Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 130 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4200011154 FAN,COOLING MOTOR,DWG.778-5405,FOR PP-11 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4200006774 FAN,COOLING MOTOR,TYPE SC294,A105 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4200010724 FAN,COOLING MOTOR,DWG.671-9674,FOR PP-15 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4200010263 FAN,COOLING MOTOR,DWG.629-5352,FOR PP-44 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4200010909 FAN,COOLING MOTOR,DWG.834-9743,FOR PP-68 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4200011391 FAN,COOLING MOTOR,DWG.179-2108,FOR PP-77 | C | Maintain | No stock needed | 0 EA | – | 2 / 4 | don't stock | – | 0% | – |
| 4200011552 FAN,COOLING MOTOR,DWG.453-8994,FOR PP-94 | C | Maintain | No stock needed | 0 EA | – | 5 / 16 | don't stock | – | 0% | – |
| 4100040392 CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316 | A | Reduce | Non-moving | 6 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 614,265 |
| 4100041534 CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316 | A | Reduce | Non-moving | 6 EA | – | 5 / 9 | 0 / 0 / 1 | – | 0% | −Rp 614,265 |
| 4100041195 CONNECTOR,MALE,1/2IN ODT,1/4IN NPT,SS316 | S | Reduce | Potentially obsolete | 5 EA | – | 1 / 3 | don't stock | – | 0% | −Rp 614,265 |
| 4100090001 VALVE,GOVERNOR,MODEL ZN162,INCOLOY | A | Maintain | Critical insurance spare | 1 ASS | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100091862 GREASE,COMPLEX,NLGI 1,180KG | A | Monitor | Critical insurance spare | 3 KG | – | 2 / 6 | 0 / 0 / 98 | reorder ~30 Sept 2030 | 0% | – |
| 4100092387 GREASE,POLYUREA,NLGI 2,180KG | A | Monitor | Critical insurance spare | 8 KG | – | 5 / 11 | 0 / 0 / 98 | reorder ~29 May 2037 | 0% | – |
| 4100091994 GREASE,LITHIUM,NLGI 3,0.4KG | A | Monitor | Critical insurance spare | 3 KG | – | 2 / 4 | 0 / 0 / 98 | reorder ~30 Sept 2030 | 0% | – |
| 4100092836 GREASE,POLYUREA,NLGI 3,16KG | A | Monitor | Critical insurance spare | 2 KG | – | 1 / 3 | 0 / 0 / 98 | reorder ~31 May 2029 | 0% | – |
| 4100091885 GREASE,COMPLEX,NLGI 1,16KG | A | Monitor | Critical insurance spare | 1 KG | – | 3 / 7 | 0 / 0 / 98 | reorder ~31 Jan 2028 | 0% | – |
| 4200000508 TERMINAL,LUG,PIN,5.5X5MM,CRIMP | C | Monitor | Insurance gap | 0 EA | – | 1 / 2 | 0 / 0 / 162 | – | 0% | – |
| 4200000724 TERMINAL,LUG,RING,1.25X4MM,CRIMP | C | Monitor | Potentially obsolete | 2 EA | – | 1 / 2 | 0 / 0 / 162 | reorder ~14 Apr 2027 | 0% | – |
| 4100029000 PIPE,1IN,SCH160,P11,SMLS,6M LG | B | Monitor | Insurance gap | 0 LG | – | 2 / 4 | 0 / 0 / 3 | – | 0% | – |
| 4200003035 TERMINAL BLOCK,SIZE AK895,NBR | C | Reduce | Potentially obsolete | 25 EA | – | 10 / 18 | 0 / 0 / 1 | – | 0% | −Rp 599,688 |
| 4100022869 O-RING,NBR,77MM ID,5.3MM CS | A | Reduce | Non-moving | 21 EA | – | 1 / 2 | 3 / 3 / 6 | – | 0% | −Rp 595,260 |
| 4100020386 O-RING,NBR,234MM ID,5.3MM CS | S | Reduce | Potentially obsolete | 18 EA | – | 0 / 0 | 0 / 0 / 3 | – | 0% | −Rp 595,260 |
| 4300061755 SEAT RING,VALVE,DWG.619-8656,FOR FCV-108 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300028389 SEAT RING,VALVE,DWG.562-9304,FOR FCV-108 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300064766 SEAT RING,VALVE,DWG.705-2245,FOR FCV-146 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300054644 SEAT RING,VALVE,DWG.402-5182,FOR FCV-151 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300061728 SEAT RING,VALVE,DWG.178-8909,FOR FCV-157 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300063916 SEAT RING,VALVE,DWG.361-5797,FOR FCV-180 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300018556 SEAT RING,VALVE,DWG.775-1191,FOR FCV-421 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100051647 SEAT RING,VALVE,MODEL AY405,MONEL | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100095132 TRAY VALVE,SIZE IE201,INCOLOY | S | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100095687 TRAY VALVE,SIZE ZW682,VITON | S | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300020825 TRAY VALVE,DWG.780-6250,FOR CL-104 | S | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300072646 TRAY VALVE,DWG.364-4348,FOR CL-1546 | S | Reduce | Potentially obsolete | 8 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 591,673 |
| 4300064412 TRAY VALVE,DWG.508-7007,FOR CL-932 | A | Reduce | Non-moving | 9 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 591,673 |
| 4100083145 BEARING,THRUST PAD,SIZE WH138,A105 | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4200002086 GLAND,CABLE,MODEL QO408,A182F11 | B | Monitor | Insurance gap | 0 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | – |
| 4300063759 SEAT RING,VALVE,DWG.433-4196,FOR FCV-678 | C | Monitor | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100039984 CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316 | A | Reduce | Excess | 22 EA | – | 13 / 36 | 5 / 6 / 20 | – | 0% | – |
| 4300069285Long-lead IMPELLER,DWG.441-7853,FOR PP-362B | B | Monitor | Slow-moving | 1 EA | 5 | 1 / 2 | 3 / 3 / 6 | – | 0% | – |
| 4100076287 CERAMIC FIBER,BLANKET,50T,128KG/M3,1430C | A | Monitor | Critical insurance spare | 4 RL | – | 0 / 0 | 4 / 4 / 8 | – | 0% | – |
| 4100100299 BOLT,ANCHOR,MODEL RY821,CS | A | Reduce | Non-moving | 33 EA | – | 10 / 29 | 2 / 2 / 4 | – | 0% | −Rp 580,261 |
| 4300061081 POSITIONER,VALVE,DWG.538-6469,FOR TCV-12 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300050866 POSITIONER,VALVE,DWG.771-3393,FOR TCV-16 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300041507 POSITIONER,VALVE,DWG.640-2118,FOR TCV-17 | C | Maintain | No stock needed | 0 EA | – | 2 / 4 | don't stock | – | 0% | – |
| 4300047581 POSITIONER,VALVE,DWG.407-3706,FOR TCV-18 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300041683 POSITIONER,VALVE,DWG.808-3247,FOR TCV-20 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300037354 POSITIONER,VALVE,DWG.563-8763,FOR TCV-70 | C | Maintain | No stock needed | 0 EA | – | 2 / 4 | don't stock | – | 0% | – |
| 4300009859 POSITIONER,VALVE,DWG.750-1215,FOR TCV-72 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300055048 SEAT RING,VALVE,DWG.861-7093,FOR FCV-166 | S | Maintain | No stock needed | 0 EA | 2 | 0 / 0 | don't stock | – | 0% | – |