Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 119 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300066241 TRIM SET,CONTROL VALVE,DWG.952-1304,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300072969 TRIM SET,CONTROL VALVE,DWG.662-4645,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100102869 ANTIRUST,SPRAY TYPE,500ML/CAN,TYPE-B | C | Reduce | Potentially obsolete | 23 CAN | – | 10 / 23 | don't stock | – | 0% | −Rp 1.7M |
| 4100005416 SEAL,MECHANICAL,TYPE AM52,A105 | A | Maintain | Critical insurance spare | 1 SET | – | 4 / 11 | 0 / 0 / 1 | – | 0% | – |
| 4300031753 TRIM SET,CONTROL VALVE,DWG.537-7866,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300070889 TRIM SET,CONTROL VALVE,DWG.392-6724,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300061104 TRIM SET,CONTROL VALVE,DWG.917-7056,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300067932 TRIM SET,CONTROL VALVE,DWG.268-5962,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4200002489 GLAND,CABLE,SIZE CL569,INCOLOY | B | Reduce | Non-moving | 11 EA | – | 3 / 5 | 0 / 0 / 2 | – | 0% | −Rp 1.7M |
| 4200001686 GLAND,CABLE,MODEL QM585,MONEL | A | Reduce | Non-moving | 11 EA | – | 4 / 8 | 0 / 0 / 2 | – | 0% | −Rp 1.7M |
| 4200002464 GLAND,CABLE,SIZE WX400,GRAPHITE | C | Reduce | Potentially obsolete | 9 EA | – | 4 / 8 | don't stock | – | 0% | −Rp 1.7M |
| 4100008264 IMPELLER,TYPE OJ579,SS304 | B | Maintain | Critical insurance spare | 1 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100018972 GASKET,RING,10IN,150#,PTFE | S | Maintain | No stock needed | 0 EA | – | 2 / 6 | don't stock | – | 1% | – |
| 4100105417 SCREEN,WIRE,MODEL IB685,PTFE | B | Monitor | Insurance gap | 0 SHT | – | 10 / 29 | 0 / 0 / 2 | – | 0% | – |
| 4100025491 STUDBOLT,5/8INX85MM,B16/4 | A | Maintain | Critical insurance spare | 14 EA | – | 5 / 10 | 0 / 0 / 27 | – | 0% | – |
| 4200005988 LAMP,LED,36W,220VAC,E27 | C | Reduce | Potentially obsolete | 4 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 1.6M |
| 4100021987 O-RING,NBR,40MM ID,2.5MM CS | S | Maintain | No stock needed | 0 EA | – | 2 / 5 | don't stock | – | 1% | – |
| 4100040931 CONNECTOR,MALE,1/4IN ODT,1/2IN NPT,SS316 | C | Reduce | Potentially obsolete | 14 EA | – | 5 / 15 | 0 / 0 / 1 | – | 0% | −Rp 614,265 |
| 4100057408 TRANSMITTER,DIFF.PRESS,0~10000MMH2O,FF | A | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4300042912 VALVE,GOVERNOR,DWG.266-5692,FOR KT-778A | S | Maintain | No stock needed | 0 ASS | – | 0 / 0 | don't stock | – | 1% | – |
| 4100032116 TEE,12IN,SCH80,A234WPB,SW | C | Reduce | Potentially obsolete | 3 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 1.6M |
| 4100048980 POSITIONER,VALVE,MODEL KM21,VITON | B | Monitor | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100021683 O-RING,VITON,10MM ID,2.5MM CS | S | Maintain | Potentially obsolete | 2 EA | – | 1 / 3 | 0 / 0 / 3 | – | 1% | – |
| 4300004695 BLADE,ROTOR,DWG.714-6915,FOR KT-397A | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300004957 BLADE,ROTOR,DWG.867-7219,FOR KT-397A | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100088633 BLADE,ROTOR,TYPE PE474,GRAPHITE | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300023293 BLADE,ROTOR,DWG.540-1442,FOR KT-856A | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300038522 RING,WEAR,DWG.565-6695,FOR PP-123 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300059069 RING,WEAR,DWG.448-7468,FOR PP-1710 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300019033 RING,WEAR,DWG.926-4481,FOR PP-1872B | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300071417 RING,WEAR,DWG.985-6391,FOR PP-301C | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300057894 RING,WEAR,DWG.248-1446,FOR PP-669A | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300009981 RING,WEAR,DWG.373-6700,FOR PP-681B | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100007460 IMPELLER,SIZE TT943,A105 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4100023784Safety-critical O-RING,NBR,49MM ID,5.3MM CS | A | Maintain | Critical insurance spare | 2 EA | – | 1 / 2 | 0 / 0 / 3 | – | 0% | – |
| 4100107983 OIL,LUBRICANT,ISO VG 150,MINERAL,209L | A | Maintain | Critical insurance spare | 9 L | – | 2 / 4 | 0 / 0 / 11 | – | 0% | – |
| 4100108373 OIL,LUBRICANT,ISO VG 32,SYNTHETIC,20L | A | Monitor | Insurance gap | 0 L | – | 10 / 29 | 0 / 0 / 11 | – | 0% | – |
| 4100107579 OIL,LUBRICANT,ISO VG 32,SYNTHETIC,209L | A | Monitor | Critical insurance spare | 3 L | – | 2 / 4 | 0 / 0 / 11 | reorder ~28 Jun 2038 | 0% | – |
| 4300021515 TRIM SET,CONTROL VALVE,DWG.397-2668,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300024009 TRIM SET,CONTROL VALVE,DWG.223-1221,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300065060 TRIM SET,CONTROL VALVE,DWG.991-5818,FOR | B | Maintain | No stock needed | 0 SET | – | 1 / 3 | don't stock | – | 0% | – |
| 4300037736 TRIM SET,CONTROL VALVE,DWG.197-5356,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300047632 TRIM SET,CONTROL VALVE,DWG.894-8924,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300054586 TRIM SET,CONTROL VALVE,DWG.877-1219,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300037840 TRIM SET,CONTROL VALVE,DWG.694-3074,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100044039 TRIM SET,CONTROL VALVE,MODEL XB963,GRAPH | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300009344 TRIM SET,CONTROL VALVE,DWG.965-3032,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300008625 TRIM SET,CONTROL VALVE,DWG.897-8417,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300060404 TRIM SET,CONTROL VALVE,DWG.332-8167,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100024028 O-RING,VITON,94MM ID,5.3MM CS | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |