Material List
One decision per spare part: reorder (with quantity and date), reduce, monitor or maintain — with dynamic Safety Stock, Reorder Point (= Min) and Max replacing today's static Min–Max.
7,481 spare parts
Order value Rp 123.8B · excess value Rp 5.62T · page 107 of 150
| Part | Crit. | Action | Health | Stock | On order | Today Min / Max | Rec. SS / Min / Max | Order | Stockout risk | Value |
|---|---|---|---|---|---|---|---|---|---|---|
| 4300012136 BEARING,JOURNAL,DWG.212-2255,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300012174 BEARING,THRUST PAD,DWG.484-2743,FOR KT-3 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300012220 BEARING,THRUST PAD,DWG.414-5640,FOR KT-3 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300012249 BEARING,JOURNAL,DWG.698-8299,FOR KT-383A | S | Maintain | No stock needed | 0 SET | – | 1 / 2 | don't stock | – | 2% | – |
| 4300025756 POSITIONER,VALVE,DWG.702-3922,FOR PCV-12 | C | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 1% | – |
| 4100049198 POSITIONER,VALVE,TYPE LR562,CS | C | Maintain | No stock needed | 0 EA | – | 2 / 4 | don't stock | – | 1% | – |
| 4200008213 CABLE,INSTRUMENT,1PR X 1.5MM2,ARMOURED | B | Reduce | Excess | 340 M | – | 80 / 140 | 124 / 130 / 260 | – | 0% | −Rp 4.4M |
| 4300042488 BLADE,ROTOR,DWG.465-5477,FOR KT-778A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300042590 BLADE,ROTOR,DWG.912-5724,FOR KT-778A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300042647 BLADE,ROTOR,DWG.504-8027,FOR KT-778A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300042748 BLADE,ROTOR,DWG.994-6109,FOR KT-778A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300042987 BLADE,ROTOR,DWG.873-7258,FOR KT-778A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300043054 BLADE,ROTOR,DWG.876-8527,FOR KT-778A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300043196 BLADE,ROTOR,DWG.614-1621,FOR KT-778A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300043814 BLADE,ROTOR,DWG.660-1872,FOR KT-778A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300062369 BLADE,ROTOR,DWG.122-9582,FOR KT-875 | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4200001983 GLAND,CABLE,SIZE GM678,A105 | C | Reduce | Potentially obsolete | 24 EA | – | 4 / 11 | don't stock | – | 0% | −Rp 4.4M |
| 4300033943 SLEEVE,SHAFT,DWG.995-9656,FOR PP-298C | S | Maintain | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4100031701 TEE,1IN,SCH40,A105,BW | C | Monitor | Slow-moving | 1 EA | – | 1 / 2 | 0 / 0 / 2 | reorder ~26 Jan 2031 | 1% | – |
| 4100088345 BLADE,ROTOR,MODEL FD695,GRAPHITE | A | Maintain | Critical insurance spare | 1 SET | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100015449 GASKET,RING,1/4IN,150#,GRAPHITE | A | Monitor | Critical insurance spare | 2 EA | – | 1 / 2 | 0 / 0 / 4 | reorder ~21 Aug 2038 | 0% | – |
| 4100048198 DIAPHRAGM,ACTUATOR,SIZE NM236,NBR | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 4.4M |
| 4100047645 DIAPHRAGM,ACTUATOR,TYPE HW335,SS316 | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 4.4M |
| 4100048221 DIAPHRAGM,ACTUATOR,MODEL NG410,A105 | A | Reduce | Non-moving | 2 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | −Rp 4.4M |
