Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 99 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300029041 COUPLING,DWG.276-6177,FOR PP-1952C | B | Reduce | Non-moving | 1 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 8.6M |
| 4300035141 COUPLING,DWG.500-9345,FOR PP-1977 | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 8.6M |
| 4100011361 COUPLING,SIZE QW663,SS304 | S | Reduce | Potentially obsolete | 1 SET | – | 1 / 2 | don't stock | – | 0% | −Rp 8.6M |
| 4300071351 COUPLING,DWG.539-5973,FOR PP-301C | B | Reduce | Non-moving | 2 SET | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 8.6M |
| 4300049256 COUPLING,DWG.355-7152,FOR PP-339A | B | Reduce | Non-moving | 3 SET | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 8.6M |
| 4100011269 COUPLING,TYPE YX773,GRAPHITE | B | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 8.6M |
| 4300068516 COUPLING,DWG.470-8531,FOR PP-588 | A | Reduce | Non-moving | 2 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 8.6M |
| 4300055538 COUPLING,DWG.936-9155,FOR PP-614 | A | Reduce | Non-moving | 2 SET | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 8.6M |
| 4100001579 BEARING,BALL,1ROW,DEEP GROOVE,6318-2Z | S | Reduce | Potentially obsolete | 6 EA | – | 4 / 9 | don't stock | – | 0% | −Rp 8.5M |
| 4100001325 BEARING,BALL,1ROW,DEEP GROOVE,6311BDB | A | Reduce | Non-moving | 8 EA | – | 3 / 9 | 0 / 0 / 2 | – | 0% | −Rp 8.5M |
| 4100003382 BEARING,ROLLER,CYL,1ROW,NU307 C3 | S | Reduce | Potentially obsolete | 6 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 8.5M |
| 4100003770 BEARING,BALL,1ROW,DEEP GROOVE,6318 | S | Reduce | Potentially obsolete | 6 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 8.5M |
| 4100003236 BEARING,ROLLER,CYL,1ROW,NU314 | A | Reduce | Non-moving | 8 EA | – | 4 / 10 | 0 / 0 / 2 | – | 0% | −Rp 8.5M |
| 4100027518 STUDBOLT,7/8INX85MM,B8M/8M | B | Reduce | Non-moving | 253 EA | – | 2 / 6 | 0 / 0 / 27 | – | 0% | −Rp 8.5M |
| 4200004768 LAMP,LED,36W,220VAC,E27 | A | Reduce | Non-moving | 23 EA | – | 5 / 11 | 0 / 0 / 2 | – | 0% | −Rp 8.5M |
| 4300000514 SPRING,SAFETY VALVE,DWG.148-3141,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 4% | – |
| 4300000540 SPRING,SAFETY VALVE,DWG.206-1629,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 4% | – |
| 4300000663 SPRING,SAFETY VALVE,DWG.896-5339,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 4% | – |
| 4300000949 SPRING,SAFETY VALVE,DWG.976-8582,FOR KT- | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 4% | – |
| 4100067878Safety-criticalLong-leadSign-off DISC,SAFETY VALVE,TYPE WO963,CS | A | Reduce | Excess | 9 EA | 1 | 0 / 0 | 5 / 5 / 7 | – | 0% | −Rp 8.4M |
| 4100101678 ANTIRUST,SPRAY TYPE,400ML/CAN,TYPE-B | C | Reduce | Excess | 252 CAN | – | 148 / 297 | 11 / 16 / 157 | – | 0% | −Rp 8.4M |
| 4100047044 DIAPHRAGM,ACTUATOR,TYPE LB157,MONEL | C | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100077548 BURNER TIP,SIZE ML394,MONEL | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 4% | – |
| 4100078032 BURNER TIP,MODEL BY79,SS316 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 4% | – |
| 4100073049 FIREBRICK,INSUL,28,76T,114W,230L | A | Maintain | Critical insurance spare | 738 EA | – | 10 / 26 | 343 / 396 / 792 | – | 1% | – |
| 4300054483 COUPLING,DWG.995-8673,FOR KC-513 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 4% | – |
| 4100033853 FLANGE,BLIND,1/4IN,300#,SS316,RF | C | Reduce | Potentially obsolete | 9 EA | – | 4 / 12 | don't stock | – | 0% | −Rp 8.3M |
| 4100078340 BURNER TIP,TYPE LR791,GRAPHITE | A | Monitor | Critical insurance spare | 2 EA | – | 3 / 9 | 3 / 3 / 5 | – | 1% | – |
| 4100086490 FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-7 | S | Reduce | Non-moving | 3 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 8.3M |
| 4100087695 FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-3 | S | Reduce | Potentially obsolete | 3 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 8.3M |
| 4200011216 FAN,COOLING MOTOR,DWG.592-8828,FOR KC-37 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 2 | – | 1% | – |
| 4300073587 DEMISTER PAD,DWG.862-2940,FOR VD-1990B | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300072563 DEMISTER PAD,DWG.448-8972,FOR VD-671A | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100005440 SEAL,MECHANICAL,MODEL WF314,GRAPHITE | B | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4100042640 TUBING,SIZE UG880,NBR | S | Reduce | Potentially obsolete | 24 M | – | 3 / 10 | don't stock | – | 0% | −Rp 8.2M |
| 4100042954 TUBING,SIZE WH48,VITON | C | Reduce | Potentially obsolete | 24 M | – | 5 / 10 | don't stock | – | 0% | −Rp 8.2M |
| 4300028192 RING,WEAR,DWG.389-5111,FOR PP-1426A | B | Reduce | Non-moving | 2 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4300041600 RING,WEAR,DWG.621-2931,FOR PP-1751A | B | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4300007714 RING,WEAR,DWG.452-6414,FOR PP-1821 | A | Reduce | Slow-moving | 3 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 8.2M |
| 4100012902 RING,WEAR,SIZE DB478,A105 | S | Reduce | Potentially obsolete | 1 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 8.2M |
| 4300067245 RING,WEAR,DWG.701-7374,FOR PP-592 | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4300053603 RING,WEAR,DWG.430-2269,FOR PP-795D | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4300053635 RING,WEAR,DWG.278-2482,FOR PP-795D | A | Reduce | Non-moving | 2 EA | – | 3 / 6 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4100012446 RING,WEAR,TYPE LV543,PTFE | B | Reduce | Non-moving | 2 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4300036367 RING,WEAR,DWG.927-9909,FOR PP-812A | B | Reduce | Non-moving | 2 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 8.2M |
| 4300018436 RING,WEAR,DWG.116-9950,FOR PP-902B | A | Reduce | Non-moving | 3 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 8.2M |
| 4100016238 GASKET,SW,12IN,300#,GRAPHITE | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 4 / 4 / 8 | – | 1% | – |
| 4300060077 SLEEVE,SHAFT,DWG.334-7162,FOR PP-1033 | A | Reduce | Non-moving | 2 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | −Rp 8.1M |
| 4100009328 SLEEVE,SHAFT,MODEL MH452,PTFE | A | Reduce | Non-moving | 2 EA | – | 4 / 9 | 0 / 0 / 1 | – | 0% | −Rp 8.1M |
| 4300018548 SLEEVE,SHAFT,DWG.190-1071,FOR PP-1471A | A | Reduce | Non-moving | 3 EA | – | 1 / 3 | 1 / 1 / 2 | – | 0% | −Rp 8.1M |