Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 94 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300031585 SEAT RING,VALVE,DWG.819-9029,FOR FCV-114 | C | Reduce | Potentially obsolete | 1 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 11.3M |
| 4300050478 SEAT RING,VALVE,DWG.579-3976,FOR FCV-314 | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 11.3M |
| 4100050695 SEAT RING,VALVE,MODEL NN730,VITON | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 11.3M |
| 4300059189 SEAT RING,VALVE,DWG.740-8208,FOR FCV-885 | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 11.3M |
| 4300031808 SEAT RING,VALVE,DWG.273-6613,FOR LCV-134 | B | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 11.3M |
| 4300045578 SEAT RING,VALVE,DWG.120-3061,FOR LCV-138 | C | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 11.3M |
| 4300044357 SEAT RING,VALVE,DWG.500-4795,FOR LCV-157 | C | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 11.3M |
| 4100050784 SEAT RING,VALVE,TYPE JN729,MONEL | B | Reduce | Non-moving | 2 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 11.3M |
| 4300038143 SEAT RING,VALVE,DWG.636-7976,FOR LCV-787 | C | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 11.3M |
| 4300046897 SEAT RING,VALVE,DWG.238-3466,FOR PCV-106 | C | Reduce | Potentially obsolete | 1 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 11.3M |
| 4300025670 SEAT RING,VALVE,DWG.235-4321,FOR PCV-114 | C | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 11.3M |
| 4300058809 SEAT RING,VALVE,DWG.493-7463,FOR PCV-135 | B | Reduce | Non-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 11.3M |
| 4300055626 SEAT RING,VALVE,DWG.597-4186,FOR PCV-154 | A | Reduce | Non-moving | 2 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 11.3M |
| 4300034620 SEAT RING,VALVE,DWG.400-4051,FOR PCV-157 | S | Reduce | Potentially obsolete | 1 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 11.3M |
| 4300028515 SEAT RING,VALVE,DWG.866-8514,FOR PCV-197 | C | Reduce | Potentially obsolete | 1 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 11.3M |
| 4300048233 SEAT RING,VALVE,DWG.374-4384,FOR PCV-266 | B | Reduce | Non-moving | 1 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 11.3M |
| 4100051046 SEAT RING,VALVE,TYPE UQ136,NBR | A | Reduce | Non-moving | 3 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 11.3M |
| 4100093478 TUBE PLUG,EXCHANGER,MODEL YT163,INCOLOY | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 1% | – |
| 4100093539 TUBE PLUG,EXCHANGER,TYPE MF296,GRAPHITE | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 1% | – |
| 4300036031 BEARING,THRUST PAD,DWG.178-7868,FOR KC-6 | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300058175 RING,WEAR,DWG.886-2546,FOR PP-705 | S | Monitor | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 6% | – |
| 4100044071 TRIM SET,CONTROL VALVE,SIZE AD814,SS316 | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300065525 TRIM SET,CONTROL VALVE,DWG.797-9717,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300000343 BLADE,ROTOR,DWG.317-1756,FOR KT-202 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4300000771 BLADE,ROTOR,DWG.130-8919,FOR KT-202 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4300000803 BLADE,ROTOR,DWG.347-5923,FOR KT-202 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4300000944 BLADE,ROTOR,DWG.266-7007,FOR KT-202 | S | Maintain | No stock needed | 0 SET | – | 3 / 9 | don't stock | – | 6% | – |
| 4100088504 BLADE,ROTOR,MODEL CL34,GRAPHITE | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4300001015 BLADE,ROTOR,DWG.394-7773,FOR KT-202 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4100025139 STUDBOLT,1INX100MM,B8M/8M | A | Monitor | Critical insurance spare | 3 EA | – | 2 / 4 | 27 / 27 / 54 | – | 1% | – |
| 4100086531 FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-6 | A | Reduce | Non-moving | 11 EA | – | 4 / 13 | 3 / 3 / 7 | – | 0% | −Rp 11.1M |
| 4200008860 CABLE,INSTRUMENT,1PR X 1.5MM2,ARMOURED | C | Monitor | Slow-moving | 10 M | – | 9 / 14 | 0 / 0 / 50 | reorder ~06 Aug 2027 | 2% | – |
| 4300026809 COUPLING,DWG.655-8985,FOR KC-505D | S | Reduce | Potentially obsolete | 5 SET | – | 2 / 6 | don't stock | – | 0% | −Rp 11.1M |
| 4100108579 OIL,LUBRICANT,ISO VG 46,MINERAL,1L | A | Monitor | Critical insurance spare | 6 L | – | 5 / 10 | 11 / 11 / 22 | – | 1% | – |
| 4100002882 BEARING,ROLLER,CYL,1ROW,6205-2Z | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 1% | – |
| 4100093789 TUBE PLUG,EXCHANGER,TYPE NV599,CS | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 1% | – |
| 4200001717 GLAND,CABLE,SIZE MJ424,SS316 | B | Reduce | Slow-moving | 63 EA | – | 1 / 2 | 2 / 2 / 3 | – | 0% | −Rp 11.0M |
| 4300041164 TRIM SET,CONTROL VALVE,DWG.688-2327,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300041192 TRIM SET,CONTROL VALVE,DWG.694-8859,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4100006205 SEAL,MECHANICAL,TYPE YN893,A182F11 | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300028197Long-lead SLEEVE,SHAFT,DWG.637-6446,FOR PP-1426A | B | Reduce | Slow-moving | 5 EA | 4 | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 11.0M |
| 4100067259 SPRING,SAFETY VALVE,TYPE QL387,CS | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 5% | – |
| 4300010765 SPRING,SAFETY VALVE,DWG.533-9432,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 5% | – |
| 4100066469 SPRING,SAFETY VALVE,MODEL WQ236,SS316 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 5% | – |
| 4300011454 SPRING,SAFETY VALVE,DWG.750-8645,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 5% | – |
| 4300011655 SPRING,SAFETY VALVE,DWG.349-4595,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 5% | – |
| 4100015150 GASKET,RING,8IN,150#,PTFE | A | Reduce | Excess | 66 EA | – | 1 / 2 | 10 / 10 / 15 | – | 0% | −Rp 10.9M |
| 4300020513 COUPLING,DWG.492-4578,FOR KC-886D | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300020561 COUPLING,DWG.213-3205,FOR KC-886D | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300020615 COUPLING,DWG.246-9595,FOR KC-886D | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |