Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 96 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300016865 COUPLING,DWG.326-8403,FOR PP-1701B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300037402 COUPLING,DWG.747-2268,FOR PP-500 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300055507 COUPLING,DWG.979-9254,FOR PP-614 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4200006897 FAN,COOLING MOTOR,TYPE HK778,CS | A | Reduce | Non-moving | 10 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 10.0M |
| 4200010323 FAN,COOLING MOTOR,DWG.549-1187,FOR PP-15 | A | Reduce | Non-moving | 10 EA | – | 10 / 15 | 0 / 0 / 2 | – | 0% | −Rp 10.0M |
| 4200011272 FAN,COOLING MOTOR,DWG.448-8256,FOR PP-15 | A | Reduce | Non-moving | 10 EA | – | 2 / 6 | 0 / 0 / 2 | – | 0% | −Rp 10.0M |
| 4100046191Safety-critical PACKING SET,VALVE,TYPE HG481,A105 | A | Monitor | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 2 | reorder ~27 Nov 2045 | 1% | – |
| 4100026054 STUDBOLT,7/8INX35MM,B8M/8M | A | Monitor | Critical insurance spare | 8 EA | – | 3 / 4 | 27 / 27 / 54 | – | 1% | – |
| 4100002789 BEARING,ROLLER,CYL,1ROW,6304-2Z | A | Reduce | Non-moving | 11 EA | – | 5 / 16 | 2 / 2 / 4 | – | 0% | −Rp 10.0M |
| 4100004458 BEARING,ROLLER,CYL,1ROW,6208 | B | Reduce | Non-moving | 9 EA | – | 5 / 16 | 0 / 0 / 2 | – | 0% | −Rp 10.0M |
| 4100062937Long-lead THERMOWELL,TYPE QW45,PTFE | B | Reduce | Non-moving | 3 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 9.9M |
| 4300027385 SLEEVE,SHAFT,DWG.127-2588,FOR PP-1348 | C | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100107742 OIL,LUBRICANT,ISO VG 32,MINERAL,5L | A | Monitor | Critical insurance spare | 6 L | – | 1 / 3 | 11 / 11 / 22 | – | 1% | – |
| 4100026910 STUDBOLT,1/2INX75MM,B8M/8M | C | Monitor | Potentially obsolete | 7 EA | – | 3 / 9 | 0 / 0 / 27 | reorder ~03 Jul 2027 | 2% | – |
| 4100018226 GASKET,RING,3/4IN,600#,PTFE | A | Monitor | Critical insurance spare | 1 EA | – | 0 / 0 | 4 / 4 / 8 | – | 1% | – |
| 4300018929 TRIM SET,CONTROL VALVE,DWG.840-7597,FOR | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100016079 GASKET,SHEET,1/4IN,600#,GRAPHITE | C | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 4 | – | 2% | – |
| 4300051888 TRAY VALVE,DWG.346-8213,FOR CL-961 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 1% | – |
| 4100056376Long-lead TRANSMITTER,PRESS,TYPE XY973,SS316 | A | Monitor | Healthy | 3 EA | 1 | 1 / 2 | 3 / 3 / 6 | reorder ~09 May 2027 | 1% | – |
| 4100042383 TUBING,SIZE HA48,SS304 | C | Reduce | Potentially obsolete | 28 M | – | 10 / 31 | don't stock | – | 0% | −Rp 9.6M |
| 4300026616 IMPELLER,DWG.780-8472,FOR PP-1470A | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4300035485 IMPELLER,DWG.940-9769,FOR PP-1659A | C | Maintain | No stock needed | 0 EA | – | 2 / 3 | don't stock | – | 2% | – |
| 4300056136 COUPLING,DWG.642-6383,FOR KC-588 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300056167 COUPLING,DWG.244-2219,FOR KC-588 | A | Monitor | Insurance gap | 0 SET | – | 2 / 6 | 0 / 0 / 1 | – | 1% | – |
| 4300056300 COUPLING,DWG.927-2514,FOR KC-588 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300048779 SEAL,LABYRINTH,DWG.670-5269,FOR KC-178A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300048801 SEAL,LABYRINTH,DWG.563-8963,FOR KC-178A | A | Monitor | Insurance gap | 0 SET | – | 4 / 10 | 0 / 0 / 1 | – | 1% | – |
| 4300069038 SEAL,LABYRINTH,DWG.460-5599,FOR KC-250D | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300051806 SEAL,LABYRINTH,DWG.872-5342,FOR KC-397A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300024499 SEAL,LABYRINTH,DWG.228-2375,FOR KC-426D | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300006510 SEAL,LABYRINTH,DWG.652-5933,FOR KC-663A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300052693 SEAL,LABYRINTH,DWG.112-7319,FOR KC-669 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300002798 SEAL,LABYRINTH,DWG.665-2980,FOR KC-930C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300002935 SEAL,LABYRINTH,DWG.266-1742,FOR KC-930C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300065567 SEAL,LABYRINTH,DWG.563-3958,FOR KC-636C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300019258 TRIM SET,CONTROL VALVE,DWG.145-4513,FOR | A | Monitor | Insurance gap | 0 SET | – | 1 / 2 | 0 / 0 / 1 | – | 1% | – |
| 4300019260 TRIM SET,CONTROL VALVE,DWG.220-7629,FOR | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300036582 TRIM SET,CONTROL VALVE,DWG.693-9981,FOR | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300032272 BLADE,ROTOR,DWG.133-8140,FOR KT-624A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4100088370 BLADE,ROTOR,SIZE UY54,A182F11 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4300032379 BLADE,ROTOR,DWG.675-8860,FOR KT-624A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4300032504 BLADE,ROTOR,DWG.450-8781,FOR KT-624A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4300032571 BLADE,ROTOR,DWG.974-6989,FOR KT-624A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4300032716 BLADE,ROTOR,DWG.637-8023,FOR KT-624A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4300032918 BLADE,ROTOR,DWG.962-9409,FOR KT-624A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4300033502 BLADE,ROTOR,DWG.663-6572,FOR KT-624A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4300033689 BLADE,ROTOR,DWG.943-3795,FOR KT-624A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4100102446 ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-B | B | Reduce | Excess | 131 CAN | – | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 8.8M |
| 4100082235 BEARING,JOURNAL,MODEL QV727,PTFE | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4100025001 STUDBOLT,3/4INX55MM,B7/2H | A | Monitor | Critical insurance spare | 12 EA | – | 3 / 9 | 27 / 27 / 54 | – | 1% | – |