Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 93 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300010692 SEAL,LABYRINTH,DWG.718-1510,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4300010929 SEAL,LABYRINTH,DWG.237-3922,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4100085082 SEAL,LABYRINTH,MODEL UY552,SS316 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4300011445 SEAL,LABYRINTH,DWG.363-7814,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4300011709 SEAL,LABYRINTH,DWG.542-3632,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4300011719 SEAL,LABYRINTH,DWG.809-4331,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4300053407 BEARING,JOURNAL,DWG.193-1402,FOR KC-773A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4300053443 BEARING,THRUST PAD,DWG.385-2491,FOR KC-7 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4300053502 BEARING,THRUST PAD,DWG.304-4373,FOR KC-7 | S | Maintain | No stock needed | 0 SET | – | 1 / 3 | don't stock | – | 6% | – |
| 4100054041Safety-criticalSign-off SWITCH,LIMIT,MODEL XF109,SS304 | A | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 11.9M |
| 4100054516 SWITCH,LIMIT,MODEL RH482,A105 | B | Reduce | Non-moving | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 11.9M |
| 4100054667 SWITCH,LIMIT,TYPE OH852,A182F11 | A | Reduce | Non-moving | 4 EA | – | 3 / 4 | 0 / 0 / 2 | – | 0% | −Rp 11.9M |
| 4100054492Safety-criticalSign-off SWITCH,LIMIT,SIZE KW986,GRAPHITE | S | Reduce | Non-moving | 4 EA | – | 4 / 8 | 0 / 0 / 2 | – | 0% | −Rp 11.9M |
| 4300002444 TRIM SET,CONTROL VALVE,DWG.944-7704,FOR | S | Monitor | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4100074207 CASTABLE,REFRACTORY,LW,1300DEG C | S | Maintain | No stock needed | 0 KG | – | 0 / 0 | don't stock | – | 6% | – |
| 4300073868Long-lead COUPLING,DWG.939-2872,FOR PP-467A | B | Reduce | Non-moving | 3 SET | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 11.7M |
| 4300061184 SEAL,LABYRINTH,DWG.652-3507,FOR KC-582B | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 6% | – |
| 4100026000 STUDBOLT,1/2INX90MM,B8M/8M | A | Monitor | Critical insurance spare | 3 EA | – | 2 / 6 | 27 / 27 / 54 | – | 1% | – |
| 4100045695 PACKING SET,VALVE,TYPE DI243,VITON | A | Reduce | Non-moving | 5 SET | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 11.5M |
| 4100046052 PACKING SET,VALVE,MODEL JU612,VITON | A | Reduce | Slow-moving | 6 SET | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 11.5M |
| 4100045475Safety-criticalSign-off PACKING SET,VALVE,SIZE QS820,VITON | A | Reduce | Non-moving | 5 SET | – | 4 / 6 | 0 / 0 / 2 | – | 0% | −Rp 11.5M |
| 4100046320 PACKING SET,VALVE,SIZE DH586,A105 | B | Reduce | Non-moving | 5 SET | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 11.5M |
| 4100046789 PACKING SET,VALVE,MODEL FT304,GRAPHITE | A | Reduce | Non-moving | 5 SET | – | 3 / 10 | 0 / 0 / 2 | – | 0% | −Rp 11.5M |
| 4100026631 STUDBOLT,3/4INX50MM,B8M/8M | A | Monitor | Critical insurance spare | 2 EA | – | 2 / 3 | 0 / 0 / 27 | reorder ~27 May 2027 | 1% | – |
| 4100025977 STUDBOLT,3/4INX95MM,B16/4 | A | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 27 / 27 / 54 | – | 1% | – |
| 4100062767 THERMOWELL,MODEL UD546,SS304 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100030209 ELBOW,45DEG,3IN,3000#,SS316,SW | C | Reduce | Potentially obsolete | 52 EA | – | 3 / 7 | don't stock | – | 0% | −Rp 11.4M |
| 4200001614 GLAND,CABLE,MODEL UN365,CS | A | Reduce | Non-moving | 64 EA | – | 10 / 31 | 0 / 0 / 2 | – | 0% | −Rp 11.4M |
| 4100004826 BEARING,BALL,1ROW,DEEP GROOVE,6314 | A | Reduce | Non-moving | 10 EA | – | 2 / 4 | 0 / 0 / 2 | – | 0% | −Rp 11.4M |
| 4100001740 BEARING,BALL,1ROW,DEEP GROOVE,6310 | B | Reduce | Non-moving | 10 EA | – | 2 / 4 | 0 / 0 / 2 | – | 0% | −Rp 11.4M |
| 4100004049 BEARING,BALL,ANGULAR,6212 C3 | A | Reduce | Non-moving | 10 EA | – | 2 / 5 | 0 / 0 / 2 | – | 0% | −Rp 11.4M |
| 4300059618 COUPLING,DWG.728-5782,FOR KC-984C | S | Reduce | Potentially obsolete | 2 SET | 1 | 1 / 2 | don't stock | – | 0% | −Rp 11.4M |
| 4300053240 BEARING,JOURNAL,DWG.666-8870,FOR KC-222B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300053330 BEARING,JOURNAL,DWG.568-3350,FOR KC-222B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300053343 BEARING,JOURNAL,DWG.406-6868,FOR KC-222B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300053374 BEARING,THRUST PAD,DWG.627-7052,FOR KC-2 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300049551 BEARING,THRUST PAD,DWG.506-4467,FOR KC-3 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100083890 BEARING,THRUST PAD,TYPE RX33,VITON | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300016430 BEARING,THRUST PAD,DWG.624-7767,FOR KC-4 | A | Monitor | Insurance gap | 0 SET | – | 5 / 12 | 0 / 0 / 1 | – | 1% | – |
| 4300016488 BEARING,JOURNAL,DWG.539-8869,FOR KC-447 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300016539 BEARING,JOURNAL,DWG.455-2394,FOR KC-447 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300016583 BEARING,THRUST PAD,DWG.152-5524,FOR KC-4 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300016613 BEARING,THRUST PAD,DWG.516-3405,FOR KC-4 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300016648 BEARING,JOURNAL,DWG.212-8574,FOR KC-447 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300044492 BEARING,THRUST PAD,DWG.585-6191,FOR KC-7 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100041945 TUBING,MODEL KO708,SS316 | C | Monitor | Slow-moving | 18 M | – | 11 / 24 | 0 / 0 / 100 | reorder ~01 Jun 2027 | 3% | – |
| 4100053326Safety-criticalSign-off SOLENOID VALVE,TYPE XD130,CS | S | Reduce | Non-moving | 2 EA | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 11.3M |
| 4100052737Safety-criticalSign-off SOLENOID VALVE,MODEL XZ342,VITON | B | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 11.3M |
| 4100052838Safety-criticalSign-off SOLENOID VALVE,MODEL QK459,NBR | A | Reduce | Slow-moving | 3 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 11.3M |
| 4100053061Safety-criticalSign-off SOLENOID VALVE,TYPE UF761,INCOLOY | B | Reduce | Non-moving | 2 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 11.3M |