Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 88 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300023233 BEARING,THRUST PAD,DWG.150-5261,FOR KT-8 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300023245 BEARING,THRUST PAD,DWG.405-2939,FOR KT-8 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300023339 BEARING,JOURNAL,DWG.296-4799,FOR KT-856A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300023666 BEARING,JOURNAL,DWG.373-6923,FOR KT-856A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300023737 BEARING,JOURNAL,DWG.303-6211,FOR KT-856A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100028728 PIPE,1/4IN,SCH40,SS316,SMLS,6M LG | A | Reduce | Non-moving | 20 LG | – | 1 / 2 | 6 / 6 / 10 | – | 0% | −Rp 17.1M |
| 4100029251 PIPE,6IN,SCH80,CS,SMLS,6M LG | A | Reduce | Non-moving | 16 LG | – | 3 / 9 | 3 / 3 / 6 | – | 0% | −Rp 17.1M |
| 4100011953 COUPLING,MODEL LB312,PTFE | A | Reduce | Non-moving | 3 SET | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 17.1M |
| 4300007531 COUPLING,DWG.217-5517,FOR KC-365C | S | Reduce | Potentially obsolete | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 17.1M |
| 4100011224 COUPLING,TYPE QN314,NBR | A | Reduce | Non-moving | 3 SET | – | 3 / 5 | 0 / 0 / 1 | – | 0% | −Rp 17.1M |
| 4300015788 COUPLING,DWG.716-9882,FOR KC-854C | A | Reduce | Non-moving | 4 SET | – | 2 / 5 | 1 / 1 / 2 | – | 0% | −Rp 17.1M |
| 4300059600 COUPLING,DWG.146-4826,FOR KC-984C | S | Reduce | Potentially obsolete | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 17.1M |
| 4300045550 COUPLING,DWG.605-9180,FOR PP-1029C | B | Reduce | Non-moving | 3 SET | – | 3 / 4 | 0 / 0 / 1 | – | 0% | −Rp 17.1M |
| 4300051223 COUPLING,DWG.627-9427,FOR PP-1063 | A | Reduce | Non-moving | 3 SET | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 17.1M |
| 4300007067 COUPLING,DWG.877-1084,FOR PP-1141D | C | Reduce | Potentially obsolete | 2 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 17.1M |
| 4300045268 COUPLING,DWG.342-3086,FOR PP-1177C | B | Reduce | Non-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 17.1M |
| 4100011301 COUPLING,SIZE JK617,SS304 | A | Reduce | Non-moving | 3 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 17.1M |
| 4300053199 COUPLING,DWG.956-7277,FOR PP-1575A | A | Reduce | Non-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 17.1M |
| 4300002556 COUPLING,DWG.944-3030,FOR PP-1599A | B | Reduce | Non-moving | 3 SET | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 17.1M |
| 4300051391 COUPLING,DWG.325-1197,FOR PP-283B | A | Reduce | Non-moving | 3 SET | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 17.1M |
| 4300033959 COUPLING,DWG.912-6986,FOR PP-298C | S | Reduce | Potentially obsolete | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 17.1M |
| 4300031050 COUPLING,DWG.572-2717,FOR PP-481A | A | Reduce | Non-moving | 3 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 17.1M |
| 4100001345 BEARING,ROLLER,CYL,1ROW,6212-2Z | A | Reduce | Non-moving | 16 EA | – | 10 / 20 | 2 / 2 / 4 | – | 0% | −Rp 17.1M |
| 4100004482 BEARING,BALL,1ROW,DEEP GROOVE,NU307BDB | A | Reduce | Non-moving | 14 EA | – | 5 / 15 | 0 / 0 / 2 | – | 0% | −Rp 17.1M |
| 4100003451 BEARING,BALL,1ROW,DEEP GROOVE,NU317-2Z | B | Reduce | Non-moving | 14 EA | – | 3 / 8 | 0 / 0 / 2 | – | 0% | −Rp 17.1M |
| 4300008234 IMPELLER,DWG.930-5715,FOR PP-121B | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300066371 TRIM SET,CONTROL VALVE,DWG.563-6074,FOR | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100020692 O-RING,VITON,299MM ID,5.3MM CS | S | Reduce | Potentially obsolete | 427 EA | – | 10 / 26 | 0 / 0 / 3 | – | 0% | −Rp 16.8M |
| 4300013665 SPRING,SAFETY VALVE,DWG.240-3480,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300013848 SPRING,SAFETY VALVE,DWG.817-4455,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300019984 SEAL,LABYRINTH,DWG.358-2485,FOR KC-435A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300056110 SEAL,LABYRINTH,DWG.394-3345,FOR KC-588 | A | Monitor | Insurance gap | 0 SET | – | 2 / 4 | 0 / 0 / 1 | – | 2% | – |
| 4300049800 SEAL,LABYRINTH,DWG.563-9836,FOR KC-671D | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300049833 SEAL,LABYRINTH,DWG.784-3182,FOR KC-671D | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100087743 FILTER ELEMENT,AIR INTAKE,10MICRON,P/N F | A | Reduce | Non-moving | 8 EA | – | 2 / 6 | 0 / 0 / 2 | – | 0% | −Rp 16.6M |
| 4300026236 COUPLING,DWG.601-8419,FOR KC-236B | S | Monitor | No stock needed | 0 SET | – | 1 / 2 | don't stock | – | 8% | – |
| 4100091762 GREASE,COMPLEX,NLGI 2,16KG | B | Reduce | Non-moving | 93 KG | – | 1 / 3 | don't stock | – | 0% | −Rp 16.6M |
| 4100083456 BEARING,THRUST PAD,TYPE LI139,SS304 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300050590 BEARING,THRUST PAD,DWG.203-2818,FOR KC-4 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300050661 BEARING,THRUST PAD,DWG.918-8242,FOR KC-4 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300009701 BEARING,JOURNAL,DWG.438-4454,FOR KC-479C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300009721 BEARING,THRUST PAD,DWG.587-8076,FOR KC-4 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300009723 BEARING,THRUST PAD,DWG.360-6044,FOR KC-4 | A | Monitor | Insurance gap | 0 SET | – | 4 / 6 | 0 / 0 / 1 | – | 2% | – |
| 4300049344 BEARING,THRUST PAD,DWG.360-1099,FOR KC-8 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100104898 TAPE,PTFE,25MMX15M | C | TransferNormal | Slow-moving | 1 RL | – | 1 / 2 | 1 / 1 / 2 | transfer 1 from 4100103642 | 0% | – |
| 4300015195 TRIM SET,CONTROL VALVE,DWG.437-4058,FOR | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100101926 ANTIRUST,SPRAY TYPE,400ML/CAN,TYPE-B | C | Reduce | Potentially obsolete | 197 CAN | – | 4 / 8 | don't stock | – | 0% | −Rp 16.5M |
| 4100007063 IMPELLER,TYPE JX597,A105 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300056195Long-lead BEARING,JOURNAL,DWG.770-4901,FOR KC-588 | A | Monitor | Slow-moving | 1 SET | 2 | 1 / 2 | 0 / 0 / 2 | – | 2% | – |
| 4300031645 RING,WEAR,DWG.569-3262,FOR PP-207 | A | Reduce | Non-moving | 3 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 16.4M |