| 4100047496 DIAPHRAGM,ACTUATOR,SIZE GG182,NBR | B | Reduce | Non-moving | 2 EA | – | 2 / 4 | 0 / 0 / 1 | – | 0% | −Rp 4.4M |
| 4300017205 BEARING,JOURNAL,DWG.414-8967,FOR KT-264A | S | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 2% | – |
| 4300053966 COUPLING,DWG.389-7025,FOR KC-371B | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300038965 COUPLING,DWG.794-6945,FOR KC-563B | B | Monitor | Insurance gap | 0 SET | – | 0 / 0 | 0 / 0 / 1 | – | 1% | – |
| 4300039104Long-lead TRAY VALVE,DWG.167-6339,FOR CL-890 | B | Reduce | Slow-moving | 21 EA | – | 1 / 3 | 2 / 2 / 3 | – | 0% | −Rp 4.4M |
| 4300070980 TRIM SET,CONTROL VALVE,DWG.257-8394,FOR | C | Maintain | No stock needed | 0 SET | – | 2 / 3 | don't stock | – | 1% | – |
| 4300039383 TRIM SET,CONTROL VALVE,DWG.248-8852,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300068725 THERMOWELL,DWG.767-6678,FOR TEL-298A | S | Monitor | No stock needed | 0 EA | – | 0 / 0 | don't stock | – | 2% | – |
| 4200004765 LAMP,LED,36W,220VAC,FLOOD | B | Reduce | Excess | 33 EA | 7 | 10 / 28 | 7 / 9 / 28 | – | 0% | −Rp 4.3M |
| 4100053848Safety-critical SWITCH,LIMIT,TYPE NT140,NBR | C | Monitor | Stockout | 0 EA | 3 | 0 / 0 | 2 / 2 / 4 | reorder ~13 Dec 2027 | 0% | – |
| 4300010091 TRIM SET,CONTROL VALVE,DWG.956-5573,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300075140 TRIM SET,CONTROL VALVE,DWG.350-7816,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300041694 TRIM SET,CONTROL VALVE,DWG.652-9091,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300071322 TRIM SET,CONTROL VALVE,DWG.649-3226,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4300055580 TRIM SET,CONTROL VALVE,DWG.607-2175,FOR | C | Maintain | No stock needed | 0 SET | – | 0 / 0 | don't stock | – | 1% | – |
| 4100002850 BEARING,BALL,1ROW,DEEP GROOVE,6204 | A | Reduce | Slow-moving | 5 EA | – | 1 / 3 | 0 / 0 / 2 | – | 0% | −Rp 4.3M |
| 4100002006 BEARING,BALL,1ROW,DEEP GROOVE,7213-2Z | S | Reduce | Potentially obsolete | 3 EA | – | 2 / 4 | don't stock | – | 0% | −Rp 4.3M |
| 4100003025 BEARING,BALL,ANGULAR,6207BDB | C | Reduce | Potentially obsolete | 5 EA | – | 1 / 2 | 0 / 0 / 2 | – | 0% | −Rp 4.3M |
| 4100002558 BEARING,ROLLER,CYL,1ROW,NU310 C3 | C | Reduce | Potentially obsolete | 3 EA | – | 2 / 6 | don't stock | – | 0% | −Rp 4.3M |
| 4100001487 BEARING,ROLLER,CYL,1ROW,7216-2Z | A | Reduce | Non-moving | 5 EA | – | 2 / 5 | 0 / 0 / 2 | – | 0% | −Rp 4.3M |
| 4100107625 OIL,LUBRICANT,ISO VG 100,MINERAL,20L | B | Reduce | Non-moving | 38 L | – | 10 / 29 | 0 / 0 / 11 | – | 0% | −Rp 4.3M |
| 4100098752 SCREW,TAPPING,M4X25MM,SS304 | A | Monitor | Critical insurance spare | 213 EA | – | 4 / 9 | 223 / 234 / 438 | – | 0% | – |
| 4100057664 TRANSMITTER,DIFF.PRESS,0~10000MMH2O,FF | A | Monitor | Insurance gap | 0 EA | – | 0 / 0 | 0 / 0 / 1 | – | 0% | – |
| 4100041865 TUBING,MODEL CI496,INCOLOY | S | Monitor | No stock needed | 0 M | – | 35 / 60 | don't stock | – | 2% | – |
| 4100025542 STUDBOLT,5/8INX90MM,B7/2H | A | Monitor | Critical insurance spare | 5 EA | – | 3 / 5 | 0 / 0 / 27 | reorder ~17 Jul 2029 | 0% | – |
| 4100027213 STUDBOLT,3/4INX60MM,B16/4 | A | Monitor | Critical insurance spare | 13 EA | – | 10 / 17 | 0 / 0 / 27 | reorder ~09 Jan 2034 | 0% | – |