Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 90 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100052801Long-lead SOLENOID VALVE,MODEL VT661,INCOLOY | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100032106 TEE,1-1/2IN,3000#,A105,SW | C | Monitor | Healthy | 2 EA | – | 1 / 2 | 0 / 0 / 6 | reorder ~04 Aug 2027 | 3% | – |
| 4100075418 CERAMIC FIBER,BLANKET,50T,128KG/M3,1260C | A | Reduce | Excess | 29 RL | – | 12 / 31 | 10 / 14 / 25 | – | 0% | – |
| 4300050800 POSITIONER,VALVE,DWG.494-2217,FOR LCV-89 | A | Monitor | Insurance gap | 0 EA | – | 2 / 4 | 0 / 0 / 1 | – | 1% | – |
| 4300003506 VALVE,GOVERNOR,DWG.699-2797,FOR KT-397A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300003957 VALVE,GOVERNOR,DWG.198-2539,FOR KT-397A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300004136 VALVE,GOVERNOR,DWG.132-3226,FOR KT-397A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300004326 VALVE,GOVERNOR,DWG.726-4339,FOR KT-397A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300004512 VALVE,GOVERNOR,DWG.823-7799,FOR KT-397A | A | Monitor | Insurance gap | 0 ASS | – | 1 / 3 | 0 / 0 / 1 | – | 1% | – |
| 4300039720 VALVE,GOVERNOR,DWG.991-4013,FOR KT-419A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300039761 VALVE,GOVERNOR,DWG.731-4921,FOR KT-419A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300039971 VALVE,GOVERNOR,DWG.778-3038,FOR KT-419A | A | Monitor | Insurance gap | 0 ASS | – | 1 / 2 | 0 / 0 / 1 | – | 1% | – |
| 4300040189 VALVE,GOVERNOR,DWG.907-9962,FOR KT-419A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300040582 VALVE,GOVERNOR,DWG.549-5064,FOR KT-419A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100090947 VALVE,GOVERNOR,SIZE JL883,GRAPHITE | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300040634 VALVE,GOVERNOR,DWG.628-3458,FOR KT-419A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300040929 VALVE,GOVERNOR,DWG.408-4547,FOR KT-419A | A | Monitor | Insurance gap | 0 ASS | – | 2 / 4 | 0 / 0 / 1 | – | 1% | – |
| 4300022330 VALVE,GOVERNOR,DWG.370-9564,FOR KT-856A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300022767 VALVE,GOVERNOR,DWG.404-1293,FOR KT-856A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300022835 VALVE,GOVERNOR,DWG.517-2846,FOR KT-856A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300023044 VALVE,GOVERNOR,DWG.753-2802,FOR KT-856A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300023209 VALVE,GOVERNOR,DWG.190-8989,FOR KT-856A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300023220 VALVE,GOVERNOR,DWG.361-8001,FOR KT-856A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300023321 VALVE,GOVERNOR,DWG.125-3583,FOR KT-856A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300023444 VALVE,GOVERNOR,DWG.139-5784,FOR KT-856A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300023477 VALVE,GOVERNOR,DWG.678-9753,FOR KT-856A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300023565 VALVE,GOVERNOR,DWG.700-8806,FOR KT-856A | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300053023 COUPLING,DWG.378-8218,FOR PP-169A | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300037117 SEAT RING,VALVE,DWG.622-8214,FOR LCV-104 | C | Reduce | Slow-moving | 11 EA | 14 | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 14.5M |
| 4300010398 BLADE,ROTOR,DWG.543-5382,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 7% | – |
| 4300010615 BLADE,ROTOR,DWG.790-4421,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 7% | – |
| 4300011470 BLADE,ROTOR,DWG.188-8252,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 7% | – |
| 4300011494 BLADE,ROTOR,DWG.181-4023,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 7% | – |
| 4100089433 BLADE,ROTOR,TYPE BR715,CS | S | Maintain | No stock needed | 0 SET | – | 2 / 4 | don't stock | – | 7% | – |
| 4300011793 BLADE,ROTOR,DWG.783-3572,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 7% | – |
| 4300012016 BLADE,ROTOR,DWG.905-1545,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 7% | – |
| 4300054499 SEAL,LABYRINTH,DWG.453-5480,FOR KC-513 | S | Maintain | No stock needed | 0 SET | – | 1 / 2 | don't stock | – | 7% | – |
| 4100001399 BEARING,BALL,1ROW,DEEP GROOVE,6218 C3 | A | Reduce | Non-moving | 12 EA | – | 10 / 17 | 0 / 0 / 2 | – | 0% | −Rp 14.2M |
| 4100005100 BEARING,ROLLER,CYL,1ROW,7211 | C | Reduce | Potentially obsolete | 10 EA | – | 4 / 11 | don't stock | – | 0% | −Rp 14.2M |
| 4100012133 COUPLING,MODEL XV479,SS316 | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100093520 TUBE PLUG,EXCHANGER,TYPE ZR469,GRAPHITE | A | Reduce | Excess | 35 EA | – | 1 / 2 | 4 / 4 / 7 | – | 0% | −Rp 14.1M |
| 4300054849 COUPLING,DWG.493-6416,FOR PP-1011D | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300068820 COUPLING,DWG.197-9517,FOR PP-1890 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300036355Long-lead TRIM SET,CONTROL VALVE,DWG.607-5278,FOR | A | Monitor | Insurance gap | 0 SET | – | 5 / 9 | 0 / 0 / 1 | – | 1% | – |
| 4200003024 TERMINAL BLOCK,MODEL JV840,INCOLOY | B | Reduce | Non-moving | 208 EA | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 14.1M |
| 4100021284 O-RING,VITON,277MM ID,5.3MM CS | A | Monitor | Critical insurance spare | 1 EA | – | 1 / 3 | 3 / 3 / 6 | – | 1% | – |
| 4300056928 BEARING,THRUST PAD,DWG.304-6800,FOR KC-8 | S | Monitor | No stock needed | 0 SET | – | 1 / 2 | don't stock | – | 7% | – |
| 4300074688 BEARING,JOURNAL,DWG.259-5855,FOR KC-226 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300046638 BEARING,THRUST PAD,DWG.118-2116,FOR KC-3 | A | Monitor | Insurance gap | 0 SET | – | 3 / 9 | 0 / 0 / 1 | – | 1% | – |
| 4300015732 BEARING,JOURNAL,DWG.857-7676,FOR KC-854C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |