Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 121 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300055608 TRIM SET,CONTROL VALVE,DWG.176-5277,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300025175 TRIM SET,CONTROL VALVE,DWG.724-7923,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300072111 TRIM SET,CONTROL VALVE,DWG.397-3472,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300008315 TRIM SET,CONTROL VALVE,DWG.863-6553,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300007549 TRIM SET,CONTROL VALVE,DWG.457-8395,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300046778 TRIM SET,CONTROL VALVE,DWG.354-2786,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300019638 TRIM SET,CONTROL VALVE,DWG.310-9091,FOR | A | Maintain | No stock needed | 0 SET | – | 3 / 8 | don't stock | – | 0% | – |
| 4300047714 TRIM SET,CONTROL VALVE,DWG.821-6999,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300021534Long-lead TRIM SET,CONTROL VALVE,DWG.539-4886,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100061456 THERMOCOUPLE,K-1ELMNT,8X3400LG | S | Maintain | No stock needed | 0 EA | – | 2 / 5 | don't stock | – | 1% | – |
| 4100024943 STUDBOLT,1/2INX70MM,B7/2H | A | Reduce | Slow-moving | 236 EA | – | 72 / 121 | 65 / 71 / 176 | – | 0% | −Rp 1.4M |
| 4100102728 ANTIRUST,SPRAY TYPE,500ML/CAN,TYPE-B | C | Reduce | Potentially obsolete | 19 CAN | – | 10 / 24 | don't stock | – | 0% | −Rp 1.4M |
| 4100078842 BURNER TIP,TYPE YA851,PTFE | A | Monitor | Critical insurance spare | 2 EA | – | 0 / 0 | 2 / 2 / 3 | – | 0% | – |
| 4200010310 FAN,COOLING MOTOR,DWG.635-7102,FOR PP-11 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200010674 FAN,COOLING MOTOR,DWG.110-7732,FOR PP-11 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200011020 FAN,COOLING MOTOR,DWG.376-7648,FOR PP-13 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200011347 FAN,COOLING MOTOR,DWG.825-2260,FOR PP-15 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200011477 FAN,COOLING MOTOR,DWG.652-6713,FOR PP-16 | A | Monitor | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 2 | reorder ~19 Sept 2124 | 0% | – |
| 4200011134 FAN,COOLING MOTOR,DWG.629-8130,FOR PP-16 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200006443 FAN,COOLING MOTOR,MODEL FF597,A105 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200011047 FAN,COOLING MOTOR,DWG.197-6321,FOR PP-17 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200008086 FAN,COOLING MOTOR,TYPE UB297,CS | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200011069 FAN,COOLING MOTOR,DWG.198-5574,FOR PP-27 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200010081 FAN,COOLING MOTOR,DWG.229-9600,FOR PP-41 | A | Monitor | Insurance gap | 0 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | – |
| 4200011313 FAN,COOLING MOTOR,DWG.160-6518,FOR PP-43 | A | Monitor | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 2 | reorder ~19 Sept 2124 | 0% | – |
| 4200011344 FAN,COOLING MOTOR,DWG.284-8184,FOR PP-43 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200007187 FAN,COOLING MOTOR,TYPE PU258,PTFE | A | Monitor | Critical insurance spare | 1 EA | – | 1 / 2 | 0 / 0 / 2 | reorder ~19 Sept 2124 | 0% | – |
| 4200010752 FAN,COOLING MOTOR,DWG.559-5161,FOR PP-47 | A | Monitor | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 2 | reorder ~19 Sept 2124 | 0% | – |
| 4200007236 FAN,COOLING MOTOR,MODEL WT160,MONEL | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4100042892 TUBING,MODEL IL292,CS | A | Reduce | Non-moving | 4 M | – | 2 / 4 | don't stock | – | 0% | −Rp 1.4M |
| 4100042023 TUBING,TYPE DO576,A105 | A | Reduce | Non-moving | 4 M | – | 2 / 5 | don't stock | – | 0% | −Rp 1.4M |
| 4300042611 BEARING,THRUST PAD,DWG.609-7215,FOR KT-7 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300042720 BEARING,JOURNAL,DWG.233-9315,FOR KT-778A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300042941 BEARING,THRUST PAD,DWG.611-1367,FOR KT-7 | S | Maintain | No stock needed | 0 SET | – | 2 / 4 | don't stock | – | 1% | – |
| 4300042950 BEARING,JOURNAL,DWG.682-2179,FOR KT-778A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300043007 BEARING,THRUST PAD,DWG.723-5764,FOR KT-7 | S | Monitor | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300043356 BEARING,JOURNAL,DWG.981-3141,FOR KT-778A | S | Monitor | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300043433 BEARING,THRUST PAD,DWG.310-8363,FOR KT-7 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300043467 BEARING,THRUST PAD,DWG.704-3984,FOR KT-7 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300043893 BEARING,JOURNAL,DWG.949-6194,FOR KT-778A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300043962 BEARING,JOURNAL,DWG.376-5099,FOR KT-778A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300061978 BEARING,JOURNAL,DWG.468-6680,FOR KT-875 | S | Maintain | No stock needed | 0 SET | – | 5 / 13 | don't stock | – | 1% | – |
| 4300061984 BEARING,THRUST PAD,DWG.274-2569,FOR KT-8 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4100083475 BEARING,THRUST PAD,SIZE HK240,INCOLOY | S | Maintain | No stock needed | 0 SET | – | 1 / 2 | don't stock | – | 1% | – |
| 4300062165 BEARING,JOURNAL,DWG.972-1040,FOR KT-875 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300062277 BEARING,JOURNAL,DWG.864-7870,FOR KT-875 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300062320 BEARING,THRUST PAD,DWG.170-9361,FOR KT-8 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300062334 BEARING,JOURNAL,DWG.210-4683,FOR KT-875 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300062350 BEARING,THRUST PAD,DWG.983-6807,FOR KT-8 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300062492 BEARING,THRUST PAD,DWG.576-6897,FOR KT-8 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |