Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 60 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300059663 COUPLING,DWG.586-5543,FOR KC-984C | S | Reduce | Potentially obsolete | 18 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 154.0M |
| 4300026138 COUPLING,DWG.697-4877,FOR PP-1166B | A | Reduce | Non-moving | 19 SET | – | 5 / 8 | 0 / 0 / 1 | – | 0% | −Rp 154.0M |
| 4300072410 SLEEVE,SHAFT,DWG.457-8775,FOR PP-1546A | C | Reduce | Potentially obsolete | 19 EA | – | 10 / 19 | don't stock | – | 0% | −Rp 153.7M |
| 4300027195 SLEEVE,SHAFT,DWG.686-6690,FOR PP-1764 | B | Reduce | Non-moving | 20 EA | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 153.7M |
| 4100028820 PIPE,3/4IN,SCH80,CS,SMLS,6M LG | A | Reduce | Slow-moving | 128 LG | – | 1 / 3 | 6 / 6 / 14 | – | 0% | −Rp 152.5M |
| 4100001263 BEARING,BALL,ANGULAR,NU314-2Z | A | Reduce | Non-moving | 109 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 152.4M |
| 4100077863 BURNER TIP,TYPE OO148,INCOLOY | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 2 / 2 / 3 | – | 15% | – |
| 4100077689 BURNER TIP,MODEL LO15,NBR | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 2 / 2 / 3 | – | 15% | – |
| 4300030567 THERMOWELL,DWG.305-7475,FOR TEL-1354A | S | Reduce | Potentially obsolete | 25 EA | – | 10 / 17 | don't stock | – | 0% | −Rp 151.3M |
| 4300054681 THERMOWELL,DWG.930-8078,FOR TEL-688B-8 | C | Reduce | Potentially obsolete | 25 EA | – | 5 / 13 | don't stock | – | 0% | −Rp 151.3M |
| 4300036306Safety-criticalSign-off DISC,SAFETY VALVE,DWG.694-5145,FOR PRV-1 | S | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 150.5M |
| 4300021125Safety-criticalSign-off DISC,SAFETY VALVE,DWG.386-9182,FOR PRV-1 | C | Reduce | Non-moving | 13 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 150.5M |
| 4100010736Long-lead COUPLING,SIZE QT629,PTFE | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 2 / 2 / 3 | – | 15% | – |
| 4100036074 VALVE,GATE,1/4IN,150#,A216WCB,SW | A | Monitor | Critical insurance spare | 1 EA | – | 0 / 0 | 3 / 3 / 5 | – | 15% | – |
| 4300038754Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.378-7702,FOR PRV | B | Reduce | Non-moving | 18 EA | – | 10 / 29 | 0 / 0 / 1 | – | 0% | −Rp 149.9M |
| 4300037308Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.589-1587,FOR PRV | S | Reduce | Non-moving | 18 EA | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 149.9M |
| 4300050280Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.211-5339,FOR PRV | S | Reduce | Non-moving | 18 EA | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 149.9M |
| 4100046361 PACKING SET,VALVE,TYPE MD375,A105 | A | Reduce | Non-moving | 41 SET | – | 10 / 26 | 0 / 0 / 2 | – | 0% | −Rp 149.8M |
| 4100087494 FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-3 | S | Reduce | Potentially obsolete | 54 EA | – | 10 / 30 | don't stock | – | 0% | −Rp 149.7M |
| 4100048165 DIAPHRAGM,ACTUATOR,MODEL AZ298,NBR | B | Reduce | Non-moving | 35 EA | – | 10 / 17 | 0 / 0 / 1 | – | 0% | −Rp 149.0M |
| 4300053031 RING,WEAR,DWG.107-2129,FOR PP-169A | B | Reduce | Non-moving | 19 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 147.3M |
| 4100000129 BEARING,BALL,1ROW,DEEP GROOVE,6316 | A | Reduce | Excess | 168 EA | 213 | 60 / 115 | 29 / 42 / 83 | – | 0% | −Rp 147.3M |
| 4100036958 VALVE,GLOBE,1/2IN,300#,A105,SW | C | Reduce | Slow-moving | 57 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 147.2M |
| 4100086964 FILTER ELEMENT,AIR INTAKE,10MICRON,P/N F | S | Reduce | Potentially obsolete | 53 EA | – | 3 / 9 | don't stock | – | 0% | −Rp 146.9M |
| 4100053144Safety-criticalSign-off SOLENOID VALVE,TYPE EL663,MONEL | S | Reduce | Non-moving | 14 EA | – | 4 / 12 | 0 / 0 / 1 | – | 0% | −Rp 146.8M |
| 4100050952 SEAT RING,VALVE,TYPE VT620,A105 | B | Reduce | Non-moving | 14 EA | – | 3 / 9 | 0 / 0 / 1 | – | 0% | −Rp 146.6M |
| 4300056433 SEAT RING,VALVE,DWG.313-1759,FOR FCV-154 | A | Reduce | Slow-moving | 19 EA | – | 0 / 0 | 3 / 3 / 6 | – | 0% | −Rp 146.6M |
| 4300050837 SEAT RING,VALVE,DWG.651-5221,FOR FCV-556 | A | Reduce | Non-moving | 14 EA | – | 3 / 9 | 0 / 0 / 1 | – | 0% | −Rp 146.6M |
| 4100050838 SEAT RING,VALVE,MODEL XO585,MONEL | C | Reduce | Potentially obsolete | 13 EA | – | 10 / 14 | don't stock | – | 0% | −Rp 146.6M |
| 4300038310 SEAT RING,VALVE,DWG.259-7914,FOR PCV-184 | S | Reduce | Potentially obsolete | 13 EA | – | 3 / 7 | don't stock | – | 0% | −Rp 146.6M |
| 4300067966 SEAT RING,VALVE,DWG.238-6542,FOR LCV-115 | C | Reduce | Potentially obsolete | 13 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 146.6M |
| 4300063051 POSITIONER,VALVE,DWG.578-3598,FOR TCV-13 | C | Reduce | Potentially obsolete | 4 EA | – | 2 / 6 | don't stock | – | 0% | −Rp 146.2M |
| 4100042125 TUBING,SIZE PG419,PTFE | C | Reduce | Potentially obsolete | 425 M | – | 10 / 27 | don't stock | – | 0% | −Rp 145.9M |
| 4100010356 SLEEVE,SHAFT,TYPE NJ936,SS316 | B | Reduce | Non-moving | 19 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 145.6M |
| 4300030981 SLEEVE,SHAFT,DWG.649-1110,FOR PP-1735 | A | Reduce | Non-moving | 20 EA | – | 4 / 9 | 1 / 1 / 2 | – | 0% | −Rp 145.6M |
| 4300049225 SLEEVE,SHAFT,DWG.806-7198,FOR PP-1744 | C | Reduce | Non-moving | 18 EA | – | 10 / 19 | don't stock | – | 0% | −Rp 145.6M |
| 4100011107 COUPLING,SIZE GX803,SS316 | S | Reduce | Potentially obsolete | 17 SET | – | 5 / 10 | don't stock | – | 0% | −Rp 145.4M |
| 4300020073 COUPLING,DWG.578-4632,FOR KC-435A | A | Reduce | Non-moving | 18 SET | – | 4 / 10 | 0 / 0 / 1 | – | 0% | −Rp 145.4M |
| 4300016315 COUPLING,DWG.636-8765,FOR KC-879A | S | Reduce | Potentially obsolete | 17 SET | – | 0 / 0 | don't stock | – | 0% | −Rp 145.4M |
| 4300058059 COUPLING,DWG.637-4074,FOR PP-1325 | B | Reduce | Non-moving | 18 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 145.4M |
| 4300028231Safety-criticalLong-leadSign-off NOZZLE,SAFETY VALVE,DWG.476-9874,FOR PRV | B | Reduce | Slow-moving | 5 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 145.4M |
| 4300019493 THERMOWELL,DWG.183-2591,FOR TEL-421-46 | A | Reduce | Non-moving | 24 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 145.2M |
| 4100079208 ANCHOR,REFRACTORY,TYPE DS723,SS316 | A | Monitor | Critical insurance spare | 13 EA | – | 10 / 17 | 646 / 700 / 1,050 | – | 14% | – |
| 4300014637Safety-criticalLong-leadSign-off DISC,SAFETY VALVE,DWG.813-1279,FOR PRV-1 | B | Reduce | Non-moving | 5 EA | 2 | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 144.2M |
| 4100029297 PIPE,2IN,STD,P11,SMLS,6M LG | B | Reduce | Non-moving | 87 LG | – | 1 / 2 | 0 / 0 / 3 | – | 0% | −Rp 143.8M |
| 4100046788 PACKING SET,VALVE,MODEL BW935,SS304 | A | Reduce | Non-moving | 39 SET | – | 10 / 20 | 0 / 0 / 2 | – | 0% | −Rp 142.1M |
| 4300033883Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.911-2455,FOR PRV | S | Reduce | Non-moving | 8 EA | – | 3 / 5 | 0 / 0 / 1 | – | 0% | −Rp 141.9M |
| 4300058509Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.336-6377,FOR PRV | S | Reduce | Non-moving | 8 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 141.9M |
| 4300031621Safety-criticalSign-off NOZZLE,SAFETY VALVE,DWG.637-3464,FOR PRV | S | Reduce | Non-moving | 8 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 141.9M |
| 4300051690Safety-criticalSign-off SPRING,SAFETY VALVE,DWG.934-1532,FOR PRV | S | Reduce | Non-moving | 17 EA | – | 5 / 13 | 0 / 0 / 1 | – | 0% | −Rp 141.1M |