Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 120 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100022545 O-RING,NBR,247MM ID,5.3MM CS | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4100057951 TRANSMITTER,DIFF.PRESS,0~5000MMH2O,HART | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4100063019 THERMOWELL,MODEL ZM352,GRAPHITE | S | Maintain | No stock needed | 0 EA | – | 2 / 6 | don't stock | – | 1% | – |
| 4100093438 TUBE PLUG,EXCHANGER,TYPE GN407,A105 | A | Reduce | Non-moving | 6 EA | – | 4 / 9 | 2 / 2 / 3 | – | 0% | −Rp 1.5M |
| 4100094713 TUBE PLUG,EXCHANGER,SIZE ZO799,SS316 | C | Reduce | Potentially obsolete | 4 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 1.5M |
| 4100015946 GASKET,RING,1-1/2IN,150#,GRAPHITE | A | Reduce | Slow-moving | 12 EA | – | 0 / 0 | 4 / 4 / 6 | – | 0% | −Rp 1.5M |
| 4100017840Safety-criticalSign-off GASKET,SW,12IN,300#,PTFE | A | Reduce | Non-moving | 11 EA | – | 4 / 11 | 0 / 0 / 4 | – | 0% | −Rp 1.5M |
| 4100026834 STUDBOLT,1/2INX105MM,B7/2H | B | Monitor | Critical insurance spare | 5 EA | – | 2 / 3 | 0 / 0 / 27 | reorder ~20 Jan 2033 | 0% | – |
| 4300014305Long-lead COUPLING,DWG.127-2227,FOR PP-615A | B | Monitor | Slow-moving | 4 SET | 1 | 0 / 0 | 1 / 1 / 4 | – | 0% | – |
| 4100025277 STUDBOLT,7/8INX90MM,B7/2H | A | Maintain | Critical insurance spare | 15 EA | – | 10 / 23 | 0 / 0 / 27 | – | 0% | – |
| 4300067361 THERMOWELL,DWG.490-4745,FOR BF-107-DUCT0 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300006393 SEAT RING,VALVE,DWG.287-6196,FOR TCV-178 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100041106 CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316 | A | Reduce | Non-moving | 13 EA | – | 5 / 9 | 0 / 0 / 1 | – | 0% | −Rp 1.5M |
| 4200001752 GLAND,CABLE,SIZE LK857,INCOLOY | C | Reduce | Potentially obsolete | 10 EA | – | 2 / 6 | 0 / 0 / 2 | – | 0% | −Rp 1.5M |
| 4200002794 GLAND,CABLE,MODEL MS625,GRAPHITE | C | Reduce | Potentially obsolete | 8 EA | – | 5 / 15 | don't stock | – | 0% | −Rp 1.5M |
| 4200002377 GLAND,CABLE,TYPE CQ595,SS316 | B | Reduce | Non-moving | 10 EA | – | 5 / 14 | 0 / 0 / 2 | – | 0% | −Rp 1.5M |
| 4100016305 GASKET,RING,1/4IN,150#,PTFE | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4300034982 COUPLING,DWG.950-1648,FOR PP-1282 | B | Monitor | Insurance gap | 0 SET | – | 2 / 6 | 0 / 0 / 1 | – | 0% | – |
| 4300030945 COUPLING,DWG.457-4237,FOR PP-1834B | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300018994 COUPLING,DWG.153-4626,FOR PP-1872B | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300007246 COUPLING,DWG.714-3229,FOR PP-724 | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100020931 O-RING,VITON,219MM ID,3.5MM CS | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 3 | – | 0% | – |
| 4300055166 SEAT RING,VALVE,DWG.100-2200,FOR LCV-552 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300046457 SEAT RING,VALVE,DWG.854-1441,FOR LCV-669 | A | Monitor | Insurance gap | 0 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | – |
| 4300074472 SEAT RING,VALVE,DWG.137-3615,FOR LCV-832 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300074789Long-lead SEAL,LABYRINTH,DWG.782-4118,FOR KC-853D | B | Monitor | Stockout | 0 SET | 2 | 0 / 0 | 1 / 1 / 2 | – | 0% | – |
| 4100092767 GREASE,POLYUREA,NLGI 3,1KG | C | Reduce | Potentially obsolete | 8 KG | – | 5 / 16 | don't stock | – | 0% | −Rp 1.4M |
| 4100092923 GREASE,POLYUREA,NLGI 1,16KG | A | Reduce | Non-moving | 106 KG | – | 2 / 3 | 0 / 0 / 98 | – | 0% | −Rp 1.4M |
| 4200000603 TERMINAL,LUG,RING,8X4MM,CRIMP | B | Monitor | Critical insurance spare | 62 EA | – | 1 / 3 | 0 / 0 / 162 | reorder ~24 Feb 2039 | 0% | – |
| 4100006311 SEAL,MECHANICAL,SIZE XD28,SS316 | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100002005 BEARING,ROLLER,CYL,1ROW,NU318BDB | S | Reduce | Potentially obsolete | 1 EA | – | 1 / 2 | don't stock | – | 3% | −Rp 1.4M |
| 4100002936 BEARING,ROLLER,CYL,1ROW,7211 C3 | B | Reduce | Non-moving | 5 EA | – | 3 / 7 | 2 / 2 / 4 | – | 0% | −Rp 1.4M |
| 4100004898 BEARING,ROLLER,CYL,1ROW,7210-2Z | S | Reduce | Potentially obsolete | 1 EA | – | 1 / 2 | don't stock | – | 1% | −Rp 1.4M |
| 4100001530 BEARING,ROLLER,CYL,1ROW,NU307BDB | A | Reduce | Non-moving | 5 EA | – | 1 / 2 | 2 / 2 / 4 | – | 0% | −Rp 1.4M |
| 4100001863 BEARING,BALL,1ROW,DEEP GROOVE,7218 C3 | A | Reduce | Non-moving | 5 EA | – | 3 / 7 | 2 / 2 / 4 | – | 0% | −Rp 1.4M |
| 4100004138 BEARING,BALL,1ROW,DEEP GROOVE,7213 | B | Reduce | Non-moving | 3 EA | – | 3 / 5 | 0 / 0 / 2 | – | 0% | −Rp 1.4M |
| 4100002137 BEARING,BALL,1ROW,DEEP GROOVE,7213BDB | A | Reduce | Non-moving | 3 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 1.4M |
| 4100004003 BEARING,BALL,1ROW,DEEP GROOVE,NU319 C3 | A | Reduce | Non-moving | 5 EA | – | 2 / 4 | 2 / 2 / 4 | – | 0% | −Rp 1.4M |
| 4100003906 BEARING,ROLLER,CYL,1ROW,6219BDB | A | Reduce | Non-moving | 5 EA | – | 2 / 4 | 2 / 2 / 4 | – | 0% | −Rp 1.4M |
| 4100001028 BEARING,BALL,1ROW,DEEP GROOVE,6215-2Z | B | Reduce | Non-moving | 3 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 1.4M |
| 4100001759 BEARING,BALL,ANGULAR,6211 | B | Reduce | Excess | 3 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 1.4M |
| 4100003935 BEARING,BALL,1ROW,DEEP GROOVE,6213-2Z | A | Reduce | Non-moving | 3 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 1.4M |
| 4100005023 BEARING,BALL,1ROW,DEEP GROOVE,6207BDB | C | Reduce | Slow-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 1.4M |
| 4100002906 BEARING,BALL,1ROW,DEEP GROOVE,NU314 | B | Reduce | Non-moving | 3 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 1.4M |
| 4100072687 FIREBRICK,INSUL,26,65T,114W,230L | S | Reduce | Potentially obsolete | 9 EA | – | 2 / 5 | don't stock | – | 3% | – |
| 4100108015 OIL,LUBRICANT,ISO VG 32,MINERAL,5L | A | Reduce | Non-moving | 20 L | – | 5 / 9 | 0 / 0 / 11 | – | 0% | −Rp 1.4M |
| 4100025334 STUDBOLT,3/4INX95MM,B7/2H | B | Monitor | Critical insurance spare | 1 EA | – | 1 / 2 | 0 / 0 / 27 | reorder ~01 Feb 2028 | 0% | – |
| 4300002768 TRIM SET,CONTROL VALVE,DWG.330-8152,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300055772 TRIM SET,CONTROL VALVE,DWG.742-7346,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300068079 TRIM SET,CONTROL VALVE,DWG.800-2967,FOR | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |