Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 83 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300026033 BEARING,THRUST PAD,DWG.777-9518,FOR KC-2 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100059334 TRANSMITTER,TEMP,SIZE DH566,A105 | A | Monitor | Insurance gap | 0 EA | – | 4 / 6 | 0 / 0 / 1 | – | 2% | – |
| 4300031253 SLEEVE,SHAFT,DWG.425-9285,FOR PP-1597B | B | Reduce | Non-moving | 4 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 24.3M |
| 4300026950 SLEEVE,SHAFT,DWG.408-9201,FOR PP-1862 | A | Reduce | Non-moving | 5 EA | – | 3 / 4 | 1 / 1 / 2 | – | 0% | −Rp 24.3M |
| 4300049001 SLEEVE,SHAFT,DWG.891-2566,FOR PP-410 | B | Reduce | Non-moving | 5 EA | – | 0 / 0 | 1 / 1 / 2 | – | 0% | −Rp 24.3M |
| 4300071218 SLEEVE,SHAFT,DWG.976-9529,FOR PP-497A | B | Reduce | Slow-moving | 7 EA | – | 0 / 0 | 2 / 2 / 4 | – | 0% | −Rp 24.3M |
| 4300068479 SLEEVE,SHAFT,DWG.553-7783,FOR PP-588 | A | Reduce | Non-moving | 4 EA | – | 3 / 8 | 0 / 0 / 1 | – | 0% | −Rp 24.3M |
| 4100004256 BEARING,BALL,ANGULAR,NU305BDB | B | Reduce | Non-moving | 19 EA | – | 4 / 8 | 0 / 0 / 2 | – | 0% | −Rp 24.2M |
| 4100062816 THERMOWELL,SIZE GG122,MONEL | C | Reduce | Potentially obsolete | 4 EA | – | 2 / 5 | don't stock | – | 0% | −Rp 24.2M |
| 4300021343 THERMOWELL,DWG.278-7286,FOR TEL-1530 | C | Reduce | Potentially obsolete | 4 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 24.2M |
| 4300051139 THERMOWELL,DWG.682-1066,FOR TEL-1946-24B | A | Reduce | Non-moving | 4 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 24.2M |
| 4300073899 THERMOWELL,DWG.853-4699,FOR TEL-657 | C | Reduce | Potentially obsolete | 4 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 24.2M |
| 4100061741 THERMOCOUPLE,J-2ELMNT,6.4X600LG | A | Monitor | Critical insurance spare | 1 EA | – | 0 / 0 | 2 / 2 / 4 | – | 2% | – |
| 4100026836 STUDBOLT,5/8INX70MM,B8M/8M | B | Monitor | Critical insurance spare | 8 EA | – | 5 / 8 | 27 / 27 / 54 | – | 3% | – |
| 4100030403 ELBOW,45DEG,3/4IN,3000#,SS316,BW | A | Monitor | Critical insurance spare | 4 EA | – | 2 / 5 | 5 / 5 / 10 | – | 2% | – |
| 4100008368 IMPELLER,TYPE XT432,MONEL | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 3% | – |
| 4300065326 IMPELLER,DWG.597-8955,FOR PP-805B | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 3% | – |
| 4100064449 GAUGE,PRESSURE,0-16KG/CM2,4IN DIAL | C | Reduce | Potentially obsolete | 9 EA | – | 3 / 6 | don't stock | – | 0% | −Rp 23.9M |
| 4100054008Safety-criticalSign-off SWITCH,LIMIT,MODEL IQ56,VITON | A | Reduce | Non-moving | 6 EA | – | 4 / 6 | 0 / 0 / 2 | – | 0% | −Rp 23.8M |
| 4100054048Safety-criticalSign-off SWITCH,LIMIT,SIZE DF419,A182F11 | B | Reduce | Non-moving | 6 EA | – | 0 / 0 | 0 / 0 / 2 | – | 0% | −Rp 23.8M |
| 4300029493 BLADE,ROTOR,DWG.871-2926,FOR KT-447 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 12% | – |
| 4300029977 BLADE,ROTOR,DWG.484-9437,FOR KT-447 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 12% | – |
| 4100088152 BLADE,ROTOR,SIZE HY693,A182F11 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 12% | – |
