Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,848 spare parts
Order value Rp 0 · excess value Rp 3.41T · page 17 of 37
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300023699 SEAL,LABYRINTH,DWG.666-3167,FOR KT-856A | A | Reduce | Non-moving | 3 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4100006048 SEAL,MECHANICAL,MODEL AW550,MONEL | A | Reduce | Non-moving | 4 SET | – | 3 / 7 | 1 / 1 / 2 | – | 0% | −Rp 189.2M |
| 4100006557 SEAL,MECHANICAL,SIZE NX293,MONEL | A | Reduce | Non-moving | 3 SET | – | 3 / 4 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4100006201 SEAL,MECHANICAL,MODEL XV942,MONEL | B | Reduce | Non-moving | 3 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 189.2M |
| 4300072264Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.335-8199,FOR PRV | C | Reduce | Non-moving | 22 EA | – | 10 / 25 | 0 / 0 / 1 | – | 0% | −Rp 185.2M |
| 4300067431Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.992-2160,FOR PRV | S | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 182.5M |
| 4100052857Safety-criticalSign-off SOLENOID VALVE,TYPE LG594,A105 | S | Reduce | Non-moving | 17 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 180.6M |
| 4300045397 RING,WEAR,DWG.467-9717,FOR PP-1115 | A | Reduce | Non-moving | 23 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 180.1M |
| 4300020329Long-lead TRIM SET,CONTROL VALVE,DWG.638-3732,FOR | B | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 179.6M |
| 4100015228 GASKET,RING,2IN,150#,GR/304 | A | Reduce | Non-moving | 839 EA | – | 10 / 30 | 4 / 4 / 8 | – | 0% | −Rp 178.2M |
| 4100075925 CERAMIC FIBER,BLANKET,25T,96KG/M3,1260C | A | Reduce | Non-moving | 136 RL | – | 10 / 24 | 2 / 2 / 4 | – | 0% | −Rp 175.7M |
| 4300024908Safety-criticalSign-off DISC,SAFETY VALVE,DWG.421-9505,FOR PRV-1 | S | Reduce | Non-moving | 15 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 175.6M |
| 4100057879 TRANSMITTER,DIFF.PRESS,0~2500MMH2O,FF | A | Reduce | Non-moving | 6 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 170.7M |
| 4100060694 TRANSMITTER,TEMP,TYPE NY829,INCOLOY | A | Reduce | Non-moving | 6 EA | – | 3 / 7 | 0 / 0 / 1 | – | 0% | −Rp 170.7M |
| 4100059103 TRANSMITTER,TEMP,TYPE UH835,GRAPHITE | B | Reduce | Non-moving | 6 EA | – | 4 / 7 | 0 / 0 / 1 | – | 0% | −Rp 170.7M |
| 4100058184 TRANSMITTER,DIFF.PRESS,0~500MMH2O,HART | B | Reduce | Non-moving | 5 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 170.7M |
| 4100052144Safety-criticalSign-off SOLENOID VALVE,TYPE HM580,SS316 | B | Reduce | Non-moving | 16 EA | – | 10 / 17 | 0 / 0 / 1 | – | 0% | −Rp 169.3M |
| 4300022059 SEAT RING,VALVE,DWG.103-5575,FOR FCV-104 | B | Reduce | Non-moving | 16 EA | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 169.2M |
| 4300013493 SPRING,SAFETY VALVE,DWG.882-9675,FOR KT- | A | Reduce | Non-moving | 20 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 167.6M |
| 4300071484Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.492-7644,FOR PRV | S | Reduce | Non-moving | 20 EA | – | 5 / 14 | 0 / 0 / 1 | – | 0% | −Rp 167.6M |
| 4100069058Safety-criticalLong-leadSign-off DISC,SAFETY VALVE,TYPE OD677,A105 | S | Reduce | Non-moving | 19 EA | – | 10 / 22 | 0 / 0 / 1 | – | 0% | −Rp 166.2M |
| 4300038550 RING,WEAR,DWG.620-8889,FOR PP-123 | B | Reduce | Non-moving | 21 EA | – | 10 / 22 | 0 / 0 / 1 | – | 0% | −Rp 163.7M |
| 4100010930 COUPLING,SIZE AC401,A182F11 | A | Reduce | Non-moving | 21 SET | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 162.5M |
| 4300024589 COUPLING,DWG.711-2389,FOR PP-1769A | A | Reduce | Non-moving | 20 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 162.5M |
| 4200011537 FAN,COOLING MOTOR,DWG.426-3869,FOR KC-62 | A | Reduce | Non-moving | 130 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 160.4M |
| 4300021541 POSITIONER,VALVE,DWG.834-3196,FOR FCV-10 | B | Reduce | Non-moving | 4 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 159.7M |
| 4300026926 POSITIONER,VALVE,DWG.849-8223,FOR FCV-11 | A | Reduce | Non-moving | 4 EA | – | 4 / 7 | don't stock | – | 0% | −Rp 159.7M |
| 4300068341 POSITIONER,VALVE,DWG.204-4800,FOR LCV-15 | B | Reduce | Non-moving | 4 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 159.7M |
| 4300038656 POSITIONER,VALVE,DWG.210-3130,FOR LCV-19 | A | Reduce | Non-moving | 5 EA | – | 10 / 31 | 0 / 0 / 1 | – | 0% | −Rp 159.7M |
| 4300024082 POSITIONER,VALVE,DWG.193-2350,FOR LCV-48 | B | Reduce | Non-moving | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 159.7M |
| 4300029120 POSITIONER,VALVE,DWG.676-4357,FOR PCV-10 | B | Reduce | Non-moving | 4 EA | – | 3 / 7 | don't stock | – | 0% | −Rp 159.7M |
| 4300051550 POSITIONER,VALVE,DWG.106-6484,FOR PCV-11 | A | Reduce | Non-moving | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 159.7M |
| 4100048905 POSITIONER,VALVE,MODEL ZR955,NBR | A | Reduce | Non-moving | 4 EA | – | 3 / 6 | don't stock | – | 0% | −Rp 159.7M |
| 4300009107 POSITIONER,VALVE,DWG.512-6484,FOR PCV-49 | A | Reduce | Non-moving | 4 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 159.7M |
| 4300069782Long-lead BEARING,THRUST PAD,DWG.262-4920,FOR KT-5 | A | Reduce | Non-moving | 2 SET | 1 | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 158.7M |
| 4100052668Safety-criticalSign-off SOLENOID VALVE,TYPE RC360,PTFE | S | Reduce | Non-moving | 15 EA | – | 10 / 20 | 0 / 0 / 1 | – | 0% | −Rp 158.1M |
| 4300026470 SEAT RING,VALVE,DWG.176-1073,FOR LCV-140 | A | Reduce | Non-moving | 15 EA | – | 10 / 32 | 0 / 0 / 1 | – | 0% | −Rp 157.9M |
| 4100045560Safety-criticalSign-off PACKING SET,VALVE,MODEL MJ261,GRAPHITE | B | Reduce | Non-moving | 43 SET | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 157.5M |
| 4300048960 TRIM SET,CONTROL VALVE,DWG.644-4018,FOR | B | Reduce | Non-moving | 2 SET | – | 3 / 5 | don't stock | – | 0% | −Rp 157.0M |
| 4100043699 TRIM SET,CONTROL VALVE,MODEL PI446,NBR | A | Reduce | Non-moving | 3 SET | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 157.0M |
| 4300074205 TRIM SET,CONTROL VALVE,DWG.803-2594,FOR | B | Reduce | Non-moving | 2 SET | – | 2 / 4 | don't stock | – | 0% | −Rp 157.0M |
| 4100043813 TRIM SET,CONTROL VALVE,MODEL UJ414,INCOL | B | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 157.0M |
| 4300009274 TRIM SET,CONTROL VALVE,DWG.406-7364,FOR | B | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 157.0M |
| 4300009307 TRIM SET,CONTROL VALVE,DWG.157-3662,FOR | B | Reduce | Non-moving | 2 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 157.0M |
| 4300039188 TRIM SET,CONTROL VALVE,DWG.215-5644,FOR | B | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 157.0M |
| 4300050163 TRIM SET,CONTROL VALVE,DWG.653-2547,FOR | B | Reduce | Non-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 157.0M |
| 4300064501 TRIM SET,CONTROL VALVE,DWG.273-1364,FOR | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 157.0M |
| 4300045351 TRIM SET,CONTROL VALVE,DWG.325-8444,FOR | S | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 157.0M |
| 4300009983 TRIM SET,CONTROL VALVE,DWG.672-3404,FOR | B | Reduce | Non-moving | 2 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 157.0M |
| 4300001742 TRIM SET,CONTROL VALVE,DWG.220-9391,FOR | B | Reduce | Non-moving | 2 SET | – | 2 / 3 | don't stock | – | 0% | −Rp 157.0M |