Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,848 spare parts
Order value Rp 0 · excess value Rp 3.41T · page 10 of 37
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100080868 BEARING,JOURNAL,SIZE IQ380,A182F11 | A | Reduce | Non-moving | 5 SET | – | 4 / 9 | 1 / 1 / 2 | – | 0% | −Rp 657.8M |
| 4100081563 BEARING,JOURNAL,TYPE CP644,A182F11 | A | Reduce | Non-moving | 4 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 657.8M |
| 4300002196 BEARING,THRUST PAD,DWG.132-8724,FOR KC-3 | A | Reduce | Non-moving | 4 SET | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 657.8M |
| 4300008179 BEARING,JOURNAL,DWG.351-6328,FOR KC-476C | A | Reduce | Non-moving | 3 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 657.8M |
| 4300007884 BEARING,JOURNAL,DWG.140-3438,FOR KC-527 | A | Reduce | Non-moving | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 657.8M |
| 4300074855 BEARING,JOURNAL,DWG.744-8618,FOR KC-853D | B | Reduce | Non-moving | 3 SET | – | 2 / 3 | don't stock | – | 0% | −Rp 657.8M |
| 4300017019 BEARING,JOURNAL,DWG.304-7909,FOR KT-264A | S | Reduce | Non-moving | 3 SET | – | 3 / 4 | don't stock | – | 0% | −Rp 657.8M |
| 4300017436 BEARING,JOURNAL,DWG.107-9828,FOR KT-264A | S | Reduce | Non-moving | 3 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 657.8M |
| 4300004609 BEARING,THRUST PAD,DWG.636-7133,FOR KT-3 | A | Reduce | Non-moving | 4 SET | – | 4 / 7 | 0 / 0 / 1 | – | 0% | −Rp 657.8M |
| 4300040620 BEARING,THRUST PAD,DWG.729-1447,FOR KT-4 | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 657.8M |
| 4300004987 BEARING,JOURNAL,DWG.584-3092,FOR KT-460B | A | Reduce | Non-moving | 4 SET | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 657.8M |
| 4300005659 BEARING,JOURNAL,DWG.820-6645,FOR KT-460B | A | Reduce | Non-moving | 4 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 657.8M |
| 4100082386 BEARING,JOURNAL,SIZE EC354,SS316 | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 657.8M |
| 4300023408 BEARING,THRUST PAD,DWG.837-8192,FOR KT-8 | A | Reduce | Non-moving | 4 SET | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 657.8M |
| 4300006835 COUPLING,DWG.199-8146,FOR KC-536A | A | Reduce | Non-moving | 78 SET | – | 2 / 6 | 1 / 1 / 2 | – | 0% | −Rp 650.2M |
| 4100060024 TRANSMITTER,TEMP,SIZE WT761,GRAPHITE | A | Reduce | Non-moving | 20 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 648.7M |
| 4300059223 POSITIONER,VALVE,DWG.229-3834,FOR FCV-88 | A | Reduce | Non-moving | 16 EA | – | 5 / 11 | don't stock | – | 0% | −Rp 638.7M |
| 4300031830 DEMISTER PAD,DWG.796-5624,FOR CL-1839 | A | Reduce | Non-moving | 42 EA | – | 10 / 17 | 0 / 0 / 1 | – | 0% | −Rp 632.4M |
| 4300038234 TRIM SET,CONTROL VALVE,DWG.362-5167,FOR | A | Reduce | Non-moving | 11 SET | – | 5 / 16 | 2 / 2 / 3 | – | 0% | −Rp 627.9M |
| 4300070908 TRIM SET,CONTROL VALVE,DWG.877-1612,FOR | B | Reduce | Non-moving | 8 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 627.9M |
| 4100087072 FILTER ELEMENT,LUBE OIL,5MICRON,P/N FE-9 | A | Reduce | Non-moving | 228 EA | – | 3 / 7 | 0 / 0 / 2 | – | 0% | −Rp 626.5M |
| 4100066320Safety-criticalSign-off SPRING,SAFETY VALVE,SIZE AG927,GRAPHITE | S | Reduce | Non-moving | 72 EA | – | 10 / 30 | 0 / 0 / 1 | – | 0% | −Rp 626.1M |
| 4100078730 BURNER TIP,TYPE MA839,VITON | B | Reduce | Non-moving | 41 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 619.7M |
| 4100056056 TRANSMITTER,PRESS,SIZE KW13,SS304 | A | Reduce | Non-moving | 18 EA | – | 3 / 9 | don't stock | – | 0% | −Rp 614.5M |
