Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 40 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300015640 TRIM SET,CONTROL VALVE,DWG.518-9807,FOR | C | Reduce | Potentially obsolete | 10 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 784.9M |
| 4300071652 TRIM SET,CONTROL VALVE,DWG.388-7684,FOR | C | Reduce | Excess | 10 SET | – | 2 / 5 | don't stock | – | 0% | −Rp 784.9M |
| 4300031463 TRIM SET,CONTROL VALVE,DWG.436-2734,FOR | B | Reduce | Non-moving | 10 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 784.9M |
| 4300025068 TRIM SET,CONTROL VALVE,DWG.303-4575,FOR | C | Reduce | Potentially obsolete | 10 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 784.9M |
| 4300006681 TRIM SET,CONTROL VALVE,DWG.922-1787,FOR | C | Reduce | Potentially obsolete | 10 SET | – | 5 / 8 | don't stock | – | 0% | −Rp 784.9M |
| 4300073797 TRIM SET,CONTROL VALVE,DWG.464-6753,FOR | C | Reduce | Potentially obsolete | 10 SET | – | 10 / 17 | don't stock | – | 0% | −Rp 784.9M |
| 4300051250 SLEEVE,SHAFT,DWG.267-6041,FOR PP-244A | C | Reduce | Potentially obsolete | 98 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 784.5M |
| 4100086624Long-lead FILTER ELEMENT,LUBE OIL,5MICRON,P/N FE-4 | A | ReorderNormal | Below reorder point | 3 EA | – | 1 / 2 | 3 / 3 / 6 | 3 by 01 Oct 2026 | 0% | Rp 20.4M |
| 4200002114 GLAND,CABLE,SIZE XL225,SS304 | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 2 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 183,915 |
| 4100066380Safety-critical SPRING,SAFETY VALVE,SIZE WR399,INCOLOY | A | ReorderNormal | Below reorder point | 3 EA | – | 0 / 0 | 3 / 3 / 5 | 2 by 01 Oct 2026 | 0% | Rp 17.6M |
| 4100078994 ANCHOR,REFRACTORY,SIZE ZA345,INCOLOY | A | Monitor | Critical insurance spare | 16 EA | – | 5 / 11 | 1,585 / 2,100 / 3,099 | – | 77% | – |
| 4200010213 FAN,COOLING MOTOR,DWG.610-5789,FOR PP-10 | A | ReorderNormal | Slow-moving | 1 EA | – | 1 / 3 | 1 / 1 / 2 | 1 by 01 Oct 2026 | 0% | Rp 1.3M |
| 4100088158 BLADE,ROTOR,TYPE XQ381,A182F11 | S | Reduce | Potentially obsolete | 2 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 763.0M |
| 4300017054 BLADE,ROTOR,DWG.183-8706,FOR KT-264A | S | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 763.0M |
| 4100088327 BLADE,ROTOR,MODEL PG71,PTFE | S | Reduce | Non-moving | 2 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 763.0M |
| 4300004988 BLADE,ROTOR,DWG.803-3537,FOR KT-460B | A | Reduce | Non-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 763.0M |
| 4300005215 BLADE,ROTOR,DWG.575-7405,FOR KT-460B | A | Reduce | Non-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 763.0M |
| 4300006021 BLADE,ROTOR,DWG.343-8299,FOR KT-460B | A | Reduce | Non-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 763.0M |
| 4300006272 BLADE,ROTOR,DWG.341-5369,FOR KT-460B | A | Reduce | Non-moving | 3 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 763.0M |
| 4300032230 BLADE,ROTOR,DWG.678-2550,FOR KT-624A | S | Reduce | Potentially obsolete | 2 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 763.0M |
| 4200008116 FAN,COOLING MOTOR,MODEL MW857,GRAPHITE | A | Reduce | Non-moving | 609 EA | – | 5 / 15 | 0 / 0 / 2 | – | 0% | −Rp 760.8M |
| 4100049438 POSITIONER,VALVE,MODEL BR940,NBR | S | Reduce | Potentially obsolete | 19 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 758.4M |
| 4300046616 SEAL,LABYRINTH,DWG.242-3301,FOR KC-308B | A | Reduce | Non-moving | 9 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 756.7M |
| 4300053925 SEAL,LABYRINTH,DWG.940-3242,FOR KC-371B | B | Reduce | Non-moving | 8 SET | – | 2 / 4 | don't stock | – | 0% | −Rp 756.7M |
| 4300051033 SEAL,LABYRINTH,DWG.654-1154,FOR KC-891A | S | Reduce | Potentially obsolete | 8 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 756.7M |
| 4300070007 SEAL,LABYRINTH,DWG.277-8792,FOR KT-513 | A | Reduce | Non-moving | 9 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 756.7M |
| 4300070626 SEAL,LABYRINTH,DWG.958-2094,FOR KT-513 | A | Reduce | Non-moving | 9 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 756.7M |
| 4100006207 SEAL,MECHANICAL,SIZE ZO162,PTFE | C | Reduce | Potentially obsolete | 8 SET | – | 2 / 4 | don't stock | – | 0% | −Rp 756.7M |
| 4300028653 SEAL,LABYRINTH,DWG.755-2334,FOR KC-419A | A | Reduce | Non-moving | 10 SET | – | 5 / 11 | 1 / 1 / 2 | – | 0% | −Rp 756.7M |
| 4300001416 SPRING,SAFETY VALVE,DWG.149-6378,FOR KT- | S | Reduce | Potentially obsolete | 85 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 749.6M |
| 4100035658 VALVE,GATE,4IN,150#,CF8,RF | B | Reduce | Non-moving | 285 EA | – | 5 / 9 | don't stock | – | 0% | −Rp 749.1M |
| 4100039125Long-lead VALVE,NEEDLE,1/4IN NPT,6000PSI,SS316 | B | ReorderNormal | Slow-moving | 2 EA | – | 1 / 2 | 2 / 2 / 4 | 2 by 01 Oct 2026 | 0% | Rp 4.4M |
| 4100001194Long-lead BEARING,BALL,ANGULAR,6209-2Z | A | ReorderNormal | Slow-moving | 5 EA | 2 | 1 / 2 | 6 / 7 / 14 | 7 by 01 Oct 2026 | 0% | Rp 9.3M |
| 4100047727 DIAPHRAGM,ACTUATOR,SIZE CL534,VITON | A | Reduce | Non-moving | 167 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 727.7M |
| 4300018625 RING,WEAR,DWG.598-7599,FOR PP-601 | B | Reduce | Non-moving | 89 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 720.3M |
| 4300068916 BEARING,JOURNAL,DWG.588-5367,FOR KC-732D | A | Reduce | Non-moving | 6 SET | 1 | 3 / 9 | 0 / 0 / 1 | – | 0% | −Rp 716.7M |
| 4100089925 VALVE,GOVERNOR,MODEL VX472,A105 | S | Reduce | Potentially obsolete | 3 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 714.9M |
| 4300017459 VALVE,GOVERNOR,DWG.848-9950,FOR KT-264A | S | Reduce | Potentially obsolete | 3 ASS | – | 2 / 4 | don't stock | – | 0% | −Rp 714.9M |
| 4300033590 VALVE,GOVERNOR,DWG.921-1411,FOR KT-624A | S | Reduce | Potentially obsolete | 3 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 714.9M |
| 4300043649 VALVE,GOVERNOR,DWG.592-8090,FOR KT-778A | S | Reduce | Potentially obsolete | 3 ASS | – | 0 / 0 | don't stock | – | 0% | −Rp 714.9M |
| 4300023159 VALVE,GOVERNOR,DWG.884-6598,FOR KT-856A | A | Reduce | Non-moving | 4 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 714.9M |
| 4300062932 VALVE,GOVERNOR,DWG.473-3303,FOR KT-875 | S | Reduce | Potentially obsolete | 3 ASS | – | 2 / 6 | don't stock | – | 0% | −Rp 714.9M |
| 4300031439 IMPELLER,DWG.308-5244,FOR PP-1886B | B | Reduce | Slow-moving | 8 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 714.7M |
| 4300007350 IMPELLER,DWG.698-8763,FOR PP-251C | A | Reduce | Non-moving | 8 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 714.7M |
| 4300046927 IMPELLER,DWG.372-3148,FOR PP-769B | A | Reduce | Non-moving | 8 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 714.7M |
| 4300051199 IMPELLER,DWG.437-3886,FOR PP-790A | A | Reduce | Non-moving | 8 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 714.7M |
| 4300059776Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.585-5835,FOR PRV | S | Reduce | Non-moving | 36 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 709.7M |
| 4100043731 TRIM SET,CONTROL VALVE,MODEL GP675,A105 | B | Reduce | Non-moving | 10 SET | – | 3 / 5 | 0 / 0 / 1 | – | 0% | −Rp 706.4M |
| 4300008311 TRIM SET,CONTROL VALVE,DWG.224-1556,FOR | C | Reduce | Potentially obsolete | 9 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 706.4M |
| 4300018687 TRIM SET,CONTROL VALVE,DWG.476-6639,FOR | S | Reduce | Potentially obsolete | 9 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 706.4M |