Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,848 spare parts
Order value Rp 0 · excess value Rp 3.41T · page 7 of 37
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300056625Sign-off BEARING,THRUST PAD,DWG.217-5661,FOR KC-4 | A | Reduce | Non-moving | 7 SET | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300006955Sign-off BEARING,JOURNAL,DWG.110-2159,FOR KC-536A | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300006566Sign-off BEARING,THRUST PAD,DWG.830-4426,FOR KC-6 | A | Reduce | Non-moving | 6 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 1.3B |
| 4300068129Sign-off BEARING,THRUST PAD,DWG.286-7188,FOR KC-7 | A | Reduce | Non-moving | 7 SET | – | 4 / 7 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300044563Sign-off BEARING,JOURNAL,DWG.459-6496,FOR KC-752A | A | Reduce | Non-moving | 7 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300017845Sign-off BEARING,JOURNAL,DWG.885-8191,FOR KT-264A | S | Reduce | Non-moving | 6 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4300013133Sign-off BEARING,THRUST PAD,DWG.534-8702,FOR KT-3 | A | Reduce | Non-moving | 7 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300003349Sign-off BEARING,THRUST PAD,DWG.424-7639,FOR KT-3 | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300004763Sign-off BEARING,JOURNAL,DWG.739-4923,FOR KT-397A | A | Reduce | Non-moving | 7 SET | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300040185Sign-off BEARING,JOURNAL,DWG.958-8638,FOR KT-419A | A | Reduce | Non-moving | 7 SET | – | 5 / 8 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300022638Sign-off BEARING,JOURNAL,DWG.761-8071,FOR KT-856A | A | Reduce | Non-moving | 7 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.3B |
| 4300064530Sign-off TRIM SET,CONTROL VALVE,DWG.569-8706,FOR | C | Reduce | Non-moving | 16 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4300065098Sign-off TRIM SET,CONTROL VALVE,DWG.962-8139,FOR | B | Reduce | Non-moving | 16 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4300064696Sign-off TRIM SET,CONTROL VALVE,DWG.874-7438,FOR | B | Reduce | Non-moving | 16 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.3B |
| 4100084699Sign-off SEAL,LABYRINTH,TYPE NE801,NBR | A | Reduce | Non-moving | 14 SET | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 1.2B |
| 4100005796Sign-off SEAL,MECHANICAL,TYPE NA301,MONEL | A | Reduce | Non-moving | 14 SET | – | 5 / 15 | 0 / 0 / 1 | – | 0% | −Rp 1.2B |
| 4100008297Sign-off IMPELLER,MODEL PQ202,CS | B | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.2B |
| 4300053182Sign-off IMPELLER,DWG.960-2282,FOR PP-1575A | A | Reduce | Non-moving | 13 EA | – | 5 / 11 | 0 / 0 / 1 | – | 0% | −Rp 1.2B |
| 4300025819Sign-off POSITIONER,VALVE,DWG.786-7928,FOR PCV-82 | A | Reduce | Non-moving | 30 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 1.2B |
| 4100054572Safety-criticalSign-off SWITCH,LIMIT,SIZE DO863,NBR | S | Reduce | Non-moving | 201 EA | – | 2 / 5 | 0 / 0 / 2 | – | 0% | −Rp 1.2B |
| 4100052068Safety-criticalSign-off SOLENOID VALVE,MODEL GH207,GRAPHITE | A | Reduce | Non-moving | 107 EA | – | 3 / 10 | 1 / 1 / 2 | – | 0% | −Rp 1.2B |
| 4300063819Sign-off COUPLING,DWG.651-9333,FOR PP-1269A | A | Reduce | Non-moving | 139 SET | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 1.2B |
| 4300008898Sign-off TRIM SET,CONTROL VALVE,DWG.855-1910,FOR | B | Reduce | Non-moving | 15 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.2B |
| 4100044829Sign-off TRIM SET,CONTROL VALVE,SIZE ZO48,A105 | A | Reduce | Non-moving | 16 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.2B |
| 4300013389Sign-off BLADE,ROTOR,DWG.744-9022,FOR KT-308B | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300069428Sign-off BLADE,ROTOR,DWG.415-2527,FOR KT-513 | A | Reduce | Non-moving | 4 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300042119Sign-off SEAL,LABYRINTH,DWG.399-2779,FOR KC-801 | A | Reduce | Non-moving | 13 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4100085875Sign-off SEAL,LABYRINTH,TYPE JP581,A105 | A | Reduce | Non-moving | 13 SET | – | 10 / 30 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300069765Sign-off SEAL,LABYRINTH,DWG.960-4309,FOR KT-513 | A | Reduce | Non-moving | 13 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4100054029Safety-criticalSign-off SWITCH,LIMIT,MODEL FP829,SS316 | A | Reduce | Non-moving | 192 EA | – | 4 / 7 | 0 / 0 / 2 | – | 0% | −Rp 1.1B |
| 4100060032Sign-off TRANSMITTER,TEMP,TYPE XW845,MONEL | A | Reduce | Non-moving | 34 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300035206Sign-off IMPELLER,DWG.471-5834,FOR PP-508D | A | Reduce | Non-moving | 11 EA | – | 10 / 29 | don't stock | – | 0% | −Rp 1.1B |
| 4300065290Sign-off IMPELLER,DWG.747-8400,FOR PP-805B | B | Reduce | Non-moving | 12 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300058257Sign-off IMPELLER,DWG.903-8672,FOR PP-900A | A | Reduce | Non-moving | 12 EA | – | 5 / 14 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4100078533Sign-off BURNER TIP,MODEL PU160,A105 | A | Reduce | Non-moving | 75 EA | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 1.1B |
| 4300008904Sign-off SEAT RING,VALVE,DWG.314-9080,FOR FCV-127 | A | Reduce | Non-moving | 99 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300047690Sign-off SEAT RING,VALVE,DWG.481-6913,FOR PCV-629 | A | Reduce | Non-moving | 99 EA | – | 5 / 7 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300053200Sign-off TRIM SET,CONTROL VALVE,DWG.811-3912,FOR | B | Reduce | Non-moving | 14 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 1.1B |
| 4300052411Sign-off TRIM SET,CONTROL VALVE,DWG.585-2014,FOR | B | Reduce | Non-moving | 14 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.1B |
| 4300044768Sign-off BEARING,THRUST PAD,DWG.361-6679,FOR KC-2 | B | Reduce | Non-moving | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.1B |
| 4300074594Sign-off BEARING,JOURNAL,DWG.436-7360,FOR KC-226 | A | Reduce | Non-moving | 6 SET | – | 4 / 6 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300057594Sign-off BEARING,THRUST PAD,DWG.918-5139,FOR KC-2 | A | Reduce | Non-moving | 5 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 1.1B |
| 4300025922Sign-off BEARING,JOURNAL,DWG.781-5184,FOR KC-247A | A | Reduce | Non-moving | 6 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4100083032Sign-off BEARING,THRUST PAD,MODEL SR125,INCOLOY | A | Reduce | Non-moving | 6 SET | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300015606Sign-off BEARING,THRUST PAD,DWG.892-1703,FOR KC-3 | A | Reduce | Non-moving | 6 SET | – | 5 / 7 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4300006468Sign-off BEARING,JOURNAL,DWG.542-8351,FOR KC-663A | A | Reduce | Non-moving | 5 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 1.1B |
| 4300068131Sign-off BEARING,THRUST PAD,DWG.719-7945,FOR KC-7 | A | Reduce | Non-moving | 6 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 1.1B |
| 4100083025Sign-off BEARING,THRUST PAD,TYPE LV546,GRAPHITE | A | Reduce | Non-moving | 5 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 1.1B |
| 4300017263Sign-off BEARING,THRUST PAD,DWG.353-5963,FOR KT-2 | S | Reduce | Non-moving | 5 SET | – | 4 / 7 | don't stock | – | 0% | −Rp 1.1B |
| 4300017883Sign-off BEARING,JOURNAL,DWG.341-2760,FOR KT-264A | S | Reduce | Non-moving | 5 SET | – | 5 / 10 | don't stock | – | 0% | −Rp 1.1B |