Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 127 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300068306 TRIM SET,CONTROL VALVE,DWG.754-3938,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300041308 TRIM SET,CONTROL VALVE,DWG.898-9905,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300050053 TRIM SET,CONTROL VALVE,DWG.697-7210,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300021495 TRIM SET,CONTROL VALVE,DWG.499-7120,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300058020 TRIM SET,CONTROL VALVE,DWG.877-1527,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300027310 TRIM SET,CONTROL VALVE,DWG.123-3360,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300026458 TRIM SET,CONTROL VALVE,DWG.105-8409,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300065384 TRIM SET,CONTROL VALVE,DWG.700-3077,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300057223 TRIM SET,CONTROL VALVE,DWG.217-8638,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100017454 GASKET,SW,3IN,600#,GRAPHITE | A | Reduce | Non-moving | 8 EA | – | 5 / 11 | 0 / 0 / 4 | – | 0% | −Rp 857,815 |
| 4100016752 GASKET,SW,1IN,150#,GRAPHITE | A | Reduce | Non-moving | 15 EA | – | 4 / 13 | 7 / 7 / 11 | – | 0% | −Rp 857,815 |
| 4100019241Safety-criticalSign-off GASKET,SW,1/4IN,150#,GRAPHITE | A | Reduce | Non-moving | 8 EA | – | 4 / 6 | 0 / 0 / 4 | – | 0% | −Rp 857,815 |
| 4100017730 GASKET,SHEET,6IN,150#,GRAPHITE | S | Reduce | Non-moving | 4 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 857,815 |
| 4100018193 GASKET,RING,3IN,300#,GR/304 | B | Reduce | Non-moving | 8 EA | – | 2 / 5 | 0 / 0 / 4 | – | 0% | −Rp 857,815 |
| 4100095076 TRAY VALVE,TYPE US232,CS | B | Reduce | Non-moving | 12 EA | – | 3 / 8 | 1 / 1 / 2 | – | 0% | −Rp 845,248 |
| 4100034176 FLANGE,BLIND,3/4IN,300#,SS316,RF | B | Monitor | Critical insurance spare | 2 EA | – | 1 / 2 | 0 / 0 / 5 | reorder ~25 Aug 2078 | 0% | – |
| 4100105455 SCREEN,WIRE,SIZE ZE204,SS304 | B | Reduce | Non-moving | 4 SHT | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 843,068 |
| 4100105363 SCREEN,WIRE,SIZE LT837,SS304 | A | Monitor | Critical insurance spare | 1 SHT | – | 0 / 0 | 0 / 0 / 2 | reorder ~25 Nov 2130 | 0% | – |
| 4300036180 POSITIONER,VALVE,DWG.963-9135,FOR PCV-14 | A | Maintain | No stock needed | 0 EA | – | 1 / 2 | don't stock | – | 0% | – |
| 4300063729 POSITIONER,VALVE,DWG.563-6966,FOR PCV-17 | A | Maintain | No stock needed | 0 EA | – | 4 / 9 | don't stock | – | 0% | – |
| 4300072090 POSITIONER,VALVE,DWG.399-3412,FOR PCV-17 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300072798 POSITIONER,VALVE,DWG.628-7338,FOR PCV-38 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300046808 POSITIONER,VALVE,DWG.947-7904,FOR PCV-57 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300019581 POSITIONER,VALVE,DWG.866-7967,FOR PCV-60 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300019646 POSITIONER,VALVE,DWG.166-9712,FOR PCV-60 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300047691 POSITIONER,VALVE,DWG.341-9569,FOR PCV-62 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300019244 POSITIONER,VALVE,DWG.706-1035,FOR PCV-80 | A | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300008848 DEMISTER PAD,DWG.231-5912,FOR CL-1626 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300015034 DEMISTER PAD,DWG.445-2425,FOR CL-682 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100057398 TRANSMITTER,DIFF.PRESS,0~2500MMH2O,FF | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100025701 STUDBOLT,1/2INX50MM,B16/4 | A | Reduce | Slow-moving | 105 EA | – | 24 / 67 | 46 / 48 / 83 | – | 0% | −Rp 831,754 |
| 4300007055 COUPLING,DWG.481-6686,FOR PP-1141D | C | Maintain | No stock needed | 0 SET | – | 10 / 21 | don't stock | – | 0% | – |
| 4300057105 COUPLING,DWG.199-7304,FOR PP-367A | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4300012678 COUPLING,DWG.211-8479,FOR PP-376 | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4200002939 TERMINAL BLOCK,SIZE KF407,CS | B | Reduce | Slow-moving | 13 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 815,016 |
| 4200003342 TERMINAL BLOCK,SIZE AH125,SS304 | C | Reduce | Potentially obsolete | 12 EA | – | 5 / 15 | don't stock | – | 0% | −Rp 815,016 |
| 4200003202 TERMINAL BLOCK,MODEL RJ175,NBR | C | Reduce | Potentially obsolete | 12 EA | – | 10 / 15 | don't stock | – | 0% | −Rp 815,016 |
| 4300044689 SEAL,LABYRINTH,DWG.187-7423,FOR KC-225D | B | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100102436 ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-A | C | Reduce | Potentially obsolete | 11 CAN | – | 5 / 13 | don't stock | – | 0% | −Rp 802,896 |
| 4100021030 O-RING,NBR,268MM ID,5.3MM CS | A | Reduce | Non-moving | 26 EA | – | 5 / 11 | 3 / 3 / 6 | – | 0% | −Rp 793,680 |
| 4100024151 O-RING,NBR,38MM ID,3.5MM CS | A | Reduce | Non-moving | 26 EA | – | 10 / 28 | 3 / 3 / 6 | – | 0% | −Rp 793,680 |
| 4100047362 DIAPHRAGM,ACTUATOR,TYPE KC454,VITON | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300024856 SEAT RING,VALVE,DWG.463-2345,FOR PCV-101 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300070861 SEAT RING,VALVE,DWG.859-6603,FOR PCV-153 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300072583 SEAT RING,VALVE,DWG.525-2018,FOR PCV-155 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300023895 SEAT RING,VALVE,DWG.611-3271,FOR PCV-318 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300057337 SEAT RING,VALVE,DWG.772-8134,FOR PCV-389 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300037180 IMPELLER,DWG.642-8781,FOR PP-111C | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300037216 IMPELLER,DWG.294-4849,FOR PP-111C | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100007411 IMPELLER,TYPE YV987,VITON | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |