Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 124 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300041753 POSITIONER,VALVE,DWG.538-5957,FOR FCV-17 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300041763 POSITIONER,VALVE,DWG.769-7133,FOR FCV-17 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300050451 POSITIONER,VALVE,DWG.849-7660,FOR FCV-31 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300042474 POSITIONER,VALVE,DWG.191-9189,FOR FCV-39 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100049567 POSITIONER,VALVE,SIZE NA635,NBR | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300068547 POSITIONER,VALVE,DWG.644-5899,FOR FCV-58 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300027356 POSITIONER,VALVE,DWG.506-8743,FOR FCV-60 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300041081 POSITIONER,VALVE,DWG.611-1853,FOR FCV-64 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300041114 POSITIONER,VALVE,DWG.101-6048,FOR FCV-64 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300063794 POSITIONER,VALVE,DWG.718-7755,FOR FCV-93 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300044340 POSITIONER,VALVE,DWG.936-2226,FOR FCV-19 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100087872 FILTER ELEMENT,AIR INTAKE,5MICRON,P/N FE | S | Maintain | No stock needed | 0 EA | – | 1 / 3 | don't stock | – | 1% | – |
| 4100048804 POSITIONER,VALVE,SIZE AP66,PTFE | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4200006341 LAMP,LED,18W,24VDC,T8 | B | Reduce | Slow-moving | 5 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 1.1M |
| 4300048199 TRIM SET,CONTROL VALVE,DWG.258-4500,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300039360 TRIM SET,CONTROL VALVE,DWG.851-3776,FOR | B | Maintain | No stock needed | 0 SET | – | 10 / 20 | don't stock | – | 0% | – |
| 4300061561 TRIM SET,CONTROL VALVE,DWG.297-9947,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300053805 TRIM SET,CONTROL VALVE,DWG.653-4823,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300008048Safety-criticalLong-lead DISC,SAFETY VALVE,DWG.949-9112,FOR PRV-8 | A | Monitor | Slow-moving | 3 EA | 1 | 1 / 2 | 3 / 3 / 6 | reorder ~22 Jan 2029 | 0% | – |
| 4100016544 GASKET,RING,1-1/2IN,150#,GR/304 | A | Monitor | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 4 | reorder ~26 Jan 2061 | 0% | – |
| 4100040490 CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316 | B | Reduce | Non-moving | 10 EA | – | 10 / 31 | 0 / 0 / 1 | – | 0% | −Rp 1.1M |
| 4200002402 GLAND,CABLE,MODEL JA773,CS | C | Reduce | Potentially obsolete | 6 EA | – | 5 / 9 | don't stock | – | 0% | −Rp 1.1M |
| 4200010447 FAN,COOLING MOTOR,DWG.336-1263,FOR PP-19 | B | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | – |
| 4200010953 FAN,COOLING MOTOR,DWG.890-7015,FOR PP-19 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200010634 FAN,COOLING MOTOR,DWG.333-8857,FOR PP-32 | B | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | – |
| 4200011077 FAN,COOLING MOTOR,DWG.575-3566,FOR PP-41 | B | Monitor | Insurance gap | 0 EA | – | 2 / 6 | 0 / 0 / 2 | – | 0% | – |
| 4200011601 FAN,COOLING MOTOR,DWG.372-4984,FOR PP-77 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200011411 FAN,COOLING MOTOR,DWG.570-1991,FOR PP-84 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4200011598 FAN,COOLING MOTOR,DWG.120-2905,FOR PP-18 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | – |
| 4300065828 TRAY VALVE,DWG.275-7506,FOR CL-816 | A | Reduce | Non-moving | 15 EA | – | 4 / 7 | 1 / 1 / 2 | – | 0% | −Rp 1.1M |
| 4100011852 COUPLING,SIZE KY513,NBR | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300026275 COUPLING,DWG.299-5355,FOR KC-236B | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300025360 COUPLING,DWG.593-2292,FOR KC-373B | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4200000178 TERMINAL,LUG,PIN,5.5X6MM,CRIMP | A | Reduce | Excess | 6,904 EA | – | 2,000 / 3,005 | 976 / 1,187 / 6,380 | – | 0% | −Rp 1.1M |
| 4300038268 TRIM SET,CONTROL VALVE,DWG.658-5747,FOR | C | Monitor | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100017269Safety-critical GASKET,SW,3IN,150#,GR/304 | B | Monitor | Critical insurance spare | 2 EA | – | 1 / 3 | 0 / 0 / 4 | reorder ~08 Jul 2074 | 0% | – |
| 4300040158 SEAL,LABYRINTH,DWG.751-2331,FOR KT-419A | A | Maintain | Critical insurance spare | 1 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4300040264 SEAL,LABYRINTH,DWG.910-1080,FOR KT-419A | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300022475 SEAL,LABYRINTH,DWG.899-7009,FOR KT-856A | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100015417 GASKET,SW,6IN,300#,GRAPHITE | B | Reduce | Non-moving | 9 EA | – | 2 / 6 | 0 / 0 / 4 | – | 0% | −Rp 1.1M |
| 4100018424Safety-criticalSign-off GASKET,SW,4IN,300#,PTFE | B | Reduce | Non-moving | 9 EA | – | 3 / 6 | 0 / 0 / 4 | – | 0% | −Rp 1.1M |
| 4100018248 GASKET,RING,4IN,150#,PTFE | C | Reduce | Potentially obsolete | 5 EA | – | 3 / 6 | don't stock | – | 0% | −Rp 1.1M |
| 4100092728 GREASE,COMPLEX,NLGI 3,180KG | B | Reduce | Non-moving | 6 KG | – | 3 / 10 | don't stock | – | 0% | −Rp 1.1M |
| 4100059301Long-lead TRANSMITTER,TEMP,MODEL HI905,CS | A | Monitor | Slow-moving | 12 EA | 2 | 0 / 0 | 10 / 12 / 15 | – | 0% | – |
| 4100031596 TEE,8IN,SCH40,A105,BW | C | Reduce | Slow-moving | 4 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 1.1M |
| 4100032549 TEE,1IN,SCH40,A234WPB,SW | C | Reduce | Potentially obsolete | 2 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 1.1M |
| 4100032332 TEE,1/4IN,SCH40,A234WPB,BW | C | Reduce | Potentially obsolete | 2 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 1.1M |
| 4100032160 TEE,1/4IN,SCH40,A105,BW | C | Reduce | Slow-moving | 3 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 1.1M |
| 4100032033 TEE,4IN,3000#,A234WPB,SW | C | Reduce | Potentially obsolete | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 1.1M |
| 4300027275 SEAT RING,VALVE,DWG.588-7205,FOR FCV-113 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |