Sparely
DU

Material List

One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.

Clear filters

7,481 spare parts

Order value Rp 123.8B · excess value Rp 5.62T · page 123 of 150

PartCrit.ActionHealthStockOn orderToday Min / MaxRec. SS / Min / MaxOrderStockout riskValue
4300036833Long-lead
COUPLING,DWG.700-6865,FOR PP-1748
B
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4100030406
ELBOW,45DEG,10IN,SCH40,A234WPB,BW
C
Reduce
Excess45 EA–1 / 33 / 3 / 6–0%−Rp 1.2M
4100019942
O-RING,VITON,258MM ID,3.5MM CS
C
Monitor
Healthy7 EA–1 / 35 / 5 / 12reorder ~18 Jan 20270%–
4100041587
CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316
A
Reduce
Non-moving11 EA–4 / 80 / 0 / 1–0%−Rp 859,971
4100041209
CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316
B
Reduce
Non-moving11 EA–5 / 70 / 0 / 1–0%−Rp 1.2M
4300024758
BEARING,THRUST PAD,DWG.212-6407,FOR KC-1
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300024282
BEARING,JOURNAL,DWG.181-8145,FOR KC-373
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300026712
BEARING,JOURNAL,DWG.651-5224,FOR KC-505D
S
Maintain
No stock needed0 SET–2 / 6don't stock–1%–
4300056829
BEARING,JOURNAL,DWG.768-4002,FOR KC-856A
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300061362
BEARING,JOURNAL,DWG.100-8980,FOR KC-890A
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300061517
BEARING,JOURNAL,DWG.834-6281,FOR KC-890A
S
Monitor
No stock needed0 SET–0 / 0don't stock–1%–
4300059520
BEARING,THRUST PAD,DWG.717-5814,FOR KC-9
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300059536
BEARING,JOURNAL,DWG.821-9846,FOR KC-984C
S
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4100093136
GREASE,COMPLEX,NLGI 2,180KG
A
Monitor
Critical insurance spare5 KG–1 / 20 / 0 / 98reorder ~30 Jan 20300%–
4100092523
GREASE,LITHIUM,NLGI 1,16KG
A
Monitor
Critical insurance spare4.5 KG–2 / 60 / 0 / 98reorder ~30 Sept 20290%–
4100092706
GREASE,COMPLEX,NLGI 1,16KG
A
Monitor
Critical insurance spare1 KG–1 / 20 / 0 / 98reorder ~01 Jun 20270%–
4100107738
OIL,LUBRICANT,ISO VG 32,MINERAL,209L
B
Monitor
Critical insurance spare1 L–4 / 90 / 0 / 11reorder ~30 Aug 20300%–
4100043368Long-lead
TRIM SET,CONTROL VALVE,SIZE NN15,PTFE
A
Maintain
Healthy2 SET31 / 23 / 4 / 5–0%–
4200003405
TERMINAL BLOCK,MODEL FH830,A182F11
A
Reduce
Non-moving19 EA–4 / 120 / 0 / 1–0%−Rp 1.2M
4100016506
GASKET,SW,6IN,600#,GR/304
A
Monitor
Critical insurance spare4 EA–3 / 57 / 7 / 11–0%–
4200005063
LAMP,LED,12W,220VAC,E27
C
Reduce
Slow-moving4 EA–0 / 00 / 0 / 1–0%−Rp 1.2M
4100044858Long-lead
TRIM SET,CONTROL VALVE,SIZE IR759,PTFE
A
Monitor
Stockout0 SET20 / 01 / 1 / 2–0%–
4300049059
SEAT RING,VALVE,DWG.722-9956,FOR TCV-137
B
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4300055914
SEAT RING,VALVE,DWG.171-5300,FOR TCV-776
B
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4100027092
STUDBOLT,5/8INX95MM,B7/2H
A
Monitor
Critical insurance spare6 EA–2 / 60 / 0 / 27reorder ~20 Oct 20380%–
4100077441
BURNER TIP,SIZE RI114,INCOLOY
A
Monitor
Critical insurance spare2 EA–1 / 22 / 2 / 3–0%–
4200008503
CABLE,INSTRUMENT,4PR X 1.5MM2,ARMOURED
A
Reduce
Non-moving21 M–4 / 10don't stock–0%−Rp 1.2M
4100003595
BEARING,BALL,ANGULAR,7219-2Z
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 2–0%–
4100004608
BEARING,BALL,ANGULAR,7211
A
Monitor
Insurance gap0 EA–1 / 20 / 0 / 2–0%–
4100002430
BEARING,ROLLER,CYL,1ROW,NU312 C3
A
Monitor
Insurance gap0 EA–4 / 70 / 0 / 2–0%–
4200000380
TERMINAL,LUG,FORK,8X4MM,CRIMP
B
Monitor
Critical insurance spare17 EA–4 / 70 / 0 / 162reorder ~04 Dec 20300%–
4300042849
VALVE,GOVERNOR,DWG.225-3525,FOR KT-778A
S
Maintain
No stock needed0 ASS–0 / 0don't stock–1%–
4300042930
VALVE,GOVERNOR,DWG.606-6923,FOR KT-778A
S
Maintain
No stock needed0 ASS–0 / 0don't stock–1%–
4300043215
VALVE,GOVERNOR,DWG.588-2317,FOR KT-778A
S
Maintain
No stock needed0 ASS–0 / 0don't stock–1%–
4300043389
VALVE,GOVERNOR,DWG.335-2617,FOR KT-778A
S
Maintain
No stock needed0 ASS–0 / 0don't stock–1%–
4300043423
VALVE,GOVERNOR,DWG.200-1606,FOR KT-778A
S
Maintain
No stock needed0 ASS–0 / 0don't stock–1%–
4300043492
VALVE,GOVERNOR,DWG.570-9507,FOR KT-778A
S
Maintain
No stock needed0 ASS–0 / 0don't stock–1%–
4300043610
VALVE,GOVERNOR,DWG.187-1543,FOR KT-778A
S
Maintain
No stock needed0 ASS–0 / 0don't stock–1%–
4300043925
VALVE,GOVERNOR,DWG.299-1390,FOR KT-778A
S
Maintain
No stock needed0 ASS–0 / 0don't stock–1%–
4300044214
VALVE,GOVERNOR,DWG.119-9374,FOR KT-778A
S
Maintain
No stock needed0 ASS–0 / 0don't stock–1%–
4300044250
VALVE,GOVERNOR,DWG.621-1378,FOR KT-778A
S
Maintain
No stock needed0 ASS–0 / 0don't stock–1%–
4300062129
VALVE,GOVERNOR,DWG.483-9772,FOR KT-875
S
Maintain
No stock needed0 ASS–0 / 0don't stock–1%–
4300031756
SEAT RING,VALVE,DWG.807-8069,FOR LCV-134
B
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4300015472
SEAT RING,VALVE,DWG.539-6818,FOR LCV-157
B
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4300015483
SEAT RING,VALVE,DWG.918-9870,FOR LCV-157
B
Monitor
Insurance gap0 EA–1 / 20 / 0 / 1–0%–
4300070929
SEAT RING,VALVE,DWG.205-2180,FOR LCV-952
B
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4300023841
SEAT RING,VALVE,DWG.835-7867,FOR LCV-375
B
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300023871
SEAT RING,VALVE,DWG.560-8558,FOR LCV-375
B
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300035614
POSITIONER,VALVE,DWG.196-8672,FOR FCV-10
A
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300072498
POSITIONER,VALVE,DWG.212-2403,FOR FCV-17
A
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
← PreviousPage 123 / 150Next →