Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 118 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100023694Safety-criticalSign-off O-RING,NBR,56MM ID,5.3MM CS | B | Reduce | Non-moving | 50 EA | – | 0 / 0 | 0 / 0 / 3 | – | 0% | −Rp 1.9M |
| 4100017392 GASKET,SW,6IN,600#,PTFE | A | Monitor | Critical insurance spare | 2 EA | – | 1 / 3 | 0 / 0 / 4 | reorder ~22 Oct 2054 | 0% | – |
| 4100009275 SLEEVE,SHAFT,MODEL LS90,A105 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4300035359 SLEEVE,SHAFT,DWG.542-7123,FOR PP-1570A | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4100033986 FLANGE,WN,4IN,150#,A105,RF | A | Reduce | Non-moving | 7 EA | – | 2 / 5 | 0 / 0 / 5 | – | 0% | −Rp 1.9M |
| 4100033321 FLANGE,SO,1-1/2IN,300#,A105,RF | C | Reduce | Potentially obsolete | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 1.9M |
| 4100041045 CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316 | B | Reduce | Non-moving | 16 EA | – | 5 / 12 | 0 / 0 / 1 | – | 0% | −Rp 1.8M |
| 4100044562 TRIM SET,CONTROL VALVE,MODEL XE200,A182F | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300027988 COUPLING,DWG.376-2508,FOR PP-1049 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300012717 COUPLING,DWG.796-9392,FOR PP-1099 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300058867 COUPLING,DWG.886-3985,FOR PP-1801A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300007680 COUPLING,DWG.155-6503,FOR PP-1821 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300061018 COUPLING,DWG.546-3641,FOR PP-1945D | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300035112 COUPLING,DWG.771-5115,FOR PP-1977 | A | Monitor | Insurance gap | 0 SET | – | 3 / 5 | 0 / 0 / 1 | – | 0% | – |
| 4300049074 COUPLING,DWG.962-7468,FOR PP-246C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100011566 COUPLING,MODEL CZ835,CS | A | Monitor | Insurance gap | 0 SET | – | 4 / 13 | 0 / 0 / 1 | – | 0% | – |
| 4300050386 COUPLING,DWG.134-1992,FOR PP-489A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300065447 COUPLING,DWG.105-4857,FOR PP-645C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300065486 COUPLING,DWG.667-9496,FOR PP-645C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100020106 O-RING,VITON,199MM ID,5.3MM CS | A | Maintain | Critical insurance spare | 2 EA | – | 0 / 0 | 0 / 0 / 3 | – | 0% | – |
| 4100021448 O-RING,VITON,297MM ID,3.5MM CS | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 3 | – | 0% | – |
| 4300041295 POSITIONER,VALVE,DWG.201-5146,FOR PCV-24 | C | Maintain | Healthy | 1 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4100015203 GASKET,SHEET,12IN,300#,PTFE | B | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 4 | – | 0% | – |
| 4100098053 DEMISTER PAD,MODEL SB631,A105 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4300056835 COUPLING,DWG.133-1619,FOR KC-856A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4100084751Long-lead SEAL,LABYRINTH,TYPE BG775,A182F11 | A | Maintain | Insurance gap | 0 SET | 2 | 0 / 0 | 1 / 1 / 2 | – | 0% | – |
| 4200008924 CABLE,INSTRUMENT,2PR X 0.75MM2,ARMOURED | B | Monitor | Critical insurance spare | 2 M | – | 0 / 0 | 0 / 0 / 50 | reorder ~26 Dec 2028 | 0% | – |
| 4100038706 VALVE,NEEDLE,1/4IN NPT,6000PSI,SS316 | C | Reduce | Potentially obsolete | 3 EA | – | 1 / 2 | don't stock | – | 0% | – |
| 4100030349 ELBOW,45DEG,6IN,SCH40,A105,BW | C | Reduce | Potentially obsolete | 8 EA | – | 2 / 6 | don't stock | – | 0% | −Rp 1.8M |
| 4100102194 ANTIRUST,SPRAY TYPE,400ML/CAN,TYPE-B | C | Reduce | Potentially obsolete | 24 CAN | – | 4 / 12 | don't stock | – | 0% | −Rp 1.8M |
| 4300058226 THERMOWELL,DWG.409-3668,FOR BF-101-QF04 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300041936 IMPELLER,DWG.934-4512,FOR PP-1404A | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300072388 IMPELLER,DWG.420-5451,FOR PP-1546A | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300034128 IMPELLER,DWG.377-2707,FOR PP-1706A | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300034131 IMPELLER,DWG.289-6421,FOR PP-1706A | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300049309 IMPELLER,DWG.951-9847,FOR PP-1758A | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300012639 IMPELLER,DWG.293-9927,FOR PP-376 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4200004973 LAMP,LED,9W,24VDC,T8 | A | Monitor | Critical insurance spare | 1 EA | – | 0 / 0 | 0 / 0 / 2 | reorder ~21 Sept 2075 | 0% | – |
| 4100041705 CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316 | A | Reduce | Non-moving | 15 EA | – | 4 / 9 | 0 / 0 / 1 | – | 0% | −Rp 1.7M |
| 4100042474 TUBING,MODEL DM748,GRAPHITE | B | Reduce | Non-moving | 5 M | – | 5 / 10 | don't stock | – | 0% | −Rp 1.7M |
| 4100043058 TUBING,SIZE DY124,GRAPHITE | A | Reduce | Non-moving | 5 M | – | 2 / 6 | don't stock | – | 0% | −Rp 1.7M |
| 4100042198 TUBING,TYPE LS221,INCOLOY | S | Reduce | Potentially obsolete | 5 M | – | 1 / 2 | don't stock | – | 0% | −Rp 1.7M |
| 4100018297 GASKET,SHEET,3IN,600#,GR/304 | C | Reduce | Potentially obsolete | 12 EA | – | 0 / 0 | 0 / 0 / 4 | – | 0% | −Rp 1.7M |
| 4100015790 GASKET,SW,3/4IN,150#,PTFE | S | Reduce | Non-moving | 8 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 1.7M |
| 4100017377 GASKET,SW,2IN,300#,PTFE | B | Reduce | Slow-moving | 22 EA | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 1.7M |
| 4100028884 PIPE,1IN,SCH160,SS316,SMLS,6M LG | B | Reduce | Non-moving | 4 LG | – | 3 / 7 | 0 / 0 / 3 | – | 0% | −Rp 1.7M |
| 4300028310 TRIM SET,CONTROL VALVE,DWG.234-8734,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300036156 TRIM SET,CONTROL VALVE,DWG.732-8107,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300052992 TRIM SET,CONTROL VALVE,DWG.722-9848,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300040993 TRIM SET,CONTROL VALVE,DWG.442-4125,FOR | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |