Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 84 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4100093910 TUBE PLUG,EXCHANGER,TYPE ZR854,A182F11 | B | Reduce | Non-moving | 46 EA | – | 10 / 21 | 0 / 0 / 1 | – | 0% | −Rp 22.7M |
| 4100017006 GASKET,SHEET,1-1/2IN,300#,GR/304 | A | Reduce | Non-moving | 114 EA | – | 1 / 3 | 4 / 4 / 8 | – | 0% | −Rp 22.7M |
| 4300052080 SLEEVE,SHAFT,DWG.616-2016,FOR PP-866A | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 3% | – |
| 4100107920 OIL,LUBRICANT,ISO VG 46,SYNTHETIC,1L | A | Monitor | Insurance gap | 0 L | – | 1 / 3 | 11 / 11 / 22 | – | 2% | – |
| 4100052821Safety-criticalSign-off SOLENOID VALVE,TYPE DU404,GRAPHITE | S | Reduce | Non-moving | 3 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 22.6M |
| 4300057953 SEAT RING,VALVE,DWG.772-9788,FOR FCV-114 | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 22.6M |
| 4100050380 SEAT RING,VALVE,TYPE HU803,INCOLOY | A | Reduce | Non-moving | 3 EA | – | 2 / 6 | 0 / 0 / 1 | – | 0% | −Rp 22.6M |
| 4100050674 SEAT RING,VALVE,MODEL GR505,MONEL | C | Reduce | Potentially obsolete | 2 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 22.6M |
| 4300061319 SEAT RING,VALVE,DWG.101-4034,FOR FCV-165 | C | Reduce | Potentially obsolete | 2 EA | – | 2 / 6 | don't stock | – | 0% | −Rp 22.6M |
| 4100051361 SEAT RING,VALVE,SIZE HF77,VITON | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 22.6M |
| 4300075079 SEAT RING,VALVE,DWG.529-3088,FOR FCV-190 | S | Reduce | Potentially obsolete | 2 EA | – | 2 / 6 | don't stock | – | 0% | −Rp 22.6M |
| 4300018759 SEAT RING,VALVE,DWG.663-9489,FOR FCV-193 | B | Reduce | Non-moving | 3 EA | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 22.6M |
| 4100050418 SEAT RING,VALVE,SIZE JV569,PTFE | C | Reduce | Potentially obsolete | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 22.6M |
| 4300018592 SEAT RING,VALVE,DWG.444-9393,FOR FCV-421 | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 22.6M |
| 4300068723 SEAT RING,VALVE,DWG.149-7771,FOR LCV-106 | A | Reduce | Non-moving | 3 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 22.6M |
| 4300012420 SEAT RING,VALVE,DWG.795-7836,FOR LCV-129 | S | Reduce | Potentially obsolete | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 22.6M |
| 4100050575 SEAT RING,VALVE,TYPE AK524,VITON | A | Reduce | Excess | 7 EA | – | 0 / 0 | 3 / 3 / 5 | – | 0% | −Rp 22.6M |
| 4300041409 SEAT RING,VALVE,DWG.655-1776,FOR LCV-572 | A | Reduce | Non-moving | 3 EA | – | 2 / 3 | 0 / 0 / 1 | – | 0% | −Rp 22.6M |
| 4300029125 SEAT RING,VALVE,DWG.516-4217,FOR PCV-101 | B | Reduce | Non-moving | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 22.6M |
| 4300038328 SEAT RING,VALVE,DWG.721-5706,FOR PCV-224 | C | Reduce | Non-moving | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 22.6M |
| 4300066940 SEAT RING,VALVE,DWG.402-1543,FOR TCV-148 | A | Reduce | Slow-moving | 4 EA | – | 1 / 2 | 1 / 1 / 2 | – | 0% | −Rp 22.6M |
| 4300050949 SEAT RING,VALVE,DWG.117-7308,FOR TCV-165 | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 22.6M |
| 4300041668 SEAT RING,VALVE,DWG.736-4000,FOR TCV-205 | C | Reduce | Slow-moving | 3 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 22.6M |
| 4300061698 SEAT RING,VALVE,DWG.924-8890,FOR TCV-386 | A | Reduce | Slow-moving | 8 EA | – | 2 / 5 | 3 / 3 / 6 | – | 0% | −Rp 22.6M |
| 4300036544 SEAT RING,VALVE,DWG.194-6148,FOR FCV-190 | A | Reduce | Non-moving | 3 EA | – | 2 / 5 | 0 / 0 / 1 | – | 0% | −Rp 22.6M |
| 4300039426 IMPELLER,DWG.893-4067,FOR PP-1865A | A | Monitor | Healthy | 3 EA | – | 0 / 0 | 2 / 2 / 4 | reorder ~08 Nov 2027 | 2% | – |
| 4100016009 GASKET,RING,1IN,600#,PTFE | B | Monitor | Insurance gap | 0 EA | – | 1 / 3 | 4 / 4 / 8 | – | 3% | – |
| 4100017253 GASKET,SHEET,6IN,600#,GR/304 | C | Reduce | Excess | 108 EA | – | 1 / 3 | 0 / 0 / 4 | – | 0% | −Rp 22.3M |
| 4100020730 O-RING,NBR,96MM ID,3.5MM CS | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 3 / 3 / 6 | – | 2% | – |
| 4100031826 TEE,10IN,SCH40,A234WPB,SW | B | Reduce | Non-moving | 42 EA | – | 10 / 30 | don't stock | – | 0% | −Rp 22.2M |
| 4100046402 PACKING SET,VALVE,SIZE IQ966,A105 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 2 | – | 2% | – |
| 4300013058 BLADE,ROTOR,DWG.482-1599,FOR KT-308B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300013240 BLADE,ROTOR,DWG.172-5454,FOR KT-308B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300013321 BLADE,ROTOR,DWG.110-1661,FOR KT-308B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300013469 BLADE,ROTOR,DWG.384-9156,FOR KT-308B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4300013636 BLADE,ROTOR,DWG.818-2988,FOR KT-308B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100088117 BLADE,ROTOR,SIZE RQ136,A182F11 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4200002298 GLAND,CABLE,TYPE WC514,GRAPHITE | C | Reduce | Potentially obsolete | 120 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 22.1M |
| 4300015380 SLEEVE,SHAFT,DWG.600-6735,FOR PP-1022 | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 1 / 1 / 2 | – | 2% | – |
| 4100047026 DIAPHRAGM,ACTUATOR,SIZE QZ394,VITON | B | Reduce | Non-moving | 6 EA | – | 4 / 8 | 0 / 0 / 1 | – | 0% | −Rp 21.9M |
| 4100048505 DIAPHRAGM,ACTUATOR,SIZE QQ258,SS304 | C | Reduce | Potentially obsolete | 5 EA | – | 0 / 0 | don't stock | – | 0% | −Rp 21.9M |
| 4100035263 VALVE,GATE,1/2IN,150#,CF8,RF | C | Monitor | Insurance gap | 0 EA | – | 5 / 7 | 0 / 0 / 2 | – | 5% | – |
| 4300050758Long-lead BEARING,JOURNAL,DWG.707-9312,FOR KC-452 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 2% | – |
| 4100033104 FLANGE,SO,1/4IN,150#,SS316,RF | C | Monitor | Healthy | 1 EA | – | 1 / 2 | 0 / 0 / 5 | reorder ~23 Mar 2027 | 5% | – |
| 4300074686 COUPLING,DWG.679-4606,FOR KC-226 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 1 / 1 / 2 | – | 2% | – |
| 4300046655 COUPLING,DWG.822-1082,FOR KC-308B | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 1 / 1 / 2 | – | 2% | – |
| 4300015948 COUPLING,DWG.403-3433,FOR KC-854C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 1 / 1 / 2 | – | 2% | – |
| 4100097215Long-lead DEMISTER PAD,MODEL MN640,VITON | A | Reduce | Slow-moving | 9 EA | 1 | 0 / 0 | 4 / 4 / 6 | – | 0% | −Rp 21.7M |
| 4100107418 OIL,LUBRICANT,ISO VG 220,SYNTHETIC,1L | A | Monitor | Critical insurance spare | 8 L | – | 4 / 11 | 11 / 11 / 22 | – | 2% | – |
| 4100107308 OIL,LUBRICANT,ISO VG 46,MINERAL,1L | A | Reduce | Slow-moving | 338 L | – | 6 / 14 | 10 / 10 / 22 | – | 0% | −Rp 21.4M |