Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
1,064 spare parts
Order value Rp 2.5B · excess value Rp 0 · page 22 of 22
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300009763Long-lead BEARING,THRUST PAD,DWG.826-2243,FOR KC-4 | A | Maintain | Insurance gap | 0 SET | 1 | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100039535 VALVE,NEEDLE,1/4IN ODT,6000PSI,SS316 | A | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | – |
| 4200002511 GLAND,CABLE,TYPE QH454,MONEL | A | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | – |
| 4100041340 CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316 | B | Monitor | Insurance gap | 0 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | – |
| 4100102631 ANTIRUST,SPRAY TYPE,350ML/CAN,TYPE-B | B | Monitor | Insurance gap | 0 CAN | – | 2 / 4 | 0 / 0 / 4 | – | 0% | – |
| 4200003227 TERMINAL BLOCK,TYPE MM228,VITON | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4200004068 TERMINAL BLOCK,SIZE YE349,PTFE | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300005511Long-lead BEARING,JOURNAL,DWG.967-6974,FOR KT-460B | A | Maintain | Insurance gap | 0 SET | 2 | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100070815Safety-criticalLong-lead NOZZLE,SAFETY VALVE,SIZE RK669,INCOLOY | S | Maintain | Insurance gap | 0 EA | 1 | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100088920 BLADE,ROTOR,SIZE LJ134,NBR | A | Maintain | Insurance gap | 0 SET | 4 | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300038701Long-lead TRIM SET,CONTROL VALVE,DWG.235-7752,FOR | A | Maintain | Insurance gap | 0 SET | 2 | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300068107 RING,WEAR,DWG.695-3445,FOR PP-210A | B | Maintain | Insurance gap | 0 EA | 2 | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100067356Safety-criticalLong-lead SPRING,SAFETY VALVE,SIZE UA718,CS | B | Maintain | Insurance gap | 0 EA | 2 | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300057277Safety-criticalLong-lead SPRING,SAFETY VALVE,DWG.884-7624,FOR PRV | S | Maintain | Insurance gap | 0 EA | 3 | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
← PreviousPage 22 / 22