Sparely
DU

Material List

One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.

Clear filters

7,481 spare parts

Order value Rp 123.8B · excess value Rp 5.62T · page 128 of 150

PartCrit.ActionHealthStockOn orderToday Min / MaxRec. SS / Min / MaxOrderStockout riskValue
4300018574
TRIM SET,CONTROL VALVE,DWG.453-8829,FOR
C
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4100026492
STUDBOLT,5/8INX40MM,B7/2H
A
Monitor
Critical insurance spare3 EA–1 / 20 / 0 / 27reorder ~30 Dec 20350%–
4100014252Safety-criticalSign-off
GASKET,RING,1IN,300#,PTFE
A
Reduce
Excess41 EA–9 / 1810 / 12 / 35–0%−Rp 760,809
4100017510
GASKET,SW,1-1/2IN,600#,GRAPHITE
A
Monitor
Insurance gap0 EA–3 / 50 / 0 / 4–0%–
4100048956
POSITIONER,VALVE,SIZE ZX672,SS316
A
Maintain
Healthy4 EA–3 / 42 / 2 / 4–0%–
4100028442
PIPE,1IN,SCH40,SS316,SMLS,6M LG
A
Monitor
Insurance gap0 LG–1 / 30 / 0 / 3–0%–
4100029044
PIPE,2IN,SCH80,SS316,SMLS,6M LG
A
Monitor
Critical insurance spare1 LG–1 / 20 / 0 / 3reorder ~20 Feb 20620%–
4100029627
PIPE,3/4IN,SCH80,P11,SMLS,6M LG
A
Monitor
Insurance gap0 LG–2 / 60 / 0 / 3–0%–
4100028300
PIPE,6IN,STD,SS316,SMLS,6M LG
A
Monitor
Critical insurance spare1 LG–4 / 120 / 0 / 3reorder ~20 Feb 20620%–
4100059725
TRANSMITTER,TEMP,MODEL UP228,VITON
A
Maintain
Critical insurance spare1 EA–1 / 20 / 0 / 1–0%–
4300016027Long-lead
DEMISTER PAD,DWG.904-5950,FOR VD-1642
A
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4100041066
CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316
C
Reduce
Potentially obsolete7 EA–2 / 30 / 0 / 1–0%–
4100040598
CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316
C
Reduce
Potentially obsolete6 EA–4 / 12don't stock–0%−Rp 737,118
4100041468
CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316
C
Reduce
Potentially obsolete6 EA–4 / 12don't stock–0%−Rp 737,118
4200002081
GLAND,CABLE,SIZE HU47,INCOLOY
C
Reduce
Potentially obsolete6 EA–2 / 30 / 0 / 2–0%−Rp 735,660
4200001865
GLAND,CABLE,TYPE EQ374,CS
A
Reduce
Non-moving6 EA–1 / 30 / 0 / 2–0%−Rp 735,660
4200002723
GLAND,CABLE,SIZE WU898,SS304
A
Monitor
Critical insurance spare1 EA–2 / 40 / 0 / 2reorder ~27 Jul 21230%–
4100017898
GASKET,SW,1-1/2IN,300#,GRAPHITE
A
Monitor
Slow-moving3 EA–1 / 22 / 2 / 4reorder ~12 Feb 20280%–
4300035027Long-lead
POSITIONER,VALVE,DWG.639-3208,FOR PCV-11
A
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4100048412
DIAPHRAGM,ACTUATOR,SIZE KS997,CS
C
Maintain
No stock needed0 EA–1 / 2don't stock–0%–
4100048184
DIAPHRAGM,ACTUATOR,SIZE ZY90,INCOLOY
C
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4100025409
STUDBOLT,1/2INX35MM,B16/4
C
Reduce
Potentially obsolete19 EA–1 / 2don't stock–0%−Rp 718,333
4300015798
SEAL,LABYRINTH,DWG.797-2226,FOR KC-854C
A
Maintain
Critical insurance spare1 SET–1 / 20 / 0 / 1–0%–
4100092017
GREASE,COMPLEX,NLGI 1,1KG
S
Reduce
Potentially obsolete4 KG–2 / 5don't stock–0%−Rp 713,961
4100081183
BEARING,JOURNAL,SIZE AQ268,SS316
A
Maintain
Critical insurance spare1 SET–0 / 00 / 0 / 1–0%–
4200001171
TERMINAL,LUG,RING,8X4MM,CRIMP
B
Monitor
Critical insurance spare9 EA–5 / 100 / 0 / 162reorder ~13 May 20300%–
4100022353
O-RING,VITON,206MM ID,3.5MM CS
S
Monitor
Potentially obsolete1 EA–1 / 20 / 0 / 3reorder ~22 Feb 20340%–
4300042238
BEARING,JOURNAL,DWG.689-5149,FOR KC-210D
S
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4300042271
BEARING,JOURNAL,DWG.218-2861,FOR KC-210D
S
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4300042289
BEARING,THRUST PAD,DWG.859-3478,FOR KC-2
S
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4300042326
BEARING,JOURNAL,DWG.692-7683,FOR KC-210D
S
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4300042358
BEARING,JOURNAL,DWG.257-9275,FOR KC-210D
S
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4300030653
BEARING,THRUST PAD,DWG.684-5404,FOR KC-2
S
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4300030737
BEARING,JOURNAL,DWG.207-1094,FOR KC-216B
S
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4300026285
BEARING,THRUST PAD,DWG.419-1768,FOR KC-2
S
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4300026343
BEARING,THRUST PAD,DWG.934-1510,FOR KC-2
S
Maintain
No stock needed0 SET–1 / 3don't stock–0%–
4300031146
BEARING,THRUST PAD,DWG.829-5456,FOR KC-2
S
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4100082702
BEARING,THRUST PAD,SIZE IV391,A182F11
S
Maintain
No stock needed0 SET–1 / 2don't stock–0%–
4300027844
BEARING,THRUST PAD,DWG.701-6193,FOR KC-4
S
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4300051658
BEARING,THRUST PAD,DWG.222-8284,FOR KC-5
S
Maintain
No stock needed0 SET–0 / 0don't stock–0%–
4100100149
BOLT,ANCHOR,TYPE NU403,INCOLOY
A
Reduce
Excess39 EA–2 / 54 / 4 / 12–0%−Rp 696,816
4100097393
DEMISTER PAD,MODEL MV882,SS316
B
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300021361
DEMISTER PAD,DWG.670-2233,FOR VD-1953
B
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4300045435
DEMISTER PAD,DWG.287-3883,FOR VD-1610
B
Maintain
No stock needed0 EA–0 / 0don't stock–0%–
4200005129
LAMP,LED,12W,24VDC,E27
B
Monitor
Critical insurance spare1 EA–0 / 00 / 0 / 2reorder ~10 Sept 21240%–
4200005850
LAMP,LED,18W,24VDC,E27
B
Monitor
Insurance gap0 EA–10 / 150 / 0 / 2–0%–
4300020691
POSITIONER,VALVE,DWG.740-3896,FOR TCV-16
C
Monitor
Slow-moving2 EA10 / 00 / 0 / 2–0%–
4100016764
GASKET,RING,3/4IN,150#,GRAPHITE
A
Monitor
Critical insurance spare1 EA–1 / 20 / 0 / 4reorder ~16 Sept 20640%–
4100042429
TUBING,TYPE SH988,PTFE
S
Reduce
Potentially obsolete2 M–1 / 2don't stock–0%−Rp 686,656
4100042439
TUBING,MODEL RA47,GRAPHITE
S
Reduce
Potentially obsolete2 M–1 / 2don't stock–0%−Rp 686,656
← PreviousPage 128 / 150Next →