Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
860 spare parts
Order value Rp 8.9B · excess value Rp 106.7B · page 11 of 18
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100066354Safety-criticalSign-off SPRING,SAFETY VALVE,MODEL NN775,PTFE | S | Reduce | Non-moving | 16 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 132.3M |
| 4100045901Safety-criticalSign-off PACKING SET,VALVE,SIZE EG119,VITON | A | Reduce | Non-moving | 35 SET | – | 2 / 4 | 0 / 0 / 2 | – | 0% | −Rp 126.8M |
| 4100069517Safety-criticalSign-off DISC,SAFETY VALVE,MODEL CK256,GRAPHITE | S | Reduce | Non-moving | 11 EA | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 125.4M |
| 4100024218Safety-criticalSign-off STUDBOLT,3/4INX75MM,B8M/8M | A | Reduce | Excess | 2,238 EA | – | 653 / 1,243 | 102 / 149 / 572 | – | 0% | −Rp 125.2M |
| 4100052777Safety-criticalSign-off SOLENOID VALVE,MODEL FS47,MONEL | S | Reduce | Non-moving | 12 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 124.2M |
| 4100066532Safety-criticalSign-off SPRING,SAFETY VALVE,SIZE WM753,A105 | S | Reduce | Non-moving | 15 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 123.5M |
| 4300073074Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.190-9186,FOR PRV | S | Reduce | Non-moving | 7 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 121.7M |
| 4300068832Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.715-8036,FOR PRV | S | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 121.7M |
| 4100069783Safety-criticalSign-off NOZZLE,SAFETY VALVE,MODEL RH423,GRAPHITE | S | Reduce | Non-moving | 7 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 121.7M |
| 4100070430Safety-criticalSign-off NOZZLE,SAFETY VALVE,SIZE CQ186,A182F11 | S | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 121.7M |
| 4100070066Safety-criticalSign-off NOZZLE,SAFETY VALVE,MODEL JF762,PTFE | A | Reduce | Non-moving | 7 EA | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 121.7M |
| 4300046702Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.454-3583,FOR PRV | C | Reduce | Slow-moving | 8 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 121.7M |
| 4300059721Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.589-3595,FOR PRV | S | Reduce | Non-moving | 14 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 114.6M |
| 4300058113Safety-criticalSign-off DISC,SAFETY VALVE,DWG.227-9647,FOR PRV-1 | C | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 112.9M |
| 4100068884Safety-criticalSign-off DISC,SAFETY VALVE,MODEL AC143,CS | A | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 112.9M |
| 4300025792Safety-criticalSign-off DISC,SAFETY VALVE,DWG.697-6527,FOR PRV-1 | A | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 112.9M |
| 4100067968Safety-criticalSign-off DISC,SAFETY VALVE,TYPE CL962,MONEL | C | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 112.9M |
| 4300006436Safety-criticalSign-off DISC,SAFETY VALVE,DWG.861-4946,FOR PRV-5 | S | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 112.9M |
| 4300037957Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.863-1667,FOR PRV | S | Reduce | Non-moving | 13 EA | – | 10 / 16 | 0 / 0 / 1 | – | 0% | −Rp 105.8M |
| 4300046749Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.445-1419,FOR PRV | C | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 105.8M |
| 4100046358Safety-criticalSign-off PACKING SET,VALVE,TYPE HT327,VITON | A | Reduce | Non-moving | 29 SET | – | 4 / 12 | 0 / 0 / 2 | – | 0% | −Rp 103.7M |
| 4100052830Safety-criticalSign-off SOLENOID VALVE,TYPE PW365,SS304 | A | Reduce | Non-moving | 10 EA | – | 5 / 16 | 0 / 0 / 1 | – | 0% | −Rp 101.6M |
| 4300067049Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.426-5391,FOR PRV | A | Reduce | Slow-moving | 7 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 101.4M |
| 4300054775Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.262-2460,FOR PRV | A | Reduce | Non-moving | 6 EA | – | 5 / 8 | 0 / 0 / 1 | – | 0% | −Rp 101.4M |
| 4100068057Safety-criticalSign-off DISC,SAFETY VALVE,MODEL SM332,NBR | S | Reduce | Non-moving | 9 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 100.3M |
| 4300058408Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.557-5730,FOR PRV | S | Reduce | Non-moving | 12 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 97.0M |
| 4300001936Safety-criticalLong-leadSign-off DISC,SAFETY VALVE,DWG.631-2337,FOR PRV-2 | A | Reduce | Excess | 15 EA | 3 | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 90.4M |
| 4300009017Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.489-7285,FOR PRV | S | Reduce | Non-moving | 11 EA | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 88.2M |
| 4100068603Safety-criticalSign-off DISC,SAFETY VALVE,TYPE AN114,VITON | S | Reduce | Non-moving | 8 EA | – | 5 / 9 | 0 / 0 / 1 | – | 0% | −Rp 87.8M |
| 4300027169Safety-criticalSign-off DISC,SAFETY VALVE,DWG.685-5400,FOR PRV-9 | S | Reduce | Non-moving | 8 EA | – | 5 / 16 | 0 / 0 / 1 | – | 0% | −Rp 87.8M |
| 4100045462Safety-criticalLong-leadSign-off PACKING SET,VALVE,TYPE GE526,NBR | A | Reduce | Slow-moving | 49 SET | – | 1 / 2 | 3 / 3 / 5 | – | 0% | −Rp 85.7M |
| 4300067214Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.303-9520,FOR PRV | S | Reduce | Non-moving | 5 EA | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 81.1M |
| 4100070837Safety-criticalSign-off NOZZLE,SAFETY VALVE,TYPE QJ339,VITON | S | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 81.1M |
| 4300048890Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.491-7468,FOR PRV | A | Reduce | Non-moving | 5 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 81.1M |
| 4300024851Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.102-3254,FOR PRV | A | Reduce | Non-moving | 5 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 81.1M |
| 4300006443Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.814-7346,FOR PRV | S | Reduce | Excess | 6 EA | – | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 81.1M |
| 4300016714Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.362-9797,FOR PRV | S | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 79.4M |
| 4300009885Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.855-1966,FOR PRV | S | Reduce | Non-moving | 10 EA | – | 4 / 8 | 0 / 0 / 1 | – | 0% | −Rp 79.4M |
| 4300009006Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.516-3751,FOR PRV | S | Reduce | Non-moving | 10 EA | – | 10 / 17 | 0 / 0 / 1 | – | 0% | −Rp 79.4M |
| 4300027669Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.475-4883,FOR PRV | S | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 79.4M |
| 4100053205Safety-criticalSign-off SOLENOID VALVE,TYPE SY883,SS304 | S | Reduce | Non-moving | 8 EA | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 79.0M |
| 4100024181Safety-criticalSign-off STUDBOLT,5/8INX85MM,B7/2H | A | Reduce | Excess | 2,983 EA | 9,247 | 1,065 / 3,335 | 501 / 699 / 1,398 | – | 0% | −Rp 76.2M |
| 4300072860Safety-criticalSign-off DISC,SAFETY VALVE,DWG.130-7569,FOR PRV-1 | S | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 75.2M |
| 4300064641Safety-criticalSign-off DISC,SAFETY VALVE,DWG.936-9563,FOR PRV-3 | S | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 75.2M |
| 4100069395Safety-criticalSign-off DISC,SAFETY VALVE,MODEL VM630,NBR | S | Reduce | Non-moving | 7 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 75.2M |
| 4300049995Safety-criticalSign-off DISC,SAFETY VALVE,DWG.813-6281,FOR PRV-8 | S | Reduce | Non-moving | 7 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 75.2M |
| 4300018499Safety-criticalSign-off DISC,SAFETY VALVE,DWG.921-3594,FOR PRV-1 | A | Reduce | Slow-moving | 11 EA | – | 1 / 2 | 3 / 3 / 5 | – | 0% | −Rp 75.2M |
| 4100053922Safety-criticalSign-off SWITCH,LIMIT,SIZE WJ682,A182F11 | S | Reduce | Non-moving | 14 EA | – | 10 / 16 | 0 / 0 / 2 | – | 0% | −Rp 71.5M |
| 4300066012Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.494-5868,FOR PRV | S | Reduce | Non-moving | 9 EA | – | 4 / 12 | 0 / 0 / 1 | – | 0% | −Rp 70.5M |
| 4300072867Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.101-3591,FOR PRV | S | Reduce | Non-moving | 9 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 70.5M |