Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 122 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300062625 BEARING,JOURNAL,DWG.201-7669,FOR KT-875 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300062746 BEARING,THRUST PAD,DWG.670-4732,FOR KT-8 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300062961 BEARING,JOURNAL,DWG.632-1784,FOR KT-875 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4100095208 TRAY VALVE,SIZE RL876,SS316 | S | Reduce | Potentially obsolete | 17 EA | – | 5 / 12 | 0 / 0 / 1 | – | 0% | −Rp 1.4M |
| 4300068938 SEAL,LABYRINTH,DWG.125-2997,FOR KC-732D | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100106004 SCREEN,WIRE,TYPE AJ791,A182F11 | S | Maintain | No stock needed | 0 SHT | – | 3 / 6 | don't stock | – | 1% | – |
| 4100051757 SEAT RING,VALVE,SIZE XL137,MONEL | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300026893 SEAT RING,VALVE,DWG.271-8849,FOR FCV-111 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300042439 SEAT RING,VALVE,DWG.386-2457,FOR FCV-393 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300045910 SEAT RING,VALVE,DWG.894-9893,FOR FCV-399 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300028263 SEAT RING,VALVE,DWG.208-2226,FOR FCV-763 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300038663 SEAT RING,VALVE,DWG.337-6158,FOR FCV-837 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100030296 ELBOW,45DEG,4IN,3000#,SS316,SW | C | Reduce | Potentially obsolete | 6 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 1.3M |
| 4100030338 ELBOW,90DEG,6IN,SCH80,A105,BW | C | Reduce | Potentially obsolete | 6 EA | – | 4 / 7 | don't stock | – | 0% | −Rp 1.3M |
| 4100016644 GASKET,RING,6IN,600#,GRAPHITE | A | Maintain | Critical insurance spare | 3 EA | – | 3 / 9 | 0 / 0 / 4 | – | 0% | – |
| 4100090067 VALVE,GOVERNOR,SIZE ZC915,CS | A | Monitor | Slow-moving | 1 ASS | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100053941Safety-critical SWITCH,LIMIT,MODEL EU665,SS304 | A | Monitor | Slow-moving | 3 EA | – | 1 / 2 | 2 / 2 / 4 | reorder ~08 Mar 2028 | 0% | – |
| 4200002626 GLAND,CABLE,MODEL MG110,SS304 | C | Reduce | Potentially obsolete | 9 EA | – | 2 / 4 | 0 / 0 / 2 | – | 0% | −Rp 1.3M |
| 4200002681 GLAND,CABLE,TYPE OU34,INCOLOY | C | Reduce | Potentially obsolete | 7 EA | – | 3 / 7 | don't stock | – | 0% | −Rp 1.3M |
| 4100015273 GASKET,RING,4IN,600#,GR/304 | A | Reduce | Non-moving | 17 EA | – | 0 / 0 | 7 / 7 / 11 | – | 0% | −Rp 1.3M |
| 4100018144Safety-criticalSign-off GASKET,SHEET,2IN,300#,GR/304 | A | Reduce | Non-moving | 14 EA | – | 10 / 18 | 4 / 4 / 8 | – | 0% | −Rp 1.3M |
| 4100018759 GASKET,RING,4IN,150#,GRAPHITE | A | Reduce | Non-moving | 14 EA | – | 10 / 19 | 4 / 4 / 8 | – | 0% | −Rp 1.3M |
| 4100018591Safety-criticalSign-off GASKET,SW,1/2IN,600#,GR/304 | B | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 4 | – | 0% | −Rp 1.3M |
| 4100018815 GASKET,SHEET,1IN,300#,GR/304 | C | Reduce | Potentially obsolete | 10 EA | – | 4 / 6 | 0 / 0 / 4 | – | 0% | −Rp 1.3M |
| 4100017580 GASKET,RING,2IN,150#,GRAPHITE | B | Reduce | Non-moving | 10 EA | – | 5 / 10 | 0 / 0 / 4 | – | 0% | −Rp 1.3M |
| 4100089818 VALVE,GOVERNOR,SIZE UI72,CS | A | Maintain | Critical insurance spare | 1 ASS | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100009394 SLEEVE,SHAFT,TYPE PM948,CS | C | Maintain | No stock needed | 0 EA | – | 1 / 2 | don't stock | – | 0% | – |
| 4300072444 SLEEVE,SHAFT,DWG.620-7488,FOR PP-1546A | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300072459 SLEEVE,SHAFT,DWG.479-2368,FOR PP-1546A | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100009125 SLEEVE,SHAFT,MODEL NM43,NBR | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300024025 SLEEVE,SHAFT,DWG.994-1605,FOR PP-778A | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100081244 BEARING,JOURNAL,MODEL TT461,PTFE | A | Maintain | Critical insurance spare | 1 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100049164 POSITIONER,VALVE,MODEL YK216,MONEL | A | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4300067013 POSITIONER,VALVE,DWG.751-5323,FOR TCV-14 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300066862 POSITIONER,VALVE,DWG.923-7296,FOR TCV-26 | A | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100017343 GASKET,SW,10IN,150#,GR/304 | A | Monitor | Critical insurance spare | 1 EA | – | 1 / 2 | 0 / 0 / 4 | reorder ~23 Aug 2046 | 0% | – |
| 4100013058 RING,WEAR,TYPE AP987,GRAPHITE | S | Maintain | No stock needed | 0 EA | – | 10 / 21 | don't stock | – | 1% | – |
| 4300049175 RING,WEAR,DWG.589-5730,FOR PP-820A | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4300059833 TRAY VALVE,DWG.202-2253,FOR CL-454 | A | Reduce | Non-moving | 17 EA | – | 10 / 28 | 1 / 1 / 2 | – | 0% | −Rp 1.3M |
| 4100105207 SCREEN,WIRE,MODEL DN944,A182F11 | A | Reduce | Slow-moving | 6 SHT | – | 1 / 3 | 2 / 2 / 3 | – | 0% | −Rp 1.3M |
| 4100105787 SCREEN,WIRE,MODEL KG616,A105 | B | Reduce | Non-moving | 5 SHT | – | 2 / 5 | 0 / 0 / 2 | – | 0% | −Rp 1.3M |
| 4100050427 SEAT RING,VALVE,TYPE KP567,GRAPHITE | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4200011181 FAN,COOLING MOTOR,DWG.159-7551,FOR PP-11 | A | Reduce | Non-moving | 3 EA | – | 2 / 4 | 0 / 0 / 2 | – | 0% | −Rp 1.3M |
| 4200010537 FAN,COOLING MOTOR,DWG.718-4807,FOR PP-11 | C | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3M |
| 4200009926 FAN,COOLING MOTOR,DWG.385-6150,FOR PP-16 | A | Reduce | Non-moving | 3 EA | – | 2 / 6 | 0 / 0 / 2 | – | 0% | −Rp 1.3M |
| 4300059341 IMPELLER,DWG.928-3926,FOR PP-413 | B | Maintain | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300035578 POSITIONER,VALVE,DWG.184-1661,FOR LCV-11 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300047029 POSITIONER,VALVE,DWG.597-8062,FOR LCV-15 | A | Monitor | Insurance gap | 0 EA | – | 3 / 9 | 0 / 0 / 1 | – | 0% | – |
| 4300067835 POSITIONER,VALVE,DWG.247-5763,FOR LCV-30 | A | Monitor | Insurance gap | 0 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | – |
| 4300055194 POSITIONER,VALVE,DWG.440-6115,FOR LCV-55 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |