M |
| 4300064210 POSITIONER,VALVE,DWG.438-9879,FOR TCV-17 | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 39.9M |
| 4300036520 POSITIONER,VALVE,DWG.292-2446,FOR FCV-19 | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 39.9M |
| 4300007160 POSITIONER,VALVE,DWG.203-6579,FOR TCV-68 | A | Reduce | Non-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 39.9M |
| 4100042903 TUBING,SIZE GN560,CS | B | Reduce | Non-moving | 116 M | – | 2 / 4 | don't stock | – | 0% | −Rp 39.8M |
| 4100039184 VALVE,NEEDLE,1/4IN NPT,3000PSI,SS316 | B | Reduce | Non-moving | 15 EA | – | 5 / 11 | don't stock | – | 0% | −Rp 39.4M |
| 4100020685Safety-criticalSign-off O-RING,NBR,230MM ID,2.5MM CS | A | Reduce | Non-moving | 989 EA | – | 10 / 27 | 3 / 3 / 6 | – | 0% | −Rp 39.0M |
| 4100061310 THERMOCOUPLE,K-2ELMNT,3.2X1300LG | A | Reduce | Non-moving | 9 EA | – | 5 / 13 | 2 / 2 / 3 | – | 0% | −Rp 38.4M |
| 4100061348 THERMOCOUPLE,J-2ELMNT,8X3700LG | A | Reduce | Non-moving | 8 EA | – | 5 / 12 | 1 / 1 / 2 | – | 0% | −Rp 38.4M |
| 4300053061Long-lead POSITIONER,VALVE,DWG.317-5830,FOR FCV-10 | B | Reduce | Non-moving | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 37.8M |
| 4300012522Safety-criticalSign-off DISC,SAFETY VALVE,DWG.219-5955,FOR PRV-1 | C | Reduce | Non-moving | 4 EA | – | 3 / 9 | 0 / 0 / 1 | – | 0% | −Rp 37.6M |
| 4100069175Safety-criticalSign-off DISC,SAFETY VALVE,SIZE BH152,CS | S | Reduce | Non-moving | 4 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 37.6M |
| 4300073670Safety-criticalSign-off DISC,SAFETY VALVE,DWG.726-4770,FOR PRV-1 | S | Reduce | Non-moving | 4 EA | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 37.6M |
| 4300064739Safety-criticalSign-off DISC,SAFETY VALVE,DWG.989-6821,FOR PRV-1 | S | Reduce | Non-moving | 4 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 37.6M |
| 4300065765Safety-criticalSign-off DISC,SAFETY VALVE,DWG.969-1728,FOR PRV-6 | S | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 37.6M |
| 4300021726Safety-criticalSign-off DISC,SAFETY VALVE,DWG.729-3295,FOR PRV-7 | S | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 37.6M |
| 4300047052Safety-criticalSign-off DISC,SAFETY VALVE,DWG.793-2387,FOR PRV-7 | S | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 37.6M |
| 4300055677Safety-criticalSign-off DISC,SAFETY VALVE,DWG.625-5434,FOR PRV-9 | C | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 37.6M |
| 4100068229Safety-criticalSign-off DISC,SAFETY VALVE,SIZE QQ655,PTFE | S | Reduce | Non-moving | 4 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 37.6M |
| 4300065874 THERMOWELL,DWG.463-9697,FOR TEL-1319-57 | B | Reduce | Non-moving | 6 EA | – | 2 / 6 | don't stock | – | 0% | −Rp 36.3M |
| 4100087022 FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-4 | A | Reduce | Non-moving | 15 EA | – | 10 / 24 | 0 / 0 / 2 | – | 0% | −Rp 36.0M |
| 4100086893 FILTER ELEMENT,SEAL GAS,3MICRON,P/N FE-5 | A | Reduce | Non-moving | 17 EA | – | 4 / 11 | 2 / 2 / 4 | – | 0% | −Rp 36.0M |
| 4300022187 SPRING,SAFETY VALVE,DWG.617-6460,FOR KT- | A | Reduce | Non-moving | 6 EA | – | 2 / 3 | 1 / 1 / 2 | – | 0% | −Rp 35.3M |
| 4300022986 SPRING,SAFETY VALVE,DWG.432-7582,FOR KT- | A | Reduce | Non-moving | 6 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 35.3M |
| 4300073076Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.789-3660,FOR PRV | S | Reduce | Non-moving | 5 EA | – | 4 / 9 | 0 / 0 / 1 | – | 0% | −Rp 35.3M |
| 4300074012Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.492-3704,FOR PRV | B | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 35.3M |
| 4300065766Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.838-6999,FOR PRV | S | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 35.3M |