Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 103 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300028065 POSITIONER,VALVE,DWG.768-1426,FOR PCV-40 | S | Monitor | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 3% | – |
| 4100062097 THERMOCOUPLE,J-2ELMNT,3.2X3000LG | A | Reduce | Non-moving | 3 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 6.4M |
| 4100061248 THERMOCOUPLE,K-2ELMNT,6.4X1200LG | A | Reduce | Non-moving | 3 EA | – | 2 / 3 | 1 / 1 / 2 | – | 0% | −Rp 6.4M |
| 4100062208 THERMOCOUPLE,K-1ELMNT,8X2200LG | C | Reduce | Potentially obsolete | 1 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 6.4M |
| 4100012512 RING,WEAR,MODEL BS238,SS316 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300014701 RING,WEAR,DWG.951-8098,FOR PP-1775A | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100006397 SEAL,MECHANICAL,SIZE FP877,MONEL | A | Monitor | Insurance gap | 0 SET | – | 10 / 28 | 0 / 0 / 1 | – | 1% | – |
| 4100033154 FLANGE,BLIND,1IN,300#,SS316,RF | A | Monitor | Insurance gap | 0 EA | – | 1 / 3 | 0 / 0 / 5 | – | 1% | – |
| 4100087244 FILTER ELEMENT,FUEL GAS,3MICRON,P/N FE-3 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 1% | – |
| 4100087905 FILTER ELEMENT,SEAL GAS,3MICRON,P/N FE-7 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 1% | – |
| 4200010114 FAN,COOLING MOTOR,DWG.863-1180,FOR PP-12 | A | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 6.3M |
| 4200010838 FAN,COOLING MOTOR,DWG.859-4444,FOR PP-28 | A | Reduce | Non-moving | 7 EA | – | 3 / 8 | 0 / 0 / 2 | – | 0% | −Rp 6.3M |
| 4300063378 SEAT RING,VALVE,DWG.607-3377,FOR PCV-146 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300047322 SEAT RING,VALVE,DWG.415-8536,FOR PCV-157 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300052511 SEAT RING,VALVE,DWG.823-5466,FOR PCV-233 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300052544 SEAT RING,VALVE,DWG.418-2011,FOR PCV-233 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100050671 SEAT RING,VALVE,SIZE KU837,A182F11 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300034998 SEAT RING,VALVE,DWG.680-4922,FOR PCV-850 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100015852 GASKET,RING,3IN,300#,PTFE | A | Reduce | Non-moving | 24 EA | – | 0 / 0 | 7 / 7 / 13 | – | 0% | −Rp 6.2M |
| 4100048174Long-lead DIAPHRAGM,ACTUATOR,MODEL OB629,SS316 | B | Monitor | Slow-moving | 5 EA | – | 1 / 3 | 3 / 3 / 6 | – | 1% | – |
| 4100042729 TUBING,SIZE BV950,A105 | C | Reduce | Potentially obsolete | 18 M | – | 10 / 29 | don't stock | – | 0% | −Rp 6.2M |
| 4300014500 SEAL,LABYRINTH,DWG.341-2788,FOR KC-264A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 3% | – |
| 4300020193 SEAL,LABYRINTH,DWG.106-9791,FOR KC-730 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 3% | – |
| 4300065002 SEAL,LABYRINTH,DWG.483-2853,FOR KC-830D | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 3% | – |
| 4100081302 BEARING,JOURNAL,TYPE FT14,A182F11 | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300014362 BEARING,THRUST PAD,DWG.148-3158,FOR KC-1 | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300049846 BEARING,JOURNAL,DWG.253-9139,FOR KC-671D | A | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4100107783 OIL,LUBRICANT,ISO VG 46,MINERAL,209L | A | Monitor | Critical insurance spare | 3 L | – | 1 / 2 | 0 / 0 / 11 | reorder ~04 Sept 2029 | 1% | – |
| 4100026927 STUDBOLT,1/2INX80MM,B8M/8M | A | Reduce | Non-moving | 188 EA | – | 3 / 7 | 0 / 0 / 27 | – | 0% | −Rp 6.1M |
| 4100034063 FLANGE,BLIND,4IN,150#,SS316,RF | B | Reduce | Slow-moving | 5 EA | 2 | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 6.1M |
| 4100074623 CASTABLE,REFRACTORY,INSUL,1600DEG C | A | Monitor | Critical insurance spare | 150 KG | – | 3 / 6 | 171 / 181 / 272 | – | 1% | – |
| 4100093710 TUBE PLUG,EXCHANGER,MODEL WY991,PTFE | A | Reduce | Slow-moving | 14 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 6.1M |
| 4100035751Long-lead VALVE,GATE,2IN,800#,A105,SW | A | Reduce | Non-moving | 18 EA | – | 10 / 28 | 3 / 3 / 5 | – | 0% | −Rp 6.1M |
| 4100016957 GASKET,SHEET,1/4IN,300#,GRAPHITE | A | Monitor | Critical insurance spare | 2 EA | – | 1 / 2 | 0 / 0 / 4 | reorder ~07 May 2035 | 1% | – |
| 4300030965 THERMOWELL,DWG.506-1379,FOR BF-104-BRN08 | A | Reduce | Slow-moving | 4 EA | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 6.1M |
| 4300050107 THERMOWELL,DWG.165-2139,FOR TEL-1349A | A | Reduce | Non-moving | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 6.1M |
| 4300070882 THERMOWELL,DWG.442-2842,FOR TEL-135 | C | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 6.1M |
| 4300049042 THERMOWELL,DWG.475-2603,FOR TEL-1599B | C | Reduce | Potentially obsolete | 1 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 6.1M |
| 4300052633 THERMOWELL,DWG.782-7168,FOR TEL-1793 | A | Reduce | Non-moving | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 6.1M |
| 4300057027 THERMOWELL,DWG.285-8977,FOR TEL-1898A | C | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 6.1M |
| 4100063214 THERMOWELL,MODEL ID884,SS316 | C | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 6.1M |
| 4300060722 THERMOWELL,DWG.388-8003,FOR TEL-583 | C | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 6.1M |
| 4300016201 THERMOWELL,DWG.613-2478,FOR TEL-706A | C | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 6.1M |
| 4300071592 THERMOWELL,DWG.899-6680,FOR TEL-752B | S | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 6.1M |
| 4100049416 POSITIONER,VALVE,TYPE FZ658,PTFE | S | Monitor | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 3% | – |
| 4100061410 THERMOCOUPLE,J-2ELMNT,6.4X300LG | A | Monitor | Critical insurance spare | 1 EA | – | 1 / 2 | 2 / 2 / 3 | – | 1% | – |
| 4300034040Long-lead TRIM SET,CONTROL VALVE,DWG.469-2128,FOR | B | Monitor | Stockout | 0 SET | 1 | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100060381 TRANSMITTER,TEMP,MODEL ZY603,PTFE | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 3% | – |
| 4100073289 FIREBRICK,INSUL,23,76T,114W,230L | S | Reduce | Potentially obsolete | 38 EA | – | 10 / 26 | don't stock | – | 12% | – |
| 4300023791 IMPELLER,DWG.588-7389,FOR PP-1941A | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 3% | – |