| 4300057437 IMPELLER,DWG.443-7863,FOR PP-1161 | A | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 612.6M |
| 4300044908 IMPELLER,DWG.227-1492,FOR PP-1543 | B | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 612.6M |
| 4300049955 IMPELLER,DWG.626-3600,FOR PP-1905A | B | Reduce | Non-moving | 7 EA | – | 3 / 9 | 0 / 0 / 1 | – | 0% | −Rp 612.6M |
| 4300039445 IMPELLER,DWG.199-2636,FOR PP-306A | B | Reduce | Non-moving | 6 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 612.6M |
| 4300074467 IMPELLER,DWG.530-3537,FOR PP-992B | B | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 612.6M |
| 4300073118 IMPELLER,DWG.384-7377,FOR PP-1056 | A | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 612.6M |
| 4300038029 IMPELLER,DWG.814-4093,FOR PP-1131 | B | Reduce | Non-moving | 6 EA | – | 4 / 12 | don't stock | – | 0% | −Rp 612.6M |
| 4300053100Long-lead IMPELLER,DWG.257-2714,FOR PP-1434 | B | Reduce | Non-moving | 15 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 603.5M |
| 4100035493 VALVE,GATE,1-1/2IN,150#,A105,SW | A | Reduce | Non-moving | 232 EA | – | 4 / 6 | 2 / 2 / 4 | – | 0% | −Rp 599.3M |
| 4100048612 POSITIONER,VALVE,SIZE AR822,A105 | A | Reduce | Non-moving | 16 EA | – | 5 / 11 | 0 / 0 / 1 | – | 0% | −Rp 598.8M |
| 4300019801 COUPLING,DWG.374-2467,FOR PP-387 | A | Reduce | Non-moving | 70 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 590.3M |
| 4300014598Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.240-3259,FOR PRV | B | Reduce | Non-moving | 67 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 582.0M |
| 4300056599 SEAL,LABYRINTH,DWG.870-2504,FOR KC-464A | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 567.5M |
| 4300003839 SEAL,LABYRINTH,DWG.147-6730,FOR KT-397A | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 567.5M |
| 4300040940 SEAL,LABYRINTH,DWG.685-9200,FOR KT-419A | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 567.5M |
| 4300006065 SEAL,LABYRINTH,DWG.580-2273,FOR KT-460B | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 567.5M |
| 4300069371 SEAL,LABYRINTH,DWG.974-7615,FOR KT-513 | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 567.5M |
| 4300036686 SLEEVE,SHAFT,DWG.503-9175,FOR PP-1407B | S | Reduce | Non-moving | 70 EA | – | 10 / 31 | don't stock | – | 0% | −Rp 566.1M |
| 4300024108 TRIM SET,CONTROL VALVE,DWG.503-8509,FOR | B | Reduce | Non-moving | 7 SET | – | 3 / 7 | don't stock | – | 0% | −Rp 549.4M |
| 4300037772 TRIM SET,CONTROL VALVE,DWG.331-8170,FOR | A | Reduce | Non-moving | 7 SET | – | 5 / 9 | don't stock | – | 0% | −Rp 549.4M |
| 4300041127 TRIM SET,CONTROL VALVE,DWG.249-6032,FOR | B | Reduce | Non-moving | 7 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 549.4M |
| 4100048126 DIAPHRAGM,ACTUATOR,SIZE GT341,GRAPHITE | A | Reduce | Non-moving | 126 EA | – | 4 / 9 | 0 / 0 / 1 | – | 0% | −Rp 548.0M |
| 4300068526Safety-criticalSign-off DISC,SAFETY VALVE,DWG.712-9227,FOR PRV-1 | A | Reduce | Non-moving | 44 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 539.3M |
| 4300037347Safety-criticalSign-off DISC,SAFETY VALVE,DWG.751-7084,FOR PRV-1 | S | Reduce | Non-moving | 44 EA | – | 10 / 25 | 0 / 0 / 1 | – | 0% | −Rp 539.3M |
| 4300071254Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.561-9410,FOR PRV | S | Reduce | Non-moving | 27 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 527.2M |
| 4100077611 BURNER TIP,MODEL XL135,SS304 | A | Reduce | Non-moving | 37 EA | – | 5 / 16 | 2 / 2 / 3 | – | 0% | −Rp 526.7M |