Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 105 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300052680 COUPLING,DWG.418-6177,FOR KC-669 | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300002780 COUPLING,DWG.182-1764,FOR KC-930C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300002914 COUPLING,DWG.686-2727,FOR KC-930C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300065572 COUPLING,DWG.740-5351,FOR KC-636C | A | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100025989 STUDBOLT,1/2INX35MM,B7/2H | A | Monitor | Critical insurance spare | 4 EA | – | 3 / 9 | 0 / 0 / 27 | reorder ~26 Jun 2028 | 1% | – |
| 4200000833 TERMINAL,LUG,FORK,2X3MM,CRIMP | C | Monitor | Slow-moving | 11 EA | – | 9 / 13 | 0 / 0 / 50 | reorder ~17 Oct 2027 | 1% | – |
| 4100051460 SEAT RING,VALVE,SIZE JX936,SS304 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300054302 BEARING,THRUST PAD,DWG.954-4257,FOR KC-5 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 3% | – |
| 4300054368 BEARING,JOURNAL,DWG.213-4513,FOR KC-513 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 3% | – |
| 4100030192 ELBOW,45DEG,6IN,SCH80,SS316,SW | C | Monitor | Slow-moving | 1 EA | – | 1 / 2 | 0 / 0 / 6 | reorder ~06 Sept 2027 | 1% | – |
| 4100031475 TEE,3IN,SCH40,A105,SW | C | Monitor | Slow-moving | 4 EA | – | 1 / 2 | 0 / 0 / 5 | – | 1% | – |
| 4100020468 O-RING,EPDM,40MM ID,5.3MM CS | A | Reduce | Non-moving | 140 EA | – | 3 / 8 | 3 / 3 / 6 | – | 0% | −Rp 5.3M |
| 4100065107 GAUGE,PRESSURE,0-10KG/CM2,4IN DIAL | C | Reduce | Potentially obsolete | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 5.3M |
| 4100065055 GAUGE,PRESSURE,0-100KG/CM2,6IN DIAL | C | Reduce | Potentially obsolete | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 5.3M |
| 4100031512 TEE,12IN,3000#,A234WPB,SW | C | Reduce | Potentially obsolete | 10 EA | – | 10 / 30 | don't stock | – | 0% | −Rp 5.3M |
| 4200011481 FAN,COOLING MOTOR,DWG.366-6956,FOR PP-60 | A | Reduce | Slow-moving | 8 EA | – | 0 / 0 | 2 / 2 / 3 | – | 0% | −Rp 5.3M |
| 4100035226 VALVE,GATE,1/2IN,300#,CF8,SW | C | Reduce | Potentially obsolete | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 5.3M |
| 4100036931 VALVE,GLOBE,1/2IN,800#,A216WCB,RF | C | Reduce | Potentially obsolete | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 5.3M |
| 4100035540 VALVE,GATE,6IN,150#,A216WCB,SW | C | Reduce | Potentially obsolete | 2 EA | – | 2 / 3 | don't stock | – | 0% | −Rp 5.3M |
| 4100038337 VALVE,NEEDLE,3/4IN NPT,6000PSI,SS316 | B | Reduce | Non-moving | 4 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | – |
| 4100039028 VALVE,NEEDLE,1/4IN NPT,6000PSI,SS316 | C | Reduce | Potentially obsolete | 2 EA | – | 0 / 0 | don't stock | – | 0% | – |
| 4100039947 VALVE,NEEDLE,1/2IN ODT,3000PSI,SS316 | C | Reduce | Potentially obsolete | 2 EA | – | 1 / 2 | don't stock | – | 0% | −Rp 5.3M |
| 4100038980 VALVE,NEEDLE,3/4IN ODT,6000PSI,SS316 | A | Reduce | Non-moving | 4 EA | – | 2 / 5 | 0 / 0 / 2 | – | 0% | −Rp 5.3M |
| 4100039379 VALVE,NEEDLE,1/2IN NPT,6000PSI,SS316 | S | Reduce | Potentially obsolete | 2 EA | – | 1 / 3 | don't stock | – | 0% | – |
| 4200004634 TERMINAL BLOCK,MODEL PA380,VITON | C | Reduce | Potentially obsolete | 77 EA | – | 2 / 6 | don't stock | – | 0% | −Rp 5.2M |
| 4200006507Long-lead FAN,COOLING MOTOR,SIZE UQ726,A182F11 | A | Reduce | Non-moving | 6 EA | 2 | 2 / 4 | 0 / 0 / 2 | – | 0% | −Rp 5.2M |
| 4100021743 O-RING,NBR,255MM ID,3.5MM CS | S | Monitor | Insurance gap | 0 EA | – | 4 / 7 | 0 / 0 / 3 | – | 3% | – |
| 4100016925 GASKET,RING,6IN,150#,GRAPHITE | A | Reduce | Non-moving | 28 EA | – | 1 / 3 | 0 / 0 / 4 | – | 0% | −Rp 5.2M |
| 4100019799Safety-criticalSign-off O-RING,NBR,270MM ID,3.5MM CS | A | Reduce | Excess | 33 EA | – | 15 / 24 | 9 / 9 / 17 | – | 0% | −Rp 5.2M |
| 4100036428 VALVE,GLOBE,10IN,800#,A105,SW | C | Maintain | No stock needed | 0 EA | 1 | 1 / 2 | don't stock | – | 1% | – |
| 4100046479 PACKING SET,VALVE,SIZE BO421,INCOLOY | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4100002260 BEARING,ROLLER,CYL,1ROW,6309-2Z | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 3% | – |
| 4100040506 CONNECTOR,MALE,1/2IN ODT,1/2IN NPT,SS316 | A | Reduce | Non-moving | 43 EA | – | 3 / 5 | 0 / 0 / 1 | – | 0% | −Rp 5.2M |
| 4300035684 COUPLING,DWG.287-9925,FOR KC-422A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 3% | – |
| 4200001529 GLAND,CABLE,TYPE QK579,NBR | A | Reduce | Non-moving | 30 EA | – | 10 / 31 | 0 / 0 / 2 | – | 0% | −Rp 5.1M |
| 4100028772 PIPE,1-1/2IN,SCH160,SS316,SMLS,6M LG | A | Reduce | Slow-moving | 4 LG | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 5.1M |
| 4100028785 PIPE,2IN,SCH40,SS316,SMLS,6M LG | C | Reduce | Potentially obsolete | 3 LG | – | 1 / 3 | don't stock | – | 0% | −Rp 5.1M |
| 4100029341 PIPE,3/4IN,SCH160,P11,SMLS,6M LG | A | Reduce | Non-moving | 9 LG | – | 5 / 13 | 3 / 3 / 6 | – | 0% | −Rp 5.1M |
| 4100017066 GASKET,SHEET,3IN,150#,PTFE | A | Monitor | Critical insurance spare | 1 EA | – | 1 / 2 | 0 / 0 / 4 | reorder ~31 Oct 2031 | 1% | – |
| 4100021103 O-RING,NBR,88MM ID,3.5MM CS | A | Reduce | Non-moving | 135 EA | – | 2 / 4 | 3 / 3 / 6 | – | 0% | −Rp 5.1M |
| 4300057968 RING,WEAR,DWG.266-8670,FOR PP-1299 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300057981 RING,WEAR,DWG.741-9623,FOR PP-1299 | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300063559 RING,WEAR,DWG.134-5032,FOR PP-1453B | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300073475 RING,WEAR,DWG.160-6139,FOR PP-1891B | B | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100030329 ELBOW,90DEG,12IN,SCH40,A234WPB,BW | S | Reduce | Potentially obsolete | 23 EA | – | 10 / 24 | don't stock | – | 0% | −Rp 5.1M |
| 4100064424 GAUGE,PRESSURE,0-40KG/CM2,4IN DIAL | C | Reduce | Slow-moving | 2 EA | – | 1 / 3 | 0 / 0 / 1 | – | 0% | −Rp 5.0M |
| 4100096744 DEMISTER PAD,MODEL DL422,INCOLOY | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4100025956 STUDBOLT,5/8INX80MM,B16/4 | A | Monitor | Critical insurance spare | 4 EA | – | 1 / 3 | 0 / 0 / 27 | reorder ~14 Aug 2028 | 1% | – |
| 4200010596 FAN,COOLING MOTOR,DWG.375-9991,FOR PP-11 | A | Reduce | Non-moving | 6 EA | – | 2 / 6 | 0 / 0 / 2 | – | 0% | −Rp 5.0M |
| 4200011511 FAN,COOLING MOTOR,DWG.707-2045,FOR PP-12 | C | Reduce | Potentially obsolete | 4 EA | – | 2 / 6 | don't stock | – | 0% | −Rp 5.0M |