Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 95 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100096829 DEMISTER PAD,MODEL KI669,PTFE | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100083294 BEARING,THRUST PAD,TYPE WI882,CS | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4300048986 TRIM SET,CONTROL VALVE,DWG.686-2886,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300009823Safety-criticalLong-leadSign-off SPRING,SAFETY VALVE,DWG.266-5188,FOR PRV | C | Reduce | Non-moving | 3 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 10.8M |
| 4300034688Safety-criticalLong-leadSign-off NOZZLE,SAFETY VALVE,DWG.749-8039,FOR PRV | B | Reduce | Slow-moving | 3 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 10.8M |
| 4100013078 RING,WEAR,MODEL XH164,A182F11 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100002400Long-lead BEARING,BALL,ANGULAR,NU315 C3 | A | Reduce | Non-moving | 12 EA | – | 10 / 14 | 0 / 0 / 2 | – | 0% | −Rp 10.7M |
| 4100107615 OIL,LUBRICANT,ISO VG 68,MINERAL,20L | A | Monitor | Insurance gap | 0 L | – | 10 / 27 | 11 / 11 / 22 | – | 1% | – |
| 4100012941 RING,WEAR,TYPE MU603,PTFE | C | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300051276 RING,WEAR,DWG.907-6913,FOR PP-244A | C | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4200001501 GLAND,CABLE,MODEL AK496,NBR | A | Reduce | Slow-moving | 64 EA | – | 1 / 3 | 4 / 4 / 6 | – | 0% | −Rp 10.7M |
| 4100076437 CERAMIC FIBER,BLANKET,50T,96KG/M3,1430C | A | Reduce | Non-moving | 12 RL | – | 2 / 6 | 2 / 2 / 4 | – | 0% | −Rp 10.7M |
| 4100076909 CERAMIC FIBER,BLANKET,25T,96KG/M3,1430C | S | Reduce | Potentially obsolete | 10 RL | – | 2 / 5 | 0 / 0 / 2 | – | 0% | – |
| 4100041847 TUBING,MODEL NA608,SS316 | A | Reduce | Slow-moving | 81 M | – | 3 / 7 | 0 / 0 / 50 | – | 0% | −Rp 10.6M |
| 4300000821 SEAL,LABYRINTH,DWG.894-1124,FOR KT-202 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4100064605 GAUGE,PRESSURE,0-16KG/CM2,4IN DIAL | C | Reduce | Potentially obsolete | 4 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 8.0M |
| 4100064989 GAUGE,PRESSURE,0-40KG/CM2,4IN DIAL | C | Reduce | Potentially obsolete | 4 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 10.6M |
| 4100091787 GREASE,LITHIUM,NLGI 1,1KG | C | Reduce | Non-moving | 59 KG | – | 10 / 32 | don't stock | – | 0% | −Rp 10.5M |
| 4100036104 VALVE,GATE,1/4IN,150#,A105,RF | C | Reduce | Potentially obsolete | 4 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 10.5M |
| 4100036716 VALVE,GLOBE,10IN,150#,A216WCB,RF | C | Reduce | Potentially obsolete | 4 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 10.5M |
| 4100035345 VALVE,GATE,3IN,300#,A216WCB,SW | C | Reduce | Potentially obsolete | 6 EA | – | 2 / 4 | 0 / 0 / 2 | – | 0% | −Rp 10.5M |
| 4100038452 VALVE,NEEDLE,3/4IN ODT,3000PSI,SS316 | A | Reduce | Non-moving | 6 EA | – | 5 / 8 | 0 / 0 / 2 | – | 0% | −Rp 10.5M |
| 4100035435 VALVE,GATE,1-1/2IN,300#,CF8,SW | B | Reduce | Non-moving | 4 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 10.5M |
| 4100018139 GASKET,SW,8IN,300#,GR/304 | B | Reduce | Slow-moving | 53 EA | – | 1 / 2 | 2 / 2 / 4 | – | 0% | −Rp 10.5M |
| 4300011669 SPRING,SAFETY VALVE,DWG.752-4162,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 5% | – |
| 4300032026 SEAL,LABYRINTH,DWG.762-4430,FOR KC-458D | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 5% | – |
| 4100028249 PIPE,10IN,STD,SS316,SMLS,6M LG | A | Reduce | Non-moving | 12 LG | – | 10 / 23 | 3 / 3 / 6 | – | 0% | −Rp 10.3M |
| 4100028604 PIPE,10IN,SCH160,CS,SMLS,6M LG | B | Reduce | Non-moving | 9 LG | – | 4 / 12 | 0 / 0 / 3 | – | 0% | −Rp 10.3M |
| 4100029434 PIPE,1/2IN,SCH160,SS316,SMLS,6M LG | A | Reduce | Non-moving | 9 LG | – | 2 / 4 | 0 / 0 / 3 | – | 0% | −Rp 10.3M |
| 4300004973 VALVE,GOVERNOR,DWG.152-9871,FOR KT-460B | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300005024 VALVE,GOVERNOR,DWG.389-4197,FOR KT-460B | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300005044 VALVE,GOVERNOR,DWG.945-2367,FOR KT-460B | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300005174 VALVE,GOVERNOR,DWG.300-6426,FOR KT-460B | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300005622 VALVE,GOVERNOR,DWG.793-2356,FOR KT-460B | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300005842 VALVE,GOVERNOR,DWG.625-8786,FOR KT-460B | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300006048 VALVE,GOVERNOR,DWG.607-3033,FOR KT-460B | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100090294 VALVE,GOVERNOR,SIZE CF366,GRAPHITE | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300006165 VALVE,GOVERNOR,DWG.125-3029,FOR KT-460B | A | Monitor | Insurance gap | 0 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300006197 VALVE,GOVERNOR,DWG.861-5683,FOR KT-460B | A | Monitor | Insurance gap | 0 ASS | – | 10 / 23 | 0 / 0 / 1 | – | 1% | – |
| 4100094338 TUBE PLUG,EXCHANGER,TYPE OE560,CS | B | Monitor | Insurance gap | 0 EA | – | 2 / 5 | 1 / 1 / 2 | – | 1% | – |
| 4100059152 TRANSMITTER,TEMP,TYPE ZP451,PTFE | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100033669 FLANGE,WN,10IN,150#,A105,RF | C | Reduce | Potentially obsolete | 11 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 10.2M |
| 4100014123Safety-criticalSign-off GASKET,SHEET,1/4IN,150#,PTFE | A | Reduce | Excess | 150 EA | – | 72 / 161 | 18 / 22 / 84 | – | 0% | −Rp 10.1M |
| 4300034961 IMPELLER,DWG.184-9348,FOR PP-154A | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300063596 IMPELLER,DWG.116-4041,FOR PP-474A | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300063610 IMPELLER,DWG.985-7212,FOR PP-474A | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100015477 GASKET,SW,8IN,600#,GR/304 | A | Monitor | Insurance gap | 0 EA | – | 4 / 7 | 4 / 4 / 8 | – | 1% | – |
| 4200005476 LAMP,LED,9W,220VAC,T8 | C | Reduce | Potentially obsolete | 25 EA | – | 4 / 13 | don't stock | – | 0% | −Rp 10.1M |
| 4100007150 IMPELLER,TYPE AS185,CS | A | Monitor | Critical insurance spare | 1 EA | – | 0 / 0 | 1 / 1 / 2 | – | 1% | – |
| 4100108190 OIL,LUBRICANT,ISO VG 220,SYNTHETIC,1L | A | Monitor | Critical insurance spare | 2 L | – | 2 / 4 | 11 / 11 / 22 | – | 1% | – |