| 4300030226 BLADE,ROTOR,DWG.561-2518,FOR KT-447 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 12% | – |
| 4100026099 STUDBOLT,7/8INX100MM,B8M/8M | A | Monitor | Critical insurance spare | 2 EA | – | 1 / 2 | 27 / 27 / 54 | – | 2% | – |
| 4300071144 SEAL,LABYRINTH,DWG.642-4872,FOR KC-279C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300071182 SEAL,LABYRINTH,DWG.279-2393,FOR KC-279C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300002270 SEAL,LABYRINTH,DWG.508-1126,FOR KC-316D | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300002366 SEAL,LABYRINTH,DWG.733-9583,FOR KC-316D | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300008377 SEAL,LABYRINTH,DWG.973-1687,FOR KC-391D | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300015569 SEAL,LABYRINTH,DWG.236-1512,FOR KC-396 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300056493 SEAL,LABYRINTH,DWG.669-4720,FOR KC-464A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300056591 SEAL,LABYRINTH,DWG.636-9735,FOR KC-464A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300056667 SEAL,LABYRINTH,DWG.292-5550,FOR KC-464A | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300042059 SEAL,LABYRINTH,DWG.536-4799,FOR KC-801 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300042082 SEAL,LABYRINTH,DWG.527-2290,FOR KC-801 | A | Monitor | Insurance gap | 0 SET | – | 10 / 17 | 0 / 0 / 1 | – | 2% | – |
| 4100034907 VALVE,GATE,4IN,800#,A105,RF | S | Reduce | Potentially obsolete | 11 EA | – | 10 / 17 | 0 / 0 / 2 | – | 0% | −Rp 23.7M |
| 4300057439 COUPLING,DWG.244-6854,FOR PP-411A | S | Monitor | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 12% | – |
| 4100072766 FIREBRICK,INSUL,28,76T,114W,230L | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 12% | – |
| 4300058464 COUPLING,DWG.110-3320,FOR PP-203B | S | Reduce | Potentially obsolete | 2 SET | – | 1 / 3 | don't stock | – | 0% | −Rp 23.3M |
| 4100026166 STUDBOLT,5/8INX90MM,B16/4 | A | Monitor | Critical insurance spare | 6 EA | – | 2 / 6 | 27 / 27 / 54 | – | 2% | – |
| 4100082820 BEARING,THRUST PAD,TYPE PX742,SS304 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300070138 SPRING,SAFETY VALVE,DWG.185-6254,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 2% | – |
| 4100067475 SPRING,SAFETY VALVE,TYPE WQ913,PTFE | A | Monitor | Insurance gap | 0 EA | – | 10 / 31 | 1 / 1 / 2 | – | 2% | – |
| 4300070559 SPRING,SAFETY VALVE,DWG.732-3643,FOR KT- | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 2% | – |
| 4100045776Safety-criticalSign-off PACKING SET,VALVE,MODEL CQ192,GRAPHITE | A | Reduce | Non-moving | 8 SET | – | 3 / 7 | 0 / 0 / 2 | – | 0% | −Rp 23.0M |
| 4100046130 PACKING SET,VALVE,MODEL ID889,GRAPHITE | A | Reduce | Non-moving | 8 SET | – | 2 / 5 | 0 / 0 / 2 | – | 0% | −Rp 23.0M |
| 4100046717 PACKING SET,VALVE,SIZE AZ271,A105 | C | Reduce | Potentially obsolete | 6 SET | – | 4 / 12 | don't stock | – | 0% | −Rp 23.0M |
| 4100100285 BOLT,ANCHOR,MODEL JH987,CS | A | Monitor | Insurance gap | 0 EA | – | 2 / 3 | 2 / 2 / 4 | – | 2% | – |
| 4100002364 BEARING,ROLLER,CYL,1ROW,6318-2Z | C | Reduce | Potentially obsolete | 16 EA | – | 5 / 11 | don't stock | – | 0% | −Rp 22.8M |