Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 131 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4200001348 GLAND,CABLE,SIZE NF34,PTFE | A | Reduce | Excess | 29 EA | – | 6 / 18 | 7 / 7 / 18 | – | 0% | −Rp 571,692 |
| 4300037203 SLEEVE,SHAFT,DWG.738-1745,FOR PP-111C | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100009003 SLEEVE,SHAFT,TYPE SB848,CS | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300002169 SLEEVE,SHAFT,DWG.483-2292,FOR PP-471B | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300012625 SLEEVE,SHAFT,DWG.749-8805,FOR PP-978 | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100028740 PIPE,1/2IN,STD,SS316,SMLS,6M LG | B | Monitor | Insurance gap | 0 LG | – | 1 / 2 | 0 / 0 / 3 | – | 0% | – |
| 4100083869 BEARING,THRUST PAD,TYPE WO98,A105 | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300054887 POSITIONER,VALVE,DWG.108-7971,FOR LCV-18 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300025283 POSITIONER,VALVE,DWG.314-5177,FOR LCV-17 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4200008804 CABLE,INSTRUMENT,8PR X 0.75MM2,ARMOURED | C | Reduce | Potentially obsolete | 10 M | – | 5 / 11 | don't stock | – | 0% | −Rp 556,220 |
| 4100023054 O-RING,VITON,62MM ID,5.3MM CS | B | Reduce | Non-moving | 17 EA | – | 3 / 9 | 0 / 0 / 3 | – | 0% | −Rp 555,576 |
| 4200001548 GLAND,CABLE,TYPE AN581,A182F11 | A | Reduce | Non-moving | 5 EA | – | 4 / 9 | 0 / 0 / 2 | – | 0% | −Rp 551,745 |
| 4200002670 GLAND,CABLE,TYPE DH668,VITON | B | Reduce | Non-moving | 5 EA | – | 2 / 6 | 0 / 0 / 2 | – | 0% | −Rp 551,745 |
| 4100060630 TRANSMITTER,TEMP,MODEL PX776,GRAPHITE | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100030036 ELBOW,45DEG,8IN,SCH40,SS316,BW | C | Maintain | No stock needed | 0 EA | – | 4 / 12 | don't stock | – | 0% | – |
| 4200006953 FAN,COOLING MOTOR,TYPE LI523,CS | C | Monitor | Slow-moving | 1 EA | – | 1 / 2 | 0 / 0 / 1 | – | 0% | – |
| 4300066183 IMPELLER,DWG.552-2721,FOR PP-408B | A | Monitor | Slow-moving | 3 EA | – | 1 / 3 | 2 / 2 / 3 | – | 0% | – |
| 4200010551Long-lead FAN,COOLING MOTOR,DWG.796-6242,FOR PP-90 | A | Monitor | Slow-moving | 7 EA | – | 0 / 0 | 6 / 6 / 9 | reorder ~14 Mar 2027 | 0% | – |
| 4200003608 TERMINAL BLOCK,SIZE OS681,A105 | C | Reduce | Potentially obsolete | 8 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 543,344 |
| 4100056995Long-lead TRANSMITTER,PRESS,SIZE HW100,SS316 | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4200010202 FAN,COOLING MOTOR,DWG.106-5473,FOR PP-17 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100043528Long-lead TRIM SET,CONTROL VALVE,MODEL FY873,VITON | B | Monitor | Slow-moving | 3 SET | 2 | 1 / 3 | 0 / 1 / 3 | – | 0% | – |
| 4100018378 GASKET,SW,3/4IN,600#,GRAPHITE | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 4 | – | 0% | – |
| 4100056843 TRANSMITTER,PRESS,TYPE UJ406,CS | B | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100091701 GREASE,POLYUREA,NLGI 3,180KG | B | Reduce | Non-moving | 3 KG | – | 1 / 3 | don't stock | – | 0% | −Rp 535,471 |
| 4300005257 SEAL,LABYRINTH,DWG.885-1287,FOR KT-460B | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4300005435 SEAL,LABYRINTH,DWG.471-7504,FOR KT-460B | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100031572 TEE,6IN,SCH80,A105,BW | B | Reduce | Non-moving | 1 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 528,853 |
| 4300049070 POSITIONER,VALVE,DWG.717-5921,FOR FCV-10 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100099066 SCREW,TAPPING,M4X20MM,SS304 | A | Maintain | Critical insurance spare | 204 EA | – | 2 / 5 | 114 / 117 / 234 | – | 0% | – |
| 4100000708Long-lead BEARING,BALL,1ROW,DEEP GROOVE,6311 C3 | A | Monitor | Healthy | 1 EA | 6 | 1 / 2 | 5 / 6 / 12 | reorder ~06 Dec 2026 | 0% | – |
| 4100046311 PACKING SET,VALVE,MODEL VT793,CS | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 0% | – |
| 4100020100 O-RING,NBR,31MM ID,2.5MM CS | A | Reduce | Non-moving | 19 EA | – | 10 / 22 | 3 / 3 / 6 | – | 0% | −Rp 515,892 |
| 4300054180 POSITIONER,VALVE,DWG.924-2601,FOR FCV-12 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300073204 POSITIONER,VALVE,DWG.573-9580,FOR FCV-13 | C | Maintain | No stock needed | 0 EA | – | 5 / 12 | don't stock | – | 0% | – |
| 4300064790 POSITIONER,VALVE,DWG.399-2353,FOR FCV-14 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300051969 POSITIONER,VALVE,DWG.194-1743,FOR FCV-15 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300021426 POSITIONER,VALVE,DWG.343-3281,FOR FCV-15 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300018604 POSITIONER,VALVE,DWG.100-3212,FOR FCV-42 | C | Maintain | No stock needed | 0 EA | – | 5 / 15 | don't stock | – | 0% | – |
| 4100050130 POSITIONER,VALVE,SIZE AN510,GRAPHITE | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300012551 POSITIONER,VALVE,DWG.399-9658,FOR FCV-55 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100049962 POSITIONER,VALVE,MODEL DJ201,VITON | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4300057259 POSITIONER,VALVE,DWG.300-3314,FOR FCV-91 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100101998 ANTIRUST,SPRAY TYPE,500ML/CAN,TYPE-A | C | Reduce | Potentially obsolete | 7 CAN | – | 4 / 7 | don't stock | – | 0% | −Rp 510,934 |
| 4100108330 OIL,LUBRICANT,ISO VG 150,SYNTHETIC,20L | A | Monitor | Insurance gap | 0 L | – | 2 / 5 | 0 / 0 / 11 | – | 0% | – |
| 4100108308 OIL,LUBRICANT,ISO VG 68,SYNTHETIC,209L | A | Maintain | Critical insurance spare | 9 L | – | 3 / 5 | 0 / 0 / 11 | – | 0% | – |
| 4100094751 TUBE PLUG,EXCHANGER,TYPE BQ684,INCOLOY | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 505,158 |
| 4100094297 TUBE PLUG,EXCHANGER,MODEL VZ326,PTFE | B | Reduce | Non-moving | 3 EA | – | 2 / 6 | 1 / 1 / 2 | – | 0% | −Rp 505,158 |
| 4100093761 TUBE PLUG,EXCHANGER,TYPE YK627,INCOLOY | B | Reduce | Non-moving | 3 EA | – | 2 / 6 | 1 / 1 / 2 | – | 0% | −Rp 505,158 |
| 4100008783Long-lead SLEEVE,SHAFT,SIZE JT446,CS | A | Monitor | Healthy | 6 EA | 5 | 1 / 3 | 9 / 10 / 12 | reorder ~16 Dec 2026 | 0% | – |