Sparely
DU

Material List

One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.

Clear filters

7,481 spare parts

Order value Rp 123.8B · excess value Rp 5.62T · page 106 of 150

PartCrit.ActionHealthStockOn orderToday Min / MaxRec. SS / Min / MaxOrderStockout riskValue
4200009921
FAN,COOLING MOTOR,DWG.676-8038,FOR PP-16
A
Reduce
Non-moving6 EA–0 / 00 / 0 / 2–0%−Rp 5.0M
4200009958
FAN,COOLING MOTOR,DWG.110-4472,FOR PP-16
A
Reduce
Non-moving6 EA–0 / 00 / 0 / 2–0%−Rp 5.0M
4200010228
FAN,COOLING MOTOR,DWG.217-4461,FOR PP-17
B
Reduce
Non-moving6 EA–1 / 30 / 0 / 2–0%−Rp 5.0M
4200010802
FAN,COOLING MOTOR,DWG.158-7464,FOR PP-17
A
Reduce
Non-moving6 EA–0 / 00 / 0 / 2–0%−Rp 5.0M
4200011048
FAN,COOLING MOTOR,DWG.373-9845,FOR PP-27
A
Reduce
Non-moving6 EA–3 / 80 / 0 / 2–0%−Rp 5.0M
4200011575
FAN,COOLING MOTOR,DWG.460-3945,FOR PP-50
A
Reduce
Non-moving6 EA–2 / 30 / 0 / 2–0%−Rp 5.0M
4100040262
CONNECTOR,MALE,1/4IN ODT,1/4IN NPT,SS316
A
Reduce
Slow-moving67 EA–1 / 22 / 2 / 3–0%−Rp 3.8M
4100107818
OIL,LUBRICANT,ISO VG 150,SYNTHETIC,1L
A
Monitor
Critical insurance spare2 L–2 / 30 / 0 / 11reorder ~24 Feb 20290%–
4100071738Long-lead
FIREBRICK,INSUL,28,76T,114W,230L
A
Monitor
Healthy418 EA2,9310 / 01,937 / 3,057 / 3,672reorder ~25 Oct 20260%–
4300059909
BEARING,JOURNAL,DWG.990-6143,FOR KC-620A
B
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300060002
BEARING,JOURNAL,DWG.589-8693,FOR KC-620A
B
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300060028
BEARING,THRUST PAD,DWG.779-5372,FOR KC-6
B
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4100057443
TRANSMITTER,DIFF.PRESS,0~10000MMH2O,HART
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4100028859
PIPE,6IN,SCH40,SS316,SMLS,6M LG
A
Monitor
Critical insurance spare1 LG–1 / 20 / 0 / 3reorder ~13 Mar 20320%–
4100023668
O-RING,NBR,136MM ID,2.5MM CS
B
Monitor
Critical insurance spare1 EA–0 / 03 / 3 / 6–1%–
4300035429
RING,WEAR,DWG.375-2009,FOR PP-1659A
C
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–1%–
4100105035
TAPE,PTFE,25MMX10M
C
Monitor
Slow-moving2 RL–1 / 20 / 0 / 6reorder ~12 Oct 20281%–
4100027107
STUDBOLT,7/8INX75MM,B16/4
S
Monitor
Potentially obsolete4 EA–2 / 40 / 0 / 27reorder ~20 Feb 20272%–
4100042172
TUBING,MODEL VR852,A182F11
B
Reduce
Non-moving14 M–3 / 8don't stock–0%−Rp 4.8M
4100057678
TRANSMITTER,DIFF.PRESS,0~2500MMH2O,FF
A
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–0%–
4300069509
BEARING,JOURNAL,DWG.122-5303,FOR KT-513
A
Monitor
Slow-moving1 SET–1 / 20 / 0 / 1–0%–
4300037988
COUPLING,DWG.984-6617,FOR PP-912
B
Monitor
Insurance gap0 SET–0 / 00 / 0 / 1–1%–
4100059974
TRANSMITTER,TEMP,MODEL YZ597,PTFE
S
Monitor
No stock needed0 EA–0 / 0don't stock–2%–
4100041864
TUBING,TYPE UZ48,GRAPHITE
A
Monitor
Healthy13 M150 / 018 / 20 / 40reorder ~22 May 20270%–
4100003755
BEARING,ROLLER,CYL,1ROW,6215BDB
A
Monitor
Insurance gap0 EA–2 / 30 / 0 / 2–0%–
4300055110
POSITIONER,VALVE,DWG.946-2805,FOR TCV-77
C
Maintain
No stock needed0 EA–0 / 0don't stock–1%–
4100006541
SEAL,MECHANICAL,SIZE LG873,NBR
C
Maintain
No stock needed0 SET–0 / 0don't stock–1%–
4300025000
POSITIONER,VALVE,DWG.346-6321,FOR LCV-15
C
Maintain
No stock needed0 EA–0 / 0don't stock–1%–
4100092430
GREASE,POLYUREA,NLGI 3,16KG
A
Reduce
Non-moving124 KG–4 / 90 / 0 / 98–0%−Rp 4.6M
4100033791
FLANGE,WN,1/4IN,150#,A105,RF
C
Reduce
Potentially obsolete5 EA–2 / 6don't stock–0%−Rp 4.6M
4100033631
FLANGE,BLIND,1IN,600#,A105,RF
C
Reduce
Potentially obsolete5 EA–2 / 6don't stock–0%−Rp 4.6M
4100033966
FLANGE,SO,8IN,600#,SS316,RF
B
Reduce
Non-moving10 EA–2 / 40 / 0 / 5–0%−Rp 4.6M
4300029187Long-lead
COUPLING,DWG.444-6140,FOR KC-618B
A
Monitor
Insurance gap0 SET–0 / 00 / 0 / 1–0%–
4100014821
GASKET,RING,12IN,600#,GR/304
A
Reduce
Excess69 EA–3 / 1014 / 15 / 29–0%−Rp 4.6M
4100091942
GREASE,COMPLEX,NLGI 2,0.4KG
C
Reduce
Non-moving46 KG–10 / 28don't stock–0%−Rp 4.6M
4200002172
GLAND,CABLE,MODEL UF899,CS
C
Reduce
Potentially obsolete27 EA–10 / 270 / 0 / 2–0%−Rp 4.6M
4300060222
POSITIONER,VALVE,DWG.768-8503,FOR FCV-66
B
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–1%–
4300048557
COUPLING,DWG.369-5347,FOR PP-1536B
C
Maintain
No stock needed0 SET–2 / 6don't stock–1%–
4200010659
FAN,COOLING MOTOR,DWG.308-5397,FOR PP-17
A
Monitor
Critical insurance spare1 EA–0 / 00 / 0 / 2reorder ~13 Sept 20560%–
4300074305
DEMISTER PAD,DWG.129-4172,FOR VD-1231B
B
Monitor
Insurance gap0 EA–0 / 00 / 0 / 1–1%–
4200000533
TERMINAL,LUG,RING,1.25X3MM,CRIMP
C
Reduce
Excess699 EA–0 / 081 / 85 / 170–0%−Rp 4.5M
4300010817
BEARING,THRUST PAD,DWG.988-6480,FOR KT-3
S
Maintain
No stock needed0 SET–3 / 8don't stock–2%–
4300010851
BEARING,THRUST PAD,DWG.948-1185,FOR KT-3
S
Maintain
No stock needed0 SET–0 / 0don't stock–2%–
4300010970
BEARING,JOURNAL,DWG.766-2207,FOR KT-383A
S
Maintain
No stock needed0 SET–0 / 0don't stock–2%–
4300011023
BEARING,THRUST PAD,DWG.547-1147,FOR KT-3
S
Maintain
No stock needed0 SET–0 / 0don't stock–2%–
4300011217
BEARING,THRUST PAD,DWG.360-9289,FOR KT-3
S
Maintain
No stock needed0 SET–0 / 0don't stock–2%–
4300011550
BEARING,THRUST PAD,DWG.450-9788,FOR KT-3
S
Maintain
No stock needed0 SET–0 / 0don't stock–2%–
4300011609
BEARING,JOURNAL,DWG.541-2731,FOR KT-383A
S
Maintain
No stock needed0 SET–0 / 0don't stock–2%–
4300011969
BEARING,JOURNAL,DWG.855-3200,FOR KT-383A
S
Maintain
No stock needed0 SET–0 / 0don't stock–2%–
4100083071
BEARING,THRUST PAD,MODEL RM102,GRAPHITE
S
Maintain
No stock needed0 SET–0 / 0don't stock–2%–
← PreviousPage 106 / 150Next →