Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,848 spare parts
Order value Rp 0 · excess value Rp 3.41T · page 18 of 37
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300065943 TRIM SET,CONTROL VALVE,DWG.341-4818,FOR | B | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 157.0M |
| 4300047433Long-lead RING,WEAR,DWG.316-8372,FOR PP-205B | B | Reduce | Non-moving | 14 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 156.9M |
| 4300073107 RING,WEAR,DWG.344-6359,FOR PP-1056 | A | Reduce | Non-moving | 20 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 155.5M |
| 4100001791 BEARING,BALL,ANGULAR,6305-2Z | A | Reduce | Non-moving | 113 EA | – | 3 / 9 | 2 / 2 / 4 | – | 0% | −Rp 155.3M |
| 4300063128Long-lead SEAT RING,VALVE,DWG.713-3832,FOR TCV-868 | A | Reduce | Non-moving | 7 EA | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 154.9M |
| 4200011576 FAN,COOLING MOTOR,DWG.267-7956,FOR PP-16 | B | Reduce | Non-moving | 125 EA | – | 2 / 4 | 0 / 0 / 2 | – | 0% | −Rp 154.2M |
| 4300026138 COUPLING,DWG.697-4877,FOR PP-1166B | A | Reduce | Non-moving | 19 SET | – | 5 / 8 | 0 / 0 / 1 | – | 0% | −Rp 154.0M |
| 4300027195 SLEEVE,SHAFT,DWG.686-6690,FOR PP-1764 | B | Reduce | Non-moving | 20 EA | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 153.7M |
| 4100001263 BEARING,BALL,ANGULAR,NU314-2Z | A | Reduce | Non-moving | 109 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 152.4M |
| 4300036306Safety-criticalSign-off DISC,SAFETY VALVE,DWG.694-5145,FOR PRV-1 | S | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 150.5M |
| 4300021125Safety-criticalSign-off DISC,SAFETY VALVE,DWG.386-9182,FOR PRV-1 | C | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 150.5M |
| 4300038754Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.378-7702,FOR PRV | B | Reduce | Non-moving | 18 EA | – | 10 / 29 | 0 / 0 / 1 | – | 0% | −Rp 149.9M |
| 4300037308Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.589-1587,FOR PRV | S | Reduce | Non-moving | 18 EA | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 149.9M |
| 4300050280Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.211-5339,FOR PRV | S | Reduce | Non-moving | 18 EA | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 149.9M |
| 4100046361 PACKING SET,VALVE,TYPE MD375,A105 | A | Reduce | Non-moving | 41 SET | – | 10 / 26 | 0 / 0 / 2 | – | 0% | −Rp 149.8M |
| 4100048165 DIAPHRAGM,ACTUATOR,MODEL AZ298,NBR | B | Reduce | Non-moving | 35 EA | – | 10 / 17 | 0 / 0 / 1 | – | 0% | −Rp 149.0M |
| 4300053031 RING,WEAR,DWG.107-2129,FOR PP-169A | B | Reduce | Non-moving | 19 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 147.3M |
| 4100053144Safety-criticalSign-off SOLENOID VALVE,TYPE EL663,MONEL | S | Reduce | Non-moving | 14 EA | – | 4 / 12 | 0 / 0 / 1 | – | 0% | −Rp 146.8M |
| 4100050952 SEAT RING,VALVE,TYPE VT620,A105 | B | Reduce | Non-moving | 14 EA | – | 3 / 9 | 0 / 0 / 1 | – | 0% | −Rp 146.6M |
| 4300050837 SEAT RING,VALVE,DWG.651-5221,FOR FCV-556 | A | Reduce | Non-moving | 14 EA | – | 3 / 9 | 0 / 0 / 1 | – | 0% | −Rp 146.6M |
| 4100010356 SLEEVE,SHAFT,TYPE NJ936,SS316 | B | Reduce | Non-moving | 19 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 145.6M |
| 4300030981 SLEEVE,SHAFT,DWG.649-1110,FOR PP-1735 | A | Reduce | Non-moving | 20 EA | – | 4 / 9 | 1 / 1 / 2 | – | 0% | −Rp 145.6M |
| 4300049225 SLEEVE,SHAFT,DWG.806-7198,FOR PP-1744 | C | Reduce | Non-moving | 18 EA | – | 10 / 19 | don't stock | – | 0% | −Rp 145.6M |
| 4300020073 COUPLING,DWG.578-4632,FOR KC-435A | A | Reduce | Non-moving | 18 SET | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 145.4M |
| 4300058059 COUPLING,DWG.637-4074,FOR PP-1325 | B | Reduce | Non-moving | 18 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 145.4M |
| 4300019493 THERMOWELL,DWG.183-2591,FOR TEL-421-46 | A | Reduce | Non-moving | 24 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 145.2M |
| 4300014637Safety-criticalLong-leadSign-off DISC,SAFETY VALVE,DWG.813-1279,FOR PRV-1 | B | Reduce | Non-moving | 5 EA | 2 | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 144.2M |
| 4100029297 PIPE,2IN,STD,P11,SMLS,6M LG | B | Reduce | Non-moving | 87 LG | – | 1 / 2 | 0 / 0 / 3 | – | 0% | −Rp 143.8M |
| 4100046788 PACKING SET,VALVE,MODEL BW935,SS304 | A | Reduce | Non-moving | 39 SET | – | 10 / 20 | 0 / 0 / 2 | – | 0% | −Rp 142.1M |
| 4300033883Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.911-2455,FOR PRV | S | Reduce | Non-moving | 8 EA | – | 3 / 5 | 0 / 0 / 1 | – | 0% | −Rp 141.9M |
| 4300058509Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.336-6377,FOR PRV | S | Reduce | Non-moving | 8 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 141.9M |
| 4300031621Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.637-3464,FOR PRV | S | Reduce | Non-moving | 8 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 141.9M |
| 4300051690Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.934-1532,FOR PRV | S | Reduce | Non-moving | 17 EA | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 141.1M |
| 4300074518Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.651-2378,FOR PRV | S | Reduce | Non-moving | 17 EA | – | 5 / 10 | 0 / 0 / 1 | – | 0% | −Rp 141.1M |
| 4300051195Long-lead COUPLING,DWG.468-8805,FOR PP-517A | B | Reduce | Non-moving | 42 SET | 2 | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 140.7M |
| 4100077500 BURNER TIP,TYPE PU42,INCOLOY | A | Reduce | Non-moving | 14 EA | – | 2 / 6 | 3 / 3 / 5 | – | 0% | −Rp 139.4M |
| 4300053810 DEMISTER PAD,DWG.601-3221,FOR VD-421 | B | Reduce | Non-moving | 9 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 138.8M |
| 4300015114Safety-criticalSign-off DISC,SAFETY VALVE,DWG.703-1967,FOR PRV-1 | A | Reduce | Non-moving | 12 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 138.0M |
| 4300027121Safety-criticalSign-off DISC,SAFETY VALVE,DWG.274-3333,FOR PRV-9 | S | Reduce | Non-moving | 12 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 138.0M |
| 4100010724 COUPLING,SIZE XE347,INCOLOY | A | Reduce | Non-moving | 18 SET | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 136.9M |
| 4300002885 COUPLING,DWG.700-8082,FOR KC-930C | A | Reduce | Non-moving | 17 SET | – | 5 / 10 | 0 / 0 / 1 | – | 0% | −Rp 136.9M |
| 4300012753 COUPLING,DWG.354-8403,FOR PP-1099 | A | Reduce | Non-moving | 17 SET | – | 4 / 7 | 0 / 0 / 1 | – | 0% | −Rp 136.9M |
| 4300049687 COUPLING,DWG.205-7162,FOR PP-1106A | C | Reduce | Non-moving | 16 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 136.9M |
| 4100055694 TRANSMITTER,PRESS,SIZE PG379,A182F11 | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 136.6M |
| 4100058243 TRANSMITTER,DIFF.PRESS,0~5000MMH2O,HART | A | Reduce | Non-moving | 4 EA | – | 3 / 7 | don't stock | – | 0% | −Rp 136.6M |
| 4100058061 TRANSMITTER,DIFF.PRESS,0~10000MMH2O,FF | A | Reduce | Non-moving | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 136.6M |
| 4100087055 FILTER ELEMENT,SEAL GAS,3MICRON,P/N FE-7 | A | Reduce | Non-moving | 51 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 135.8M |
| 4300039107 SEAT RING,VALVE,DWG.736-3712,FOR LCV-169 | B | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 135.4M |
| 4300070898 SEAT RING,VALVE,DWG.500-9018,FOR LCV-952 | B | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 135.4M |
| 4300053741 THERMOWELL,DWG.293-5355,FOR BF-104-DUCT1 | A | Reduce | Non-moving | 23 EA | – | 10 / 29 | 0 / 0 / 1 | – | 0% | −Rp 133.